The London Borough Of Havering - Home page

No.Condition Text
1.The development to which this permission relates must be begun not later than whichever is the later of the following dates:- (a) The expiration of five years from the date of this permission, or (b) The expiration of two years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last such matter to be approved. Reason:- To comply with Section 92 of the Town and Country Planning Act 1990.
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice). Reason:- The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
3.No individual advertisements displayed on the panel shall contain moving images, animation, video or full motion images or images that resemble road signs or traffic signs. Reason:- In the interests of maintaining highway safety.
4.The interval between successive displays shall be instantaneous (0.1 seconds or less) with no flashing and a smooth instant change into the next static poster image and the complete screen shall change, there shall be no visual effects including swiping or other animated transition methods between successive displays and the display will include a mechanism to freeze the image in the event of a malfunction or default to a blank screen to avoid any flashing error message or pixation. Reason:- In the interests of maintaining highway safety.
5.No skips or construction materials shall be kept on the footpath or carriageway on the TLRN at any time. Should the applicant wish to install scaffolding or a hoarding on the footway whilst undertaking this work separate licences maybe required with TFL, please see https://www.tfl.gov.ul/info-for/urban-planning-and-construction/highway-licences.
6.The footway and carriageway on Eastern Avenue and North Street must be kept to a minimum and should not encroach on the clear space needed to provide safe passage for pedestrians or obstruct the flow of traffic on Eastern Avenue and North Street. All vehicles associated with the installation must only park / stop at permitted locations and within the time periods permitted by existing on-street restrictions.