| No. | Condition Text |
|---|---|
| 1. | The operations do not fall within the provisions of Schedule 2, Part 1, Class B of the Town and Country Planning (General Permitted Development) Order 2015, as amended. Specifically, the edge of the proposed enlargement closest to the eaves of the original roof, would not be no be less than 0.2 metres, measured along the roof slope from the outside edge of the eaves. Additionally the proposed finishing materials would not be of similar appearance to the existing roof. |