The London Borough Of Havering - Home page

No.Condition Text
1.The proposal is not within the tolerance of the provisions of Schedule 2, Part 1, Class B of the Town and Country Planning (General Permitted Development) (England) Order 2015, Sections: B.1 (d) (ii) the cubic content of the resulting roof space would exceed the cubic content of the original roof space by more than:- 50 cubic metres B.2 (b)(i) The enlargement constructed so that the dormer joins the roof of the two storey side/rear extension. (See Plan D03) (bb) the edge of the enlargement closest to the eaves of the original roof is less than 20 centimetres from the eaves, measured along the roof slope from the outside edge of the eaves