The London Borough Of Havering - Home page

No.Condition Text
1.Prior Approval is required (given) in accordance with the details as provided within the application.
2.The building(s) shall be so constructed as to provide sound insulation of 43 DnT,w + Ctr dB (minimum values) against airborne noise and 64 L'nT,w dB (maximum values) against impact noise to the satisfaction of the Local Planning Authority. Reason: To prevent noise nuisance to adjoining properties.
3.Prior to the commencement of any development an assessment shall be undertaken of the impact of road noise emanating from Station Road upon the development in accordance with the methodology contained in the Department of Transport/Welsh office memorandum, "Calculation of Road Traffic Noise", 1988. Reference should be made to the good standard to be found in the World Health Organisation Document number 12 relating to community noise and BS8233:2014. Following this, a scheme detailing measures, which are to protect occupants from road traffic noise shall be submitted to, and approved in writing by the Local Planning Authority and shall be implemented prior to occupation. Reason: To protect future residents against the impact of road noise.
4.Prior to the commencement of any development, an assessment shall be undertaken of the impact of: a) railways noise (in accordance with Technical memorandum, "Calculation of Railway Noise", 1995); and b) vibration from the use of the railway lines; upon the site. Following this, a scheme detailing the measures to protect residents from railway noise and vibration is to be submitted to, approved in writing by the Local Planning Authority, implemented prior to occupancy taking place. Reason: to protect residents from transportation noise and vibration.
5.No building shall be occupied or use commenced until refuse and recycling facilities are provided in accordance with details shown on drawing no. "05 Revision B".The refuse and recycling facilities shall be permanently retained thereafter. Reason:- To protect the amenity of occupiers of the development and also the locality generally and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61.
6.No building shall be occupied or use commenced until enclosed and lockable cycle storage is provided in accordance with details shown on drawing no. "05 Revision B". The cycle storage shall be permanently retained thereafter. Reason:- In the interests of providing a wide range of facilities for non-motor car residents and sustainability.
7.The change of use as described in this Prior Approval notification must be commenced not later than three years from the date of this decision