The London Borough Of Havering - Home page

No.Condition Text
1.Based on the submitted layout, the proposed extensions would not be suitable for the needs of intended occupants and would not provide appropriate level of amenity space to meet the needs of the intended occupants. As such, the proposal would be in conflict with the objectives of Policy 6(v) and (vi) of the Local Plan, Policy H12 of the London Plan as well as the objectives of the NPPF.
2.Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: Consideration was given to seeking amendments, but given conflict with adopted planning policy, notification of intended refusal and the reasons for it was given to the agent in writing 17/08/2026.
3.In the event that this application is allowed through the appeals process, the proposals would be liable for the following CIL contributions: Mayoral CIL (MCIL2) contribution of £10,800 (x £25 per sqm). Havering CIL (HCIL) contribution of £54,000 (x £125 per sqm) Each contribution would be subject to indexation.