| No. | Condition Text |
|---|
| 1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
| 2. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. |
| 3. | No above ground works shall take place in relation to any of the development hereby approved until samples of all materials to be used in the external construction of the buildings are submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials.
Reason:-
Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. Submission of samples prior to commencement will ensure that the appearance of the proposed development will harmonise with the character of the surrounding area.. |
| 4. | Notwithstanding the details shown on submitted drawings no building shall be occupied or use commenced until refuse and recycling facilities are provided in accordance with details which shall previously have been submitted to and approved in writing by the Local Planning Authority. The refuse and recycling facilities shall be permanently retained thereafter.
Reason:-
Insufficient information has been supplied with the application to judge how refuse and recycling will be managed on site. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use will protect the amenity of occupiers of the development and also the locality generally. |
| 5. | Notwithstanding the details shown on approved plans, prior to any above ground works details of all proposed walls, fences and boundary treatment shall be submitted to, and approved in writing by, the Local Planning Authority. The boundary development shall then be carried out in accordance with the approved details and retained permanently thereafter to the satisfaction of the Local Planning Authority.
Reason:
Insufficient information has been supplied with the application to judge the appropriateness of any boundary treatment. Submission of this detail prior to commencement will protect the visual amenities of the development and prevent undue overlooking of adjoining property. |
| 6. | All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works, including any works of demolition; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays.
Reason: To protect residential amenity. |
| 7. | The development hereby approved shall be fitted with Ultra-Low NOx boilers with maximum NOx Emissions less than 40 mg/kWh. Where any installations do not meet this emissions standard it should not be operated without the fitting of suitable NOx abatement equipment or technology as determined by a specialist to ensure comparable emissions. The installation of the boilers shall be carried out in strict accordance with these details and shall thereafter be permanently retained.
Reason: To minimise the impact of building emissions on local air quality. |
| 8. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 no extension or enlargement (including additions to roofs or porches) shall be made to the dwelling hereby approved without the express permission in writing of the Local Planning Authority.
Reason:-
In the interests of amenity and to enable the Local Planning Authority to retain control over future development. |
| 9. | Building Regulations - All dwellings hereby approved shall be constructed to comply with Part M4(2) of the Building Regulations - Accessible and Adaptable Dwellings.
Reason: In order to comply with Policy 7 of the Havering Local Plan and Policy D7 of the London Plan. |
| 10. | All dwellings hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency.
Reason: In order to comply with national optional technical standards as required by Policy SI5 of the London Plan. |
| 11. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no window or other opening (other than those shown on the submitted and approved plan,) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority.
Reason:-
In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future. |
| 12. | The proposed windows on the side elevations at first floor and roof level shall be permanently glazed with obscure glass not less than level 4 on the standard scale of obscurity and shall thereafter be maintained.
Reason:-
In the interests of privacy. |
| 13. | All residential parking spaces within the development hereby approved shall include provision of infrastructure for electric or Ultra-Low Emission vehicles, of which a minimum of one space per dwelling shall have active charging facilities, with passive provision for all remaining spaces. Such provision is to be made prior to the first occupation of the dwellings hereby permitted.
Reason: Provision prior to first occupation of the proposed dwellings hereby permitted will ensure that the development adequately incorporates measures to allow the use of electric vehicles by future occupiers in accordance with Policy T6.1 of the London Plan. |
| 14. | No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of:
a) parking of vehicles of site personnel and visitors;
b) storage of plant and materials;
c) dust management controls;
d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities;
e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority;
f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities;
g) siting and design of temporary buildings;
h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies;
i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded.
j) wheel wash facilities to prevent the deposit of waste onto the highway. This shall include measures to account for scenarios where main facilities fail
And the development shall be carried out in accordance with the approved scheme and statement.
Reason:-
Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects residential amenity. |
| 15. | During construction of the development hereby permitted the trees located at 54 Nelmes Way, Hornchurch, RM11 2QZ shall not be lopped or felled (aside from those indicated within the application submission)
Reason: In order to maintain the existing vegetation at the site not required to be removed by the proposals and which makes an important contribution to the character of the area and to accord with Havering Local Plan 2016-2031 Policy 27. |
| 16. | During the construction of the development hereby permitted any trees within or near to the site shall be protected in accordance with the requirements of BS 5837 (2012) Trees in Relation to Design, Demolition and Construction. The protection measures shall be implemented prior to any below ground works and shall be retained for the entire period of the duration of the any work at the site in connection with the development hereby permitted.
Reason: Reason: In order to maintain the existing vegetation at the site not required to be removed by the proposals and which makes an important contribution to the character of the area and to accord with Havering Local Plan 2016-2031 Policy 27. |
| 17. | Notwithstanding the indicative details shown on the plans hereby approved, before the first residential occupation of the development, a scheme of hard and soft landscaping shall be submitted to and agreed in writing by the Local Planning Authority and shall include the following:
A soft landscaping scheme shall include
A) Planting Plan
B) Written specifications (including cultivation and other operaitons associated with trees, plants and grass and;
C) Schedules of plants and trees, setting out the species, sizes, numbers/densities and soil depths
The scheme shall also include a programme setting out how the plan will be put into practice includingmeasures for protecting plantsa nd trees both during and after development has finished.
The new planting shall be carried out in accordance with BS 8545 (2014) 'Trees: from nursery to independence in the landscape' in the first planting and/or seeding season following the first occupation of the residential buildings hereby permitted or the substantial completion of the dvelopment, whichever is the sooner and shall comply with the requirements specified in BS 3936 (1992) 'Specification of Nursery Stock Part 1 Trees and Shrubs', and in BS 4428 (1989( 'Recommendations for General Landscape Operations'. None of the new trees plants, or shurbs planted shall be lopped or topped within a period of five years from the completion of the development. Any trees, plants or shrubs which, within a period of five years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season in accordance with the approved scheme. The approved landscaping scheme shall be maintained thereafter.
Reason: In order to achieve a satisfactory arrangeement of landscaping to offset trees to be removed to faciliate the development and new areas of hard-surfacing and to accord with Policy 27 of the Local Plan. |
| 18. | The development shall be carried out in accordance with the submitted flood risk assessment referenced 74295.00.01 R4 (prepared by Geosmart, dated 14/10/2024) and the following mitigation measures it details:
· Finished floor levels shall be set no lower than 27.53m above Ordnance Datum (mAOD).
· An area of 550 m² of land shall be reduced by 120mm to provide 68.75 m³ of volume for volume compensatory storage. The compensatory storage shall be provided in the area shown in green as seen in 'figure 11. Site location and relative elevations' (GeoSmart, 2024) of the submitted FRA.
These mitigation measures shall by fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
Reasons
·To reduce the risk of flooding to the proposed development and future occupants;
·To prevent flooding elsewhere by ensuring that compensatory storage of flood water is provided |
| 19. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 the garage(s)/carport(s) hereby permitted shall be made permanently available for the parking of private motor vehicles and not for any other purpose including living accommodation or any trade or business.
Reason:-
To provide satisfactory off-street parking at the site. |
| 20. | The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). The Mayoral CIL levy rate for Havering is 25/m² and is chargeable for each additional square metre of residential gross internal [floor] (GIA). Based upon the information supplied with the application, £46,250 would be payable due to result in new properties with a combined floor area of 1850m² of GIA, however this may be adjusted subject to indexation.
The proposal is also liable for Havering Council's CIL. Havering's CIL charging rate for residential is £125m² (Zone A for each additional square metre of GIA. Based upon the information supplied with the application, £231,250 would be payable, subject to indexation.
These charges are levied under s.206 of the Planning Act 2008. CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website. You are also advised to visit the planning portal website where you can download the appropriate document templates at
http://www.planningportal.gov.uk/planning/applications/howtoapply/whattosubmit/cil |
| 21. | Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with paragraph 38 of the National Planning Policy Framework, improvements required to make the proposal acceptable were negotiated with the agent in writing. The revisions involved alterations to separation/massing. The amendments were subsequently submitted on 15 April 2024. |