| No. | Condition Text |
|---|
| 1. | This permission shall be for a limited for a fixed period of two years from the date that permission is granted on or before which date the use hereby permitted shall be discontinued and works carried out under this permission shall be removed and the site reinstated to its former condition to the satisfaction of the Local Planning Authority.
Reason:
To enable the Local Planning Authority to retain control. |
| 2. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 3. | No part of the development hereby permitted shall commence until Highways England technical approval has been sought and, if needed, granted for the installation of a 30m tower and other ancillary development for a temporary period of two years.
Reason:-
To ensure that the tower is approved in accordance with Highways England's technical approvals process, if required, and that the tower will not be capable of falling on to Highways England's operational land. This is to ensure that the M25 continues to be an effective part of the system of national through routes for traffic in accordance with section 10 the Highways Act 1980 and to satisfy the reasonable requirements of Road Safety. |
| 4. | If any part of the construction and maintenance of the structure requires access on or through land that forms part of the operational area of the M25 DBFO network access should be co-ordinated through Connect Plus Services who act as maintenance provider on behalf of Highways England for the M25.
Reason:-
To preserve the requirements of the continuous operational and maintenance needs of the M25 motorway. Access arrangements should be co-ordinated through juliet.umeibekwe@connectplusm25.co.uk |
| 5. | Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraphs 186-187 of the National Planning Policy Framework 2012. |