| No. | Condition Text |
|---|
| 1. | No structure within the area marked A2 shall exceed 4 metres in height above ground level |
| 2. | No structure within the area marked B1 shall exceed 4 metres in height above ground level. |
| 3. | No open storage, or the erection of any structures, shall take place on the areas marked C2, G, G1 and G2. |
| 4. | The area marked C2 shall be used only for the parking of vehicles associated with the use of Plot A (including A2) and Plot B (including B1) as scaffolding yards and the dwelling known as Park Farm and for no other purpose. |
| 5. | The areas marked G1 and G2 shall be used for accessing the site and parking of vehicles associated with the lawful use of Plots A and B and the dwelling known as Park Farm and for no other purpose. |
| 6. | The bund along the back edge to areas C1, C2 and C3 and all resulting materials shall be removed within 14 days of the date of failure to meet any one of the requirements set out in i) to iv) below:
i) Within 3 months of the date of this decision a scheme of landscaping for the bund shall have been submitted for the written approval of the local planning authority. The scheme shall include details of re-profiling the bund, soft landscape works (including planting plans, written specifications and schedules of plants noting species, plant sizes and numbers/densities), a timetable for the scheme's implementation and a programme of maintenance for a minimum period of 5 years.
ii) If within 5 months of the date of this decision the local planning authority refuse to approve the scheme or fail to give a decision within the prescribed period, an appeal shall have been made to, and accepted as validly made by, the Secretary of State.
iii) If an appeal is made in pursuance of ii) above, that appeal shall have been finally determined and the submitted scheme shall have been approved by the Secretary of State.
iv) The approved scheme shall have been carried out and completed in accordance with the approved timetable.
Upon implementation of the approved landscaping scheme specified in this condition, that scheme shall thereafter be maintained.
In the event of a legal challenge to this decision, or to a decision made pursuant to the procedure set out in this condition, the operation of the time limits specified in this condition will be suspended until that legal challenge has been finally determined. |
| 7. | The schedule of landscape maintenance, approved in compliance with condition 6 above, shall be carried out in accordance with the approved details. Any trees or plants which within a period of five years from completion of the landscaping scheme die, are removed or become
seriously damaged or diseased shall be replaced in the next planting season with plants of a similar size and species. |
| 8. | 8) The concrete surface to the areas marked G, G1 and G2 and the hard surfacing to area C2 shall be removed within 14 days of the date of failure to meet any one of the requirements set out in i) to iv) below:
i. Within 3 months of the date of this decision a scheme for surface water drainage for areas G, G1 and G2 and area C2 shall have been submitted for the written approval of the local planning authority. The scheme shall include a timetable for its implementation and a programme of maintenance.
ii. If within 5 months of the date of this decision the local planning authority refuse to approve the scheme or fail to give a decision within the prescribed period, an appeal shall have been made to, and accepted as validly made by, the Secretary of State.
iii. If an appeal is made in pursuance of ii) above, that appeal shall have been finally determined and the submitted scheme shall have been approved by the Secretary of State.
iv. The approved scheme shall have been carried out and completed in accordance with the approved timetable.
Upon implementation of the approved surface water scheme specified in this condition, that scheme shall thereafter be maintained.
In the event of a legal challenge to this decision, or to a decision made pursuant to the procedure set out in this condition, the operation of the time limits specified in this condition will be suspended until that legal challenge has been finally determined |