No.Condition Text
1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice). Reason:- For the avoidance of doubt and to ensure that the development is carried out as approved.
3.No further works shall take place in relation to any of the development hereby approved until samples of all materials to be used in the external construction of the building are submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials. Reason:- Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. Submission of samples before works re-commence place will ensure that the appearance of the proposed development will harmonise with the character of the surrounding area.
4.The first floor window inserted on the west side elevation serving the bathroom shall be obscure-glazed, and non-opening unless the parts of the window which can be opened are more than 1.7m above the floor of the room in which the window is installed. Reason:- In the interest of privacy and to protect the amenity of the adjacent neighbours, and in accordance with Policy 7 of the Havering Local Plan (adopted 2021).
5.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, nor any Statutory Instrument which amends, removes or replaces that Order, no window or other opening (other than those shown on the submitted and approved plans) shall be formed in the flank walls of the development hereby permitted without the receipt of a specific planning permission for it from the London Planning Authority. Reason: To protect the amenities of neighbouring occupiers and ensure the development complies with policy 7 of the Havering Local Plan (2021).
6.The roof area of the extension hereby permitted shall not be used as a balcony, roof garden or similar amenity area without the grant of further specific permission from the Local Planning Authority. Reason:- In the interests of the amenity of the occupiers of neighbouring dwelling.
7.The scheme of hard and soft landscaping as shown on the drawing '9615/80 B' submitted as part of the application shall be implemented in accordance with the approved details and retained permanently to the satisfaction of the Local Planning Authority. All planting, seeding or turfing comprised within the scheme shall be carried out in the first planting season following completion of the development and any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority. Reason:- To ensure that the development achieves a satisfactory level of landscape quality.
8.During construction of the development hereby permitted, all trees located within or adjacent to 15 Ernest Road Hornchurch RM11 3JE shall not be lopped or felled without the written consent of the local planning authority. Reason:- In order to maintain the existing vegetation at the site, which makes an important contribution to the character of the area, and to accord with Policy 27 of the Council's Local Plan.
9.During construction of the development hereby permitted, any trees within or near to the site shall be protected in accordance with the requirements of BS 5387 (2012) 'Trees in Relation to Design, Demolition and Construction'. The protection measures shall be implemented prior to any below ground works and shall be retained for the entire period of the duration of any work at the site, in connection with the development hereby permitted. Reason:- In order to maintain the existing vegetation at the site, which makes an important contribution to the character of the area, and to accord with Policy 27 of the Council's Local Plan.
10.All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays. Reason:- To protect residential amenity, in accordance with Policy 7 of the Havering Local Plan (adopted 2021).
11.All residential parking spaces within the development hereby approved shall include provision of infrastructure for electric or Ultra-Low Emission vehicles, of which a minimum of 1 space shall have active charging facilities, with passive provision for all remaining spaces. Such provision is to be made prior to the first occupation of the dwellings hereby permitted. Reason: Provision prior to first occupation of the proposed dwellings hereby permitted will ensure that the development adequately incorporates measures to allow the use of electric vehicles by future occupiers in accordance with Policy T6.1 of the London Plan.
12.Statement Required by Article 35(2) of the Town and Country Planning (Development Management) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraph 38 of the National Planning Policy Framework.
13.The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). The Mayoral CIL levy rate for Havering is £25/m2 and is chargeable for each additional square metre of residential gross internal [floor] (GIA). Based upon the information supplied with the application, £11,400 would be payable due to result in a new residential property with 456m2 of GIA, however this may be adjusted subject to indexation. The proposal is also liable for Havering Council's CIL. Havering's CIL charging rate for residential is £125m2 for each additional square metre of GIA. Based upon the information supplied with the application, £57,000 would be payable, subject to indexation. These charges are levied under s.206 of the Planning Act 2008. CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website.
14.Whilst it would appear from the application that the proposed development is to be entirely within the curtilage of the dwelling, care should be taken upon the commencement and during the course of building operations to ensure that no part of the development, including the foundations and roof overhang, encroaches on, under or over adjoining property. It should be noted that this permission relates solely to works included within the application site.
15.This permission does not convey any consent which may be required under any legislation other than the Town and Country Planning Acts. Any permission required under the Building Regulations or under any other Act, must be obtained from the relevant authority or body e.g. Fire Officer, Health and Safety Executive, Environment Agency (Water interest etc. Neither does this permission negate or override any private covenants which may affect the land.