No.Condition Text
1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice). Reason:- The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
3.Before the development hereby permitted is first commenced, vehicle cleansing facilities to prevent mud being deposited onto the public highway during construction works shall be provided on site in accordance with details to be first submitted to and approved in writing by the Local Planning Authority. The approved facilities shall be retained thereafter and used at relevant entrances to the site throughout the duration of construction works. If mud or other debris originating from the site is deposited in the public highway, all on-site operations shall cease until it has been removed. The submission will provide; a) A plan showing where vehicles will be parked within the site to be inspected for mud and debris and cleaned if required. The plan should show where construction traffic will access and exit the site from the public highway. b) A description of how the parking area will be surfaced, drained and cleaned to prevent mud, debris and muddy water being tracked onto the public highway; c) A description of how vehicles will be checked before leaving the site - this applies to the vehicle wheels, the underside of vehicles, mud flaps and wheel arches. d) A description of how vehicles will be cleaned. e) A description of how dirty/ muddy water be dealt with after being washing off the vehicles. f) A description of any contingency plan to be used in the event of a break-down of the wheel washing arrangements. Reason:- Insufficient information has been supplied with the application in relation to wheel washing facilities. Submission of details prior to commencement will ensure that the facilities provided prevent materials from the site being deposited on the adjoining public highway, in the interests of highway safety and the amenity of the surrounding area. It will also ensure that the development accords with the Development Control Policies Development Plan Document Policies DC32 and DC61.
4.All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays. Reason:- To protect residential amenity, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61.
5.Before the demountable is used as a classroom the Acoustic Fencing specified in the Gramm Barriers document accompanying the application and shown on approved drawing HPS/01A, and the Acoustic Canopy constructed of Makrolon Multi thermal/acoustic polycarbonate sheet shown on approved drawing HPS/01A shall be installed and permanently retained thereafter. Reason:- To protect residential amenity, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61.
6.This permission shall be for a limited period only expiring on 21 July 2021 on or before which date the temporary building(s) carried out under this permission shall be removed and the site reinstated to its former condition to the satisfaction of the Local Planning Authority. Reason:- The temporary nature of the building(s) is such that permanent permission would not be appropriate in the interests of amenity. This permission is therefore granted on a temporary basis to enable the Local Planning Authority to retain control, and that the development accords with the Development Control Policies Development Plan Document Policy DC61.
7.The School Travel Plan required by Condition 14 of Decision Notice P1948.08 shall be updated to reflect the increase in pupil and staff numbers. Reason: In the interests of encouraging safe and sustainable modes of travel and to accord with Policy DC32 of the LDF Development Control Policies Development Plan Document.
8.Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with para 186-187 of the National Planning Policy Framework 2012, improvements required to make the proposal acceptable were negotiated with David Angus via telephone in May 2016. The revisions involved the installation of acoustic fencing along the boundary with the residential properties to the west and the installation of an acoustic canopy. The amendments were subsequently submitted on 4th May 2016.