| No. | Condition Text |
|---|
| 1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
| 2. | No above ground works shall take place in relation to any of the development hereby approved until samples of all materials to be used in the external construction of the building(s) are submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials.
Reason:-
Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. Submission of samples prior to commencement will ensure that the appearance of the proposed development will harmonise with the character of the surrounding area and comply with Policy DC61 of the Development Control Policies Development Plan Document. |
| 3. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
For the avoidance of doubt and to ensure that the development is carried out as approved. |
| 4. | Before the building hereby permitted is first occupied, the area set aside for car parking shall be laid out and surfaced to the satisfaction of the Local Planning Authority as indicated on drawing no. 20018-PL5 Rev C and retained permanently thereafter for the accommodation of vehicles visiting the site and shall not be used for any other purpose. Notwithstanding the details shown on submitted drawings one space to the site frontage designated for the flatted accommodation shall be made available to the proposed commercial use and maintained thereafter permanently for that purpose.
Reason:-
To ensure that car parking accommodation is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety, and that the development accords with the Development Control Policies Development Plan Document Policy DC33. |
| 5. | No building shall be occupied or use commenced until cycle storage is provided in accordance with details previously submitted to and approved in writing by the Local Planning Authority. The cycle storage shall be permanently retained thereafter.
Reason:-
Insufficient information has been supplied with the application to demonstrate what facilities will be available for cycle parking. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use is in the interests of providing a wide range of facilities for non-motor car residents and sustainability. |
| 6. | No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of:
a) parking of vehicles of site personnel and visitors;
b) storage of plant and materials;
c) dust management controls;
d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities;
e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority;
f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities;
g) siting and design of temporary buildings;
h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies;
i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded.
And the development shall be carried out in accordance with the approved scheme and statement.
Reason:-
Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects residential amenity. It will also ensure that the development accords the Development Control Policies Development Plan Document Policy DC61. |
| 7. | The commercial premises hereby approved shall not be used for the purposes hereby permitted other than between the hours of 08:30 and 18:00 Mondays to Saturdays and 10:00 until 16:30 on Sundays, Bank or Public holidays without the prior consent in writing of the Local Planning Authority.
Reason:-
To enable the Local Planning Authority to retain control in the interests of amenity, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 8. | A window display shall be provided at all times in the windows fronting Collier Row Road
Reason:-
In the interests of visual amenity, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 9. | No building shall be occupied or use commenced until refuse and recycling facilities are provided in accordance with details shown on drawing no. 20018-PL15 Rev C. The refuse and recycling facilities shall be permanently retained thereafter.
Reason:-
Insufficient information has been supplied with the application to judge how refuse and recycling will be managed on site. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use will protect the amenity of occupiers of the development and also the locality generally and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 10. | All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays.
Reason:-
To protect residential amenity, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 11. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no window or other opening (other than those shown on the submitted and approved plan,) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority.
Reason:-
In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 12. | All dwellings hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency.
Reason: In order to comply with Policy DC7 of the Local Development Framework. |
| 13. | Before the development hereby permitted commences details of a scheme shall be submitted to and approved in writing by the local planning authority which specifies the provisions to be made for the control of noise emanating the proposed mixed used commercial units upon the residential dwellings. Such scheme as may be approved shall be implemented prior to first occupation and thereafter retained in accordance with such details.
Reason: To prevent noise nuisance to adjoining/adjacent properties. |
| 14. | Before the commercial use commences, that part of the building shall be insulated in accordance with a scheme which shall previously have been approved by the Local Planning Authority in order to secure a reduction in the level of noise emanating from it and it shall be effectively sealed to prevent the passage of odours through the structure of the building to other premises and dwellings.
Reason: To prevent noise and odour nuisance to adjoining properties. |
| 15. | Before any works commence a scheme for any new plant or machinery shall be submitted to the local planning authority to achieve the following standard. Noise levels expressed as the equivalent continuous sound level LAeq (1 hour) when calculated at the boundary with the nearest noise sensitive premises shall not exceed LA90 -10dB and shall be maintained thereafter to the satisfaction of the Local Planning Authority.
Reason: To prevent noise nuisance to adjoining/adjacent properties. |
| 16. | The building(s) shall be so constructed as to provide sound insulation of 43 DnT,w + Ctr dB (minimum values) against airborne noise and 64 L'nT,w dB (maximum values) against impact noise to the satisfaction of the Local Planning Authority.
Reason: To prevent noise nuisance to adjoining properties. |
| 17. | The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a license from the Council. If the developer requires scaffolding, hoarding or mobile cranes to be used on the highway, a license is required and Streetcare should be contacted on 01708434343 to make the necessary arrangements.
Please note that unauthorised works on the highway is an offence. |
| 18. | The proposed development would create a new floor area equivalent to 190 sqm new gross internal floor space. The proposal is therefore liable for Mayoral CIL (MCIL2) and would incur a charge of £4,750 based on the calculation of £25.00 per square metre.
In addition the development would be liable for the Havering Community Infrastructure Levy (HCIL) which was adopted on September 1st 2019. In this location it translates to a charge of £125 per sqm of new floor space. This equates to a charge of £23,750
Each would be subject to indexation. |
| 19. | Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with paragraph 38 of the National Planning Policy Framework, improvements required to make the proposal acceptable were negotiated with the agent in writing. The revisions involved alterationst to the massing and roof design, a reduction in the net increase in dwellings. The amendments were subsequently submitted on 15-06-2021. |