No. | Condition Text |
---|
1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason: To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
2. | Before any development above ground level takes place, samples of all materials to be used in the external construction of the building(s) shall be submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials.
Reason: Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. |
3. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans, particulars and specifications (as set out on page one of this decision notice).
Reason: The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. |
4. | No development above ground level shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of hard and soft landscaping, which shall include indications of all existing trees and shrubs on the site, and details of any to be retained, together with measures for the protection in the course of development. The submitted scheme is expected to make provision for planting to the front and side boundaries of the site of a height and type that will provide a sufficient privacy screen to the garden areas of the ground floor units within the development. All planting, seeding or turfing comprised within the scheme shall be carried out in the first planting season following completion of the development and any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority.
Reason: Insufficient information has been supplied with the application to judge the appropriateness of the hard and soft landscaping proposed and in order that the development complies with Havering Local Plan 2016-2031 Policies 7, 27 and 26. |
5. | No development above ground level shall take place until details of all proposed walls, fences and boundary treatment are submitted to, and approved in writing by, the Local Planning Authority. The boundary development shall then be carried out in accordance with the approved details and retained permanently thereafter to the satisfaction of the Local Planning Authority.
Reason: Insufficient information has been supplied with the application to judge the appropriateness of any boundary treatment and in order that the development complies with Havering Local Plan 2016-2031 Policies 7, 27 and 26. |
6. | Prior to the first occupation of the development hereby permitted cycle storage shall be provided in accordance with details previously submitted to and approved in writing by the Local Planning Authority. The cycle storage shall be permanently retained thereafter.
Reason: Insufficient information has been supplied with the application to demonstrate what facilities will be available for cycle parking and in order that the development complies with objectives of the Havering Local Plan 2016-2031. |
7. | Prior to the first occupation of the development hereby permitted, refuse and recycling facilities shall be provided in accordance with details which shall previously have been submitted to and approved in writing by the Local Planning Authority. The refuse and recycling facilities shall be permanently retained thereafter.
Reason: Insufficient information has been supplied with the application to judge how refuse and recycling will be managed on site. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use will protect the amenity of occupiers of the development and also the locality generally and ensure that the development complies with the objectives of the Havering Local Plan 2016-2031. |
8. | No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of:
a) parking of vehicles of site personnel and visitors;
b) storage of plant and materials;
c) dust management controls;
d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities;
e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority;
f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities;
g) siting and design of temporary buildings;
h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies;
i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded.
And the development shall be carried out in accordance with the approved scheme and statement.
Reason: Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects residential amenity. |
9. | No construction works or deliveries into the site shall take place other than between the hours of 08:00 to 18:00 on Monday to Friday and 08:00 to 13:00 hours on Saturdays unless agreed in writing with the Local Planning Authority. No construction works or deliveries shall take place on Sundays, Bank or Public Holidays unless otherwise agreed in writing by the local planning authority.
Reason: To minimise the impact of the development on the surrounding area in the interests of amenity and in order that the development complies with Havering Local Plan 2016-2031 Policies 7, 27 and 26. |
10. | Before the building(s) hereby permitted is first occupied, provision shall be made within the site for twelve car parking spaces and thereafter this provision shall be made permanently available for use, unless otherwise agreed in writing by the Local Planning Authority. Each of the units within the development shall be provided with their own dedicated parking space.
Reason:-
To ensure that car parking accommodation is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety and in order that the development comply with Havering Local Plan Policies 23 and 24. |
11. | No works shall take place in relation to any of the development hereby approved (except works required to secure compliance with this condition) until the following Contaminated Land reports (as applicable) are submitted to and approved in writing by the Local Planning Authority:
a) A Phase I (Desktop Study) Report documenting the history of this site, its surrounding area and the likelihood of contaminant/s, their type and extent incorporating a Site Conceptual Model.
b) A Phase II (Site Investigation) Report if the Phase I Report confirms the possibility of a significant risk to any sensitive receptors. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the site ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors.
c) A Phase III (Remediation Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation. A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to all receptors must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and procedure for dealing with previously unidentified any contamination. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
d) Following completion of measures identified in the approved remediation scheme mentioned in 1(c) above, a "Verification Report" that demonstrates the effectiveness of the remediation carried out, any requirement for longer-term monitoring of contaminant linkages, maintenance and arrangements for contingency action, must be produced, and is subject to the approval in writing of the Local Planning Authority.
Reason:- To protect those engaged in construction and occupation of the development from potential contamination |
12. | (a) If, during development, contamination not previously identified is found to be present at
the site then no further development (unless otherwise agreed in writing with the local
planning authority) shall be carried out until a remediation strategy detailing how this
unsuspected contamination shall be dealt with has been submitted to and approved in
writing by the local planning authority. The remediation strategy shall be implemented as
approved.
b) Following completion of the remediation works as mentioned in (a) above, a
'Verification Report' must be submitted demonstrating that the works have been carried
out satisfactorily and remediation targets have been achieved.
Reason: To ensure that any previously unidentified contamination found at the site is
investigated and satisfactorily addressed in order to protect those engaged in construction
and occupation of the development from potential contamination |
13. | The dwellings hereby approved shall be constructed to comply with Part M4(2) of the Building Regulations - Accessible and Adaptable Dwellings.
Reason: In the interests of accessibility and in order that the development complies with the objetives of the Havering Local Plan 2016-2031 and London Plan. |
14. | All dwellings hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency.
Reason: In the interests of sustainability and in order that the development complies with the objectives of the Havering Local Plan 2016-2031 |
15. | No site clearance, preparatory work or development shall take place until a scheme for the protection of the retained trees (the tree protection plan) and the appropriate working methods (the arboricultural method statement) in accordance with paragraphs 5.5 and 6.1 of British Standard BS 5837: Trees in relation to design, demolition and construction - Recommendations (or in an equivalent British Standard if replaced) shall have been submitted to and approved in writing by the local planning authority. The scheme for the protection of the retained trees shall be
carried out as approved.
[In this condition "retained tree" means an existing tree which is to be
retained in accordance with the approved plans and particulars.]
Reason:- In the interests of local character and good design and in order that the development complies with Havering Local Plan 2016-2031 Policies 7 and 26. |
16. | No development shall take place until the following information has been submitted to and approved in writing by the local planning authority:
i) a full site survey showing: the datum used to calibrate the site
levels; levels along all site boundaries; levels across the site at
regular intervals and floor levels of adjoining buildings;
ii) full details of the proposed finished floor levels of all buildings and
hard landscaped surfaces.
The development shall be carried out in accordance with the approved
details.
Reason: In the interests of local character and good design and in order that the development complies with Havering Local Plan 2016-2031 Policies 7, 27 and 26. |
17. | No works of construction in relation to the erection of the new dwelling houses hereby permitted shall take place until all of the existing buildings have been demolished.
Reason: In the interests of amenity and good design and in order that the development complies with Havering Local Plan 2016-2031 Policies 7, 27 and 26. |
18. | Prior to the first occupation of any dwelling, external lighting shall be installed in accordance with a scheme of lighting that has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the extent of illumination together with precise details of the height, location and design of the lights.
Reason: In the interests of amenity and in order that the development complies with Havering Local Plan 2016-2031 Policies 7, 27 and 26. |
19. | No works shall take place in relation to any of the development hereby approved until details of surface water drainage works are submitted to and approved in writing by the Local Planning Authority. Surface water drainage shall be provided in accordance with the approved details.
Reason:-
Surface water drainage works are required on site to prevent the risk of flooding. |
20. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 in accordance with the Order, no extension or enlargement (excluding additions to roofs) shall be made to the dwellinghouses hereby permitted, nor the construction of an outbuilding within the curtilage of the site without the express permission in writing of the Local Planning Authority.
Reason:-
In the interests of amenity and to enable the Local Planning Authority to retain control over future development. |
21. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended), no window or other opening (other than those shown on the submitted and approved plans) shall be formed in the flank wall(s) of the buildings hereby permitted, unless specific permission under the provisions of the Town
and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority.
Reason:- In the interests of neighbouring amenity and in order that the development complies with Havering Local Plan 2016-2031 Policies 7, 27 and 26. |
22. | The construction site, boundary fencing and external lighting shall be maintained and managed in accordance with the recommendations contained within paragraph 5.2 of report "Protected Species Survey of Pinewood Poultry Farm, Havering-atte-Bower by John Dobson B.Sc, Essex Mammal Surveys, December 2016" hereby approved by this permission, from the commencement of development through to its completion.
Reason:- In order to comply with the objectives of Havering Local Plan 2016-2031 Policy 30. |
23. | Statement Required by Article 35(2) of the Town and Country Planning (Development Management) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraph 38 of the National Planning Policy Framework 2018. |
24. | Planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted considered and agreed. If new or amended access as required (whether temporary or permanent) there may be a requirement for the diversion or protection of third party utility plant and it is recommended that early involvement with the relevant statutory undertaker takes place. The applicant must contact Engineering Services on 01708 433751 to discuss the scheme and commence the relevant highway approvals process. please note that unauthorised work on the highway is an offence. |
25. | The developer (including their representatives and contractors) is advised that planning consent does not discharge the requirements of the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed for any highway works (including temporary works of any nature) required during the construction of the development.
Please note that unauthorised works on the highway is an offence. |
26. | The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a license from the Council. If the developer requires scaffolding, hoarding or mobile cranes to be used on the highway, a license is required and Streetcare should be contacted on 01708434343 to make the necessary arrangements.
Please note that unauthorised works on the highway is an offence. |
27. | Before occupation of the residential/ commercial unit(s) hereby approved, it is a requirement to have the property/properties officially Street Named and Numbered by our Street Naming and Numbering Team. Official Street Naming and Numbering will ensure that that Council has record of the property/properties so that future occupants can access our services. Registration will also ensure that emergency services, Land Registry and the Royal Mail have accurate address details. Proof of having officially gone through the Street Naming and Numbering process may also be required for the connection of utilities. For further details on how to apply for registration see:
https://www.havering.gov.uk/Pages/Services/Street-names-and-numbering.aspx |