No. | Condition Text |
---|
1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
2. | Before the building(s) hereby permitted is first occupied, the area set aside for car parking shall be laid out and surfaced to the satisfaction of the Local Planning Authority and retained permanently thereafter for the accommodation of vehicles visiting the site and shall not be used for any other purpose.
Reason:-
To ensure that car parking accommodation is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety, and that the development accords with the Development Control Policies Development Plan Document Policy DC33. |
3. | Before any of the development hereby permitted is commenced, samples of all materials to be used in the external construction of the building(s) shall be submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials.
Reason:-
To ensure that the appearance of the proposed development will harmonise with the character of the surrounding area, and that the Development Control Policies Development Plan Document Policy DC61. |
4. | Prior to the commencement of the development, all details of boundary screening and screen walling shall be submitted to and agreed in writing by the Local Planning Authority and shall be permanently retained and maintained thereafter to the satisfaction of the Local Planning Authority.
Reason: To protect the visual amenities of the development and to prevent undue overlooking of adjoining properties. |
5. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans, particulars and specifications.
Reason:-
The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
6. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995, no window or other opening (other than those shown on the submitted plan,) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority.
Reason:-
In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
7. | Before the buildings hereby permitted is first occupied, the access road to the site shall be surfaced to the satisfaction of the Local Planning Authority and retained permanently thereafter for the use of vehicles visiting the site.
Reason: To ensure that access to the site is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety. |
8. | Before any of the development hereby permitted is commenced, surfacing materials for the access road and vehicle turning area shall be submitted to and approved in writing by the Local Planning Authority and thereafter the access road and vehicle turning area shall be constructed with the approved materials. Once constructed, the access road and vehicle turning area shall be kept permanently free of any obstruction (with the exception of the car parking spaces shown on the plans) to prevent their use for anything but turning and access.
Reason: To ensure that the appearance of the proposed development will harmonise with the character of the surrounding area and in the interests of highway safety. |
9. | Prior to the commencement of any works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority:
a) A Phase II (Site Investigation) Report if the Phase I Report confirms the possibility of a significant risk to any sensitive receptors. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the site ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors.
b) A Phase III (Risk Management Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation. The report will comprise two parts:
Part A - Remediation Statement which will be fully implemented before it is first occupied. Any variation to the scheme shall be agreed in writing to the Local Planning Authority in advance of works being undertaken. The Remediation Scheme is to include consideration and proposals to deal with situations where, during works on site, contamination is encountered which has not previously been identified. Any further contamination shall be fully assessed and an appropriate remediation scheme submitted to the Local Planning Authority for written approval.
Part B - Following completion of the remediation works a 'Validation Report' must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved.
c) If during development works any contamination should be encountered which was not previously identified and is derived from a different source and/or of a different type to those included in the contamination proposals, then revised contamination proposals shall be submitted to the LPA; and
d) If during development work, site contaminants are found in areas previously expected to be clean, then their remediation shall be carried out in line with the agreed contamination proposals.
For further guidance see the leaflet titled, 'Land Contamination and the Planning Process'.
Reason: To protect these engaged in construction and occupation of the development from potential contamination. |
10. | Prior to the commencement of the development, details of the proposed works affecting the public highway shall be submitted to and approved in writing by the Local Planning Authority and all necessary legal agreements secured. The works shall be carried out in full and in strict accordance with the approved details prior to the first occupation of the development and thereafter permanently retained.
Reason: In the interest of ensuring good design and ensuring public and highway safety and to comply with policies of the LDF Core Strategy and Development Control Policies Development Plan Documents, namely Policies CP10, CP17 and DC61. |
11. | No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of hard and soft landscaping, which shall include indications of all existing trees and shrubs on the site, and details of any to be retained, together with measures for the protection in the course of development. All planting, seeding or turfing comprised within the scheme shall be carried out in the first planting season following completion of the development and any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority.
Reason:-
In accordance with Section 197 of the Town and Country Planning Act 1990 and to enhance the visual amenities of the development, and that the development accords with the Development Control Policies Development Plan Document Policy DC61 |
12. | No construction works or deliveries into the site shall take place other than between the hours of 08.00 to 18.00 on Monday to Friday and 08.00 to 13.00 hours on Saturdays unless agreed in writing with the Local Planning Authority. No construction works or deliveries shall take place on Sundays, Bank or Public Holidays unless otherwise agreed in writing by the Local Planning Authority.
Reason:-
To protect residential amenity, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
13. | Before the development hereby permitted commences, details of the proposed refuse storage and recycling facilities to be provided at the site, together with arrangements for refuse disposal and collection shall be submitted to and approved in writing by the Local Planning Authority. The facilities as approved shall then be provided at the site prior to the first occupation of the development and retained at the site thereafter in accordance with the approved drawings at all times.
Reason: In order to ensure that any such facilities are provided and that they respect the visual amenity of the locality, and the amenity of surrounding residents. |
14. | Prior to completion of the works hereby permitted, secure cycle parking facilities should be provided for a minimum of one bicycle per dwelling of a type and in a location previously submitted to and agreed in writing by the Local Planning Authority shall be provided and permanently retained thereafter.
Reason:-
In the interests of providing a wide range of facilities for non-motor car residents, in the interests of sustainability. |
15. | Prior to the commencement of the development hereby permitted, a full and detailed application for the Secured by Design scheme shall be submitted to the Local Planning Authority, setting out how the principles and practices of the aforementioned scheme are to be incorporated. Once approved in writing by the Local Planning Authority, in consultation with the Havering Crime Prevention Design Advisor, the development shall be carried out in accordance with the agreed details.
Reason: In the interest of residential amenity and creating safer, sustainable communities, reflecting guidance set out in Policy CP17 and DC63 of the Core Strategy and Development Control Policies Development Plan Document and Policy 4B.6 of the London Plan. |
16. | The width of the access road at the entrance of the proposed development shall not be less than 3.7 metres to adhere to the Highways Authority specifications.
Reason: In the interests of highway safety. |
17. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 Article 3, Schedule 2, Part 1, Class E, no outbuildings or other means of enclosures shall be erected within the rear garden areas of the dwellings unless permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority.
Reason:-
In the interests of amenity and to enable the Local Planning Authority to retain control over future development, and in order that the development accords with the LDF Development Control Policies Development Plan Document Policy DC61. |
18. | No development shall take place until a scheme for external lighting has been submitted to and approved in writing by the Local Planning Authority. The scheme of lighting shall include the low level lighting of the access road. The approved details shall be implemented in full prior commencement of the hereby approved development and permanently maintained in accordance with the approved details.
Reason:-
In the interests of security and residential amenity and in order that the development accords with the LDF Development Control Policies Development Plan Document Policies DC61 and DC63. |
19. | INFORMATIVES:
1. Reason for approval:
The proposed development is considered to be in accordance with the aims, objectives and provisions of Policies LDF: DC2, DC3, DC33 and DC61 and the Supplementary Design Guidance for Residential Amenity Space of the LDF Development Control Policies Development Plan Document.
2. The applicant is advised that this planning permission does not constitute Highways approval, which will need to be sought separately prior to the commencement of the development. Any proposals which involve building over the public highway as managed by the London Borough of Havering, will require a licence and the applicant must contact Traffic & Engineering, Technical Services on 01708 432501 to commence the Submission/ Licence Approval process.
3. In aiming to satisfy condition 15, the applicant should seek the advice of the Police Crime Prevention Design Advisor. He can be contacted through the London Borough of Havering Development and Building Control Service or Romford Police Station, 19 Main Road, Romford, Essex, RM1 3BJ.
Note: Following a change in government legislation a fee is now required when submitting details pursuant to the discharge of conditions, in order to comply with the Town and Country Planning (Fees for Applications and Deemed Applications) (Amendment) (England) Regulations, which came into force from 06.04.2008. A fee of £85 per request is needed. |