No.Condition Text
1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice). Reason:- For the avoidance of doubt and to ensure that the development is carried out as approved.
3.The proposed development hereby approved shall be constructed in accordance with the materials detailed under page 8 of the Planning Statement (Ref. NAPC/JD/0948/JM) unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure that the appearance of the proposed development will harmonise with the character of the surrounding area.
4.The outbuilding annex hereby permitted shall be used only for living accommodation as an integral part of the existing dwelling known as 35 Stewart Avenue, Upminster, RM14 2AE and shall not be used as a separate unit of residential accommodation at any time. Reason:- The site is within an area where the Local Planning Authority consider that the sub-division of existing properties should not be permitted in the interests of amenity.
5.The proposed bathroom window on the east side elevation shall be permanently glazed with obscure glass not less than level 3 on the standard scale of obscurity and shall thereafter be maintained. Reason:- In the interests of privacy, and in accordance with policy 7 of the Havering Local Plan (2016-2031).
6.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no window or other opening (other than those shown on the submitted and approved plan,) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority. Reason:- In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future.
7.The roof area of the outbuilding hereby permitted shall not be used as a balcony, roof garden or similar amenity area without the grant of further specific permission from the Local Planning Authority. Reason:- In the interests of the amenity of the occupiers of neighbouring dwelling.
8.Any boilers installed in the dwelling(s) hereby approved shall be Ultra-Low NOx boilers with maximum NOx Emissions less than 40 mg/kWh. Where any installations do not meet this emissions standard it should not be operated without the fitting of suitable NOx abatement equipment or technology as determined by a specialist to ensure comparable emissions. The installation of the boilers shall be carried out in strict accordance with these details and shall thereafter be permanently retained. Reason:- To minimise the impact of building emissions on local air quality.
9.Statement Required by Article 35(2) of the Town and Country Planning (Development Management) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraph 38 of the National Planning Policy Framework.
10.Whilst it would appear from the application that the proposed development is to be entirely within the curtilage of the dwelling, care should be taken upon the commencement and during the course of building operations to ensure that no part of the development, including the foundations and roof overhang, encroaches on, under or over adjoining property. It should be noted that this permission relates solely to works included within the application site.
11.The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). The Mayoral CIL levy rate for Havering is £25/m and is chargeable for each additional square metre of residential gross internal area (GIA). Based upon the information supplied with the application, £1,350 would be payable due to result in additional residential area of 54sqm, however this may be adjusted subject to indexation. CIL is payable within 60 days of commencement of development. These charges are levied under s.206 of the Planning Act 2008. CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website. You are also advised to visit the planning portal website where you can download the appropriate document templates at http://www.planningportal.gov.uk/planning/applications/howtoapply/whattosubmit/cil