| No. | Condition Text |
|---|
| 1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
| 2. | No works shall take place in relation to any of the development hereby approved until samples of all materials to be used in the external construction of the building(s) are submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials.
Reason:-
Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. Submission of samples prior to commencement will ensure that the appearance of the proposed development will harmonise with the character of the surrounding area and comply with Policy DC61 of the Development Control Policies Development Plan Document. |
| 3. | No works shall take place in relation to any of the development hereby approved until there has been submitted to and approved by the Local Planning Authority a scheme of hard and soft landscaping, which shall include indications of all existing trees and shrubs on the site, and details of any to be retained, together with measures for the protection in the course of development. All planting, seeding or turfing comprised within the scheme shall be carried out in the first planting season following completion of the development and any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority.
Reason:-
Insufficient information has been supplied with the application to judge the appropriateness of the hard and soft landscaping proposed. Submission of a scheme prior to commencement will ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. It will also ensure accordance with Section 197 of the Town and Country Planning Act 1990. |
| 4. | Prior to the commencement of the development hereby approved, details of all proposed walls, fences and boundary treatment shall be submitted to, and approved in writing by, the Local Planning Authority. The boundary development shall then be carried out in accordance with the approved details and retained permanently thereafter to the satisfaction of the Local Planning Authority.
Reason:
Insufficient information has been supplied with the application to judge the appropriateness of any boundary treatment. Submission of this detail prior to commencement will protect the visual amenities of the development, prevent undue overlooking of adjoining property and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 5. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 6. | No building shall be occupied or use commenced until refuse and recycling facilities are provided in accordance with details which shall previously have been submitted to and approved in writing by the Local Planning Authority. The refuse and recycling facilities shall be permanently retained thereafter.
Reason:-
Insufficient information has been supplied with the application to judge how refuse and recycling will be managed on site. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use will protect the amenity of occupiers of the development and also the locality generally and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 7. | No building shall be occupied or use commenced until cycle storage is provided in accordance with details previously submitted to and approved in writing by the Local Planning Authority. The cycle storage shall be permanently retained thereafter.
Reason:-
Insufficient information has been supplied with the application to demonstrate what facilities will be available for cycle parking. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use is in the interests of providing a wide range of facilities for non-motor car residents and sustainability. |
| 8. | No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of:
a) parking of vehicles of site personnel and visitors;
b) storage of plant and materials;
c) dust management controls;
d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities;
e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority;
f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities;
g) siting and design of temporary buildings;
h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies;
i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded.
And the development shall be carried out in accordance with the approved scheme and statement.
Reason:-
Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects residential amenity. It will also ensure that the development accords the Development Control Policies Development Plan Document Policy DC61. |
| 9. | Prior to the commencement of any development an assessment shall be undertaken of the impact of road noise emanating from London Road upon the development in accordance with the methodology contained in the Department of Transport/Welsh office memorandum, "Calculation of Road Traffic Noise", 1988. Reference should be made to the good standard to be found in the World Health Organisation Document number 12 relating to community noise and BS8233:1999. Following this, a scheme detailing measures, which are to protect occupants from road traffic noise shall be submitted, to and approved in writing by the Local Planning Authority and shall be implemented prior to occupation.
Reason:-
Insufficient information has been supplied with the application to judge the impact of road noise upon the proposed development. Submission of an assessment prior to commencement will protect future residents against the impact of road noise in accordance with Development Control Policies Development Plan Document Policy DC61 |
| 10. | Prior to the commencement of any works pursuant to this permission, the developer shall submit for the written approval of the Local Planning Authority;
a) A full air quality assessment for the proposed development to assess the existing air quality in the study area (existing baseline)
b) The air quality assessment shall include a prediction of future air quality without the development in base (future baseline)
c) The air quality assessment shall predict air quality with the development in place (with development)
d) The air quality assessment should also consider the following information;
· A description containing information relevant to the air quality assessment
· The policy context for the assessment- national, regional and local policies should be taken into account.
· Description of the relevant air quality standards and objectives.
· The basis for determining the significance of impacts.
· Details of assessment methods.
· Model verification.
· Identification of sensitive locations.
· Description of baseline conditions.
· Assessment of impacts.
· Description of the construction and demolition phase, impacts/ mitigation.
· Mitigation measures.
· Assessment of energy centres, stack heights and emissions.
· Summary of the assessment of results.
For further guidance see: 'EPUK Guidance Development Control: Planning for Air Quality (2015 update), EPUK Biomass and Air Quality Guidance for Local Authorities.
Reason: -
Insufficient information has been supplied with the application to judge the potential effects of poor air quality upon those engaged in construction and those occupying the development. Submission of an assessment prior to commencement will protect those parties in accordance with Development Control Policy DC52 |
| 11. | Prior to the commencement of any works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority;
a) A Phase I (Desktop Study) Report documenting the history of the site, its surrounding area and the likelihood of contaminant/s, their type and extent incorporating a Site Conceptual Model.
b) A Phase II (Site Investigation) Report if the Phase I Report confirms the possibility of a significant risk to any sensitive receptors. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the sites ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors.
c) A Phase III (Remediation Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation. A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to all receptors must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and procedure for dealing with previously unidentified any contamination. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
d) Following completion of measures identified in the approved remediation scheme mentioned in 1(c) above, a "Verification Report" that demonstrates the effectiveness of the remediation carried out, any requirement for longer-term monitoring of contaminant linkages, maintenance and arrangements for contingency action, must be produced, and is subject to the approval in writing of the Local Planning Authority.
Reason:-
Insufficient information has been supplied with the application to judge the risk arising from contamination. Submission of an assessment prior to commencement will ensure the safety of the occupants of the development hereby permitted and the public generally. It will also ensure that the development accords with Development Control Policies Development Plan Document Policies DC54 and DC61. |
| 12. | a) If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until a remediation strategy detailing how this unsuspected contamination shall be dealt with has been submitted to and approved in writing by the local planning authority. The remediation strategy shall be implemented as approved.
b) Following completion of the remediation works as mentioned in (a) above, a 'Verification Report' must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved.
Reason:-
To ensure that any previously unidentified contamination found at the site is investigated and satisfactorily addressed in order to protect those engaged in construction and occupation of the development from potential contamination. |
| 13. | The dwellings hereby approved shall be constructed to comply with Part M4(2) of the Building Regulations - Accessible and Adaptable Dwellings.
Reason:-
In order to comply with Policy DC7 of the Local Development Framework and Policy 3.8 of the London Plan. |
| 14. | All dwellings hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency.
Reason:-
In order to comply with Policy 5.15 of the London Plan. |
| 15. | The building(s) shall be so constructed as to provide sound insulation of 45 DnT,w + Ctr dB (minimum value) against airborne noise to the satisfaction of the Local Planning Authority.
Reason:-
To prevent noise nuisance to adjoining properties. |
| 16. | Prior to the first occupation of the development hereby approved, parking provision within the site shall be allocated to residents of the development in accordance with details which shall have been previously submitted to and approved in writing by the Local Planning Authority detailing how the car parking spaces for the site shall be apportioned and permanently retained for use by occupants of the residential conversion. The parking provision shall be retained permanently thereafter for use by residents of the development only in accordance with the approved details.
Reason:-
To ensure that the car parking is retained for the purposes intended, in the interests of amenity. |
| 17. | Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with para 186-187 of the National Planning Policy Framework 2012, improvements required to make the proposal acceptable were negotiated with the agent by email/telephone. The revisions involved the omission of the first floor accommodation/fenestration changes. The amendments were subsequently submitted on 21-07-2017 |
| 18. | The planning obligations recommended in this report have been subject to the statutory tests set out in Regulation 122 of the Community Infrastructure Levy Regulations 2010 and the obligations are considered to have satisfied the following criteria:-
(a) Necessary to make the development acceptable in planning terms;
(b) Directly related to the development; and
(c) Fairly and reasonably related in scale and kind to the development. |
| 19. | The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). Based upon the information supplied with the application, the CIL payable would be £8340 (subject to indexation). CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website. |
| 20. | Before occupation of the residential/ commercial unit(s) hereby approved, it is a requirement to have the property/properties officially Street Named and Numbered by our Street Naming and Numbering Team. Official Street Naming and Numbering will ensure that that Council has record of the property/properties so that future occupants can access our services. Registration will also ensure that emergency services, Land Registry and the Royal Mail have accurate address details. Proof of having officially gone through the Street Naming and Numbering process may also be required for the connection of utilities. For further details on how to apply for registration see:
https://www.havering.gov.uk/Pages/Services/Street-names-and-numbering.aspx |
| 21. | The applicant shall be aware of the following:
· AQ modelling must be based transport related inputs which have been approved by LB Havering's Transport Assessment team.
· It is essential that junctions and heavily congested roads are modelled accurately and this is reflected in the choice of relevant node spacing and vehicle speed inputs.
· Where under predictions occur nodes must be scrutinised and where necessary vehicle speeds adjusted to reflect queuing.
· It is the responsibility of the applicant to ensure that their appointed consultants' modelling verification is robust and adjustment factors clearly explained and justified, calculations and graphs must be provided at validation.
· Margin of error must not exceed 4 (refer to LAQM guidance as best practice).
· A cumulative assessment of major committed developments in the area must be incorporated into the modelling.
· Contrary to the values given in the EPUK guidance a magnitude of change greater than 0.5 µg/m3 is considered significant in areas where present concentrations are breeching limit values and shall be assessed as such. Such changes do not contribute towards EU limit values (NPPF paragraph 124).
· Any other scenarios should be considered which are relevant to this site |