No.Condition Text
1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice). Reason:- The local planning authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted.
3.No materials shall be stockpiled or stored at a height greater than 4 metres when measured from adjacent ground level. Reason:- In the interest of visual amenity.
4.Prior to the hereby permitted development commences, details shall be submitted to and agreed in writing by the Local Planning Authority setting out suitable gas protection measures to be employed on the site. This could include, but not necessarily limited to, the installation of a suitable gas resistant membrane, in compliance with BS 8485:2015+A1:2019, alternative gas protection measures, or suitable monitoring agreed in writing with the local planning authority, to demonstrate that the risk from landfill gas is adequately controlled. Any gas protection measures shall be carried out in strict accordance with the agreed details. Upon completion of installation of any gas protection measures, a 'Verification Report' must be submitted demonstrating that the works have been carried out. Reason: Insufficient information has been supplied with the application to judge the risk arising from landfill gases (methane, VOCs and carbon dioxide). Submission of an assessment prior to commencement will protect people on or close to the site from the risks associated with migrating landfill gas, and will ensure that the development accords with the Havering Local Plan.
5.1) Prior to the commencement of any works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority; a) A Phase I (Desktop Study) Report documenting the history of the site, its surrounding area and the likelihood of contaminant/s, their type and extent incorporating a Site Conceptual Model. b) A Phase II (Site Investigation) Report if the Phase I Report confirms the possibility of a significant risk to any sensitive receptors. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the sites ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors. c) A Phase III (Remediation Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation. A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to all receptors must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and procedure for dealing with previously unidentified any contamination. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. d) Following completion of measures identified in the approved remediation scheme mentioned in 1(c) above, a "Verification Report" that demonstrates the effectiveness of the remediation carried out, any requirement for longer-term monitoring of contaminant linkages, maintenance and arrangements for contingency action, must be produced, and is subject to the approval in writing of the Local Planning Authority. Reason: To protect those engaged in construction and occupation of the development from potential contamination
6.a) If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until a remediation strategy detailing how this unsuspected contamination shall be dealt with has been submitted to and approved in writing by the local planning authority. The remediation strategy shall be implemented as approved. b) Following completion of the remediation works as mentioned in (a) above, a 'Verification Report' must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved. Reason: To ensure that any previously unidentified contamination found at the site is investigated and satisfactorily addressed in order to protect those engaged in construction and occupation of the development from potential contamination
7.No beneficial occupation of the development hereby permitted shall take place until cycle parking provision hereby approved is provided and the cycle storage shall thereafter be retained and maintained for the duration of the development hereby permitted. Reason:- In the interest of sustainable mode of transport.
8.No beneficial occupation of the development hereby permitted shall take place until a Delivery and Servicing Plan detailing the proposed hours of deliveries to the site, together with the suggested routeing of vehicles and procedures to ensure vehicles accessing the site are registered with a best practice scheme such as the Freight Operator Recognition Scheme has been submitted to and approved in writing by the local planning authority. The plan shall furthermore identify the arrangements for: a) monitoring of the approved arrangements; b) ensuring that all drivers of vehicles under the control of the applicant are made aware of the approved arrangements, and; c) the disciplinary steps that will be exercised in the event of default. The approved plan shall be implemented for the duration of the development hereby permitted. Reason:- In the interest of highways safety.
9.The landscaping scheme hereby approved shall be implemented within the following planting season following completion of the development and shall be maintained as such thereafter. And any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority. Reason:- To ensure that the development achieves a satisfactory level of landscape quality.
10.Before the development hereby permitted is first commenced, vehicle cleansing facilities to prevent mud being deposited onto the public highway during and post construction works shall be provided on site in accordance with details to be first submitted to and approved in writing by the Local Planning Authority. The approved facilities shall be retained thereafter and used at relevant entrances to the site throughout the duration and post construction works. If mud or other debris originating from the site is deposited in the public highway, all on-site operations shall cease until it has been removed. The submission will provide; a) A plan showing where vehicles will be parked within the site to be inspected for mud and debris and cleaned if required. The plan should show where construction traffic will access and exit the site from the public highway. b) A description of how the parking area will be surfaced, drained and cleaned to prevent mud, debris and muddy water being tracked onto the public highway; c) A description of how vehicles will be checked before leaving the site - this applies to the vehicle wheels, the underside of vehicles, mud flaps and wheel arches. d) A description of how vehicles will be cleaned. e) A description of how dirty/ muddy water be dealt with after being washing off the vehicles. f) A description of any contingency plan to be used in the event of a break-down of the wheel washing arrangements. Reason:- Insufficient information has been supplied with the application in relation to wheel washing facilities. Submission of details prior to commencement will ensure that the facilities provided prevent materials from the site being deposited on the adjoining public highway, in the interests of highway safety and the amenity of the surrounding area.
11.1) Prior to the commencement of the development hereby approved, an Air Quality Neutral Assessment shall be submitted to and agreed by the Local Planning Authority. The assessment shall detail; · Calculations of the predicted building emissions and comparison against the Building Emission Benchmarks; · Calculations of the predicted transport emissions and comparison against the Transport Emission Benchmarks; · Mitigation (if required) or contribution to off-setting the development's emissions, taking into account the most up to date Defra's damage costs and relevant guidance on offsetting payments. 2) The use hereby permitted shall not commence until all measures identified in the Air Quality Neutral Assessment have been shown to be implemented to the satisfaction of the Local Planning Authority in writing. Reason: To ensure that the development will not lead to further deterioration of existing poor air quality within the designated Air Quality Management Area and to comply with Policy SI 1 of the London Plan and relevant guidance, as subsequently amended
12.Prior to the occupation of the development hereby permitted, a Travel Plan which reflects the coming and going of the employees shall be submitted to and approved in writing by the Local Planning Authority. The Travel Plan shall include measures to reduce vehicular trips and proposals for monitoring and reporting progress to the Local Planning Authority and include a timetable for its implementation and review. The approved Travel Plan shall remain in force permanently and implemented in accordance with the agreed details. Reason: To improve the sustainable mode of transport.
13.Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with paragraph 38 of the National Planning Policy Framework, improvements required to make the proposal acceptable were negotiated with the applicant's agent. The revision included the improvement to landscaping to protect views from public vantage points.
14.For any development where a flood risk is identified, the Council as the Lead Local Flood Authority want to see developers consider and implement flood resilience/resistance measures into the buildings themselves. This is not to stop development but to ensure the protection for future residents is maintained and enhanced. The following measures are strongly recommended, although this list is not exhaustive:- - Raising the level of the building by at least 300mm above local levels; - Waterproof membrane in the ground floor; - Waterproof plaster and waterproofing to ground floor; - Electrics from the upstairs down and sockets high up off the ground floor; - Non return valves on the sewerage pipes; - Emergency escape plan for each individual property; - Air brick covers; and - Movable flood barriers for entrances
15.Please note there are HV underground cables on the site running within close proximity to the proposed development. Prior to commencement of work accurate records should be obtained from our Plan Provision Department at UK Power Networks, Fore Hamlet, Ipswich, IP3 8AA. All works should be undertaken with due regard to Health & Safety Guidance notes HS(G)47 (Avoiding Danger from Underground services). This document is available from local HSE office. Should any diversion works be necessary as a result of the development then enquiries should be made to our Customer Connections department. The address is UK Power Networks, Metropolitan house, Darkes Lane, Potters Bar, Herts, EN6 1AG. You can also find support and application forms on our website Moving electricity supplies or equipment | UK Power Networks