| No. | Condition Text |
|---|
| 1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
| 2. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
For the avoidance of doubt and to ensure that the development is carried out as approved. |
| 3. | The garden area shall not be subdivided at any time and nor shall there be any additional pedestrian or vehicular accesses into the site.
Reason:-
In order that the annex approved remains ancillary to the main dwelling. |
| 4. | Any residential occupation of the building hereby approved shall be limited to family members of the family occupying the main house at 172 Wennington Road, Rainham for residential purposes and shall not be occupied by any other persons.
Reason:-
In order that the annex approved remains ancillary to the main dwelling. |
| 5. | The annex hereby permitted shall not be arranged or disposed of as a separate unit of residential accommodation from the use of the main dwelling.
Reason:-
In order that the annex approved remains ancillary to the main dwelling. |
| 6. | For any development where a flood risk is identified, the Council as the Lead Local Flood Authority want to see developers consider and implement flood resilience/resistance measures into the buildings themselves. This is not to stop development but to ensure the protection for future residents is maintained and enhanced.
The following measures are strongly recommended, although this list is not exhaustive:-
- Raising the level of the building by at least 300mm above local levels;
- Waterproof membrane in the ground floor;
- Waterproof plaster and waterproofing to ground floor;
- Electrics from the upstairs down and sockets high up off the ground floor;
- Non return valves on the sewerage pipes;
- Emergency escape plan for each individual property;
- Air brick covers; and
- Movable flood barriers for entrances |
| 7. | The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material planning considerations, including planning policies and any representations which were received. It subsequently determined to grant planning permission in accordance with the National Planning Policy requirement that applications for sustainable development are approved where possible. A detailed analysis of the scheme is set out in the report on the application prepared by officers. |