No.Condition Text
1.The development hereby permitted shall begin no later than three years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the following approved plans: 2613.03 and 2613.04 Reason: For the avoidance of doubt and to ensure that the development is carried out as approved and is compliant with development plan policy.
3.Before the development hereby approved is occupied, the materials used on the external surfaces of the development must match those used on the external surfaces of the existing property. This applies unless differences are shown on the drawings hereby approved or are required by other conditions on this permission. Reason: To ensure the development is carried out in accordance with the consent sought, has an acceptable design and complies with policy 26 of the Havering Local Plan (2021).
4.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, nor any Statutory Instrument which amends, removes or replaces that Order, no window or other opening (other than those shown on the submitted and approved plans) shall be formed in the flank walls of the development hereby permitted without the receipt of a specific planning permission for it from the London Planning Authority. Reason: To protect the amenities of neighbouring occupiers and ensure the development complies with policy 7 of the Havering Local Plan (2021).
5.You are reminded that this decision notice only addresses requirements under Planning Legislation. You also need to check that whether or not the development requires consent under the Building Regulations, as this is an entirely separate process. Further information on the requirements of the Building Regulations can be found at: https://www.havering.gov.uk/building control.
6.You are reminded that this decision notice only addresses requirements under Planning Legislation. It does not give consent for an permanent or temporary changes to the public highway, the use of the public highway for the storage of materials or placing of apparatus associated with the construction or other processes, nor does it permit the discharge of surface water onto the public highway. You are encouraged to check whether or not works or activities necessitate separate consents under the requirements of other, non-planning legislation at the earliest opportunity by emailing environmentbusinesssupport@havering.gov.uk for further information. Unauthorised work on or use of the public highway and a failure to prevent the discharge of surface water on to the public highway area all an offence.
7.You are reminded that this decision notice only addresses requirements under Planning Legislation. You also need to check whether or not the development necessitates an agreement under the requirements of the Party Wall etc. Act 1996, as this is an entirely separate process. Further guidance on the Party Wall etc. Act 1996 can be found at: https;//www,gov.uk/housing-local-and-community/party-walls.
8.The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material planning considerations, including planning policies and any representations which were received. It subsequently determined to grant planning permission in accordance with the National Planning Policy requirement that applications for sustainable development are approved where possible. A detailed analysis of the scheme is set out in the report on the application prepared by officers.
9.* If the proposed works are located within 6m of a UK Power Network Substation, then they are notifiable under the Party Wall etc. Act 1996. The Applicant should provide details of the proposed works and liaise with the Company to ensure that appropriate protective measures and mitigation solutions are agreed in accordance with the Act. * The Applicant would be responsible for any costs associated with any appropriate measures required. * Any Party Wall Notice should be served on UK Power Networks at its registered office: UK Power Networks, Newington House, 237 Southwark Bridge Road, London SE1 6NP. * The UK Power Network engineering guidelines state that the distance between a dwelling of two or more stories with living or bedroom windows overlooking a distribution substation should be a minimum of ten metres if the transformer is outdoor, seven metres if the transformer has a GRP surround or one metre if the transformer is enclosed in a brick building. * The distance between buildings and substations should be greater than seven metres or as far as is practically possible. * Care should be taken to ensure that footings of new buildings are kept separated from substation structures. * Buildings should be designed so that rooms of high occupancy, i.e. bedrooms and living rooms, do not overlook or have windows opening out over the substation. Minimum distance for this should be at least 10m. * If noise attenuation methods are found to be necessary, we would expect to recover our costs from the developer. * UK Power Networks require 24 hour vehicular access to their substations. Consideration for this should be taken during the design stage of the development. * The development may have a detrimental impact the rights of UK Power Network's access to and from the substation. If in doubt please seek advice from their Property and Consents team at Barton Road, Bury St Edmunds, Suffolk, IP32 7BG. * No building materials should be left in a position where they might compromise the security of the substation or could be used as climbing aids to get over the substation surround. * There are underground cables on the site associated with the substation and these run in close proximity to the proposed development. Prior to commencement of work accurate records should be obtained from UK Power Network's Plan Provision Department at UK Power Networks, Fore Hamlet, Ipswich, IP3 8AA. * All works should be undertaken with due regard to Health & Safety Guidance notes HS(G)47 Avoiding Danger from Underground services. This document is available from local HSE offices. Should any diversion works be necessary as a result of the development then enquiries should be made to the UK Power Network Customer Connections department. The address is UK Power Networks, Metropolitan house,. Darkes Lane, Potters Bar, Herts, EN6 1AG.