No.Condition Text
1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice). Reason:- The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
3.Before the building(s) hereby permitted is first occupied, provision shall be made for 2 no. off-street car parking spaces within the site and thereafter this provision shall be made permanently available for use, unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure that adequate car parking provision is made off street in the interests of highway safety.
4.The development hereby permitted shall be constructed with external materials as previously approved under application Q0135.14. Reason: To ensure that the appearance of the proposed development will harmonise with the character of the surrounding area and in order that the development accords with the LDF Development Control Policies Development Plan Document Policy DC61.
5.The development hereby permitted shall be landscaped in accordance with the details as previously approved under Q0135.14. All planting, seeding or turfing comprised within the scheme shall be carried out in the first planting season following completion of the development and any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority. Reason:- In accordance with Section 197 of the Town and Country Planning Act 1990 and to enhance the visual amenities of the development, and that the development accords with the Development Control Policies Development Plan Document Policy DC61
6.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (as amended), no window or other opening (other than those shown on the submitted and approved plan,) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority. Reason:- In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
7.All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays. Reason:- To protect residential amenity, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61.
8.The development hereby permitted shall be implemented in accordance with the construction method statement as previously approved under application Q0135.14. Reason: To protect residential amenity, and in order that the development accords the Development Control Policies Development Plan Document Policy DC61.
9.The necessary agreement, notice or licence to enable the proposed alterations to the Public Highway shall be entered into prior to the commencement of the development. Reason: To ensure the interests of the travelling public and are maintained and comply with policies of the Core Strategy and Development Control Policies, namely CP10, CP17 and DC61.
10.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (Amendment) (No. 2) (England) Order 2008 Article 3, Schedule 2, Part 1, Classes A, B, C, D and E, which amends the Town and Country Planning (General Permitted Development) Order 1995 ("the 1995 Order) no extensions, roof extensions, roof alterations or outbuildings shall take place unless permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority. Reason: In the interests of amenity and to enable the Local Planning Authority to retain control over future development, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
11.The boundary treatment shall be implemented in accordance with details submitted on drawing no. 13114/09 and shall be permanently retained and maintained thereafter to the satisfaction of the Local Planning Authority. Reason: To protect the visual amenities of the development and to prevent undue overlooking of adjoining properties.
12.Prior to completion of the works hereby permitted, cycle storage of a type and in a location previously submitted to and agreed in writing by the Local Planning Authority shall be provided and permanently retained thereafter. Reason:- In the interests of providing a wide range of facilities for non-motor car residents, in the interests of sustainability.
13.A fee is required when submitting details pursuant to the discharge of conditions. In order to comply with the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, which came into force from 22.11.2012, a fee of £97 per request or £28 where the related permission was for extending or altering a dwellinghouse, is needed.
14.The planning obligations recommended in this report have been subject to the statutory tests set out in Regulation 122 of the Community Infrastructure Levy Regulations 2010 and the obligations are considered to have satisfied the following criteria:- (a) Necessary to make the development acceptable in planning terms; (b) Directly related to the development; and (c) Fairly and reasonably related in scale and kind to the development.
15.The Applicant is advised that planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted, considered and agreed. Any proposals which involve building over the public highway as managed by the London Borough of Havering, will require a licence and the applicant must contact StreetCare, Traffic & Engineering on 01708 433750 to commence the Submission/ Licence Approval process. Should this application be granted planning permission, the developer, their representatives and contractors are advised that this does not discharge the requirements under the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed for any highway works (including temporary works) required during the construction of the development. The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a license from the Council.
16.With regards to surface water drainage it is the responsibility of the developer to make proper provision for drainage to ground, water courses or a suitable sewer. In respect of surface water it is recommended that the applicant should ensure that storm flows are attenuated or regulated into the receiving public network through on or off site storage. When it is proposed to connect to a combined public sewer, the site drainage should be separate and combined at the final manhole nearest the boundary. Connections are not permitted for the removal of Ground Water. Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required. They can be contacted on 0845 850 2777.
17.Statement Required by Article 31 (cc) of the Town and Country Planning (Development Management) Order 2010: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraphs 186-187 of the National Planning Policy Framework 2012.