No.Condition Text
1.Details of the access, appearance, landscaping, layout and scale (hereinafter called "the reserved matters") shall be submitted to and approved in writing by the local planning authority before any development begins and the development shall be carried out as approved. Reason: This is outline permission only and these matters have been reserved for the subsequent approval of the Local Planning Authority.
2.Application/s for approval of the reserved matters shall be submitted to the Local Planning Authority within three years from the date of this permission. Reason: To comply with Section 92 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
3.The development to which this permission relates must be begun not later than the expiration of two years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last reserved matter to be approved. Reason: To comply with Section 92 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
4.Unless details are provided and approved as part of the reserved matters submission(s), no above ground works shall take place in relation to any of the development hereby approved until details and samples of all materials to be used in the external construction of the building(s) and hard landscaped areas are submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials. Reason: Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. Submission of samples prior to commencement will ensure that the appearance of the proposed development will harmonise with the character of the surrounding area and comply with Policy DC61 of the Development Control Policies Development Plan Document.
5.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans, particulars and specifications (as set out on page one of this decision notice) and any other plans, drawings, particulars and specifications pursuant to any further approval of details as are approved by the Local Planning Authority Reason: The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
6.Unless details are provided and approved as part of the reserved matters submission(s), prior to the commencement of the development, a drawing showing the proposed site levels of the application site and the finished floor levels of the proposed dwellings shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: Insufficient information has been supplied with the application to judge the proposed site levels of the proposed development. Submission of a scheme prior to commencement will ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. It will also ensure accordance with Section 197 of the Town and Country Planning Act 1990.
7.Prior to the first occupation of the development hereby permitted, provision shall be made for the storage of refuse and recycling awaiting collection according to details which shall previously have been agreed in writing by the Local Planning Authority. Reason: In the interests of amenity of occupiers of the development and also the visual amenity of the development and the locality generally, and in order that the development accords with the LDF Development Control Policies Development Plan Document Policy DC61.
8.Prior to the completion of the development hereby permitted, cycle storage of a type and in a location previously submitted to and approved in writing by the Local Planning Authority shall be provided and permanently retained thereafter. Reason: Insufficient information has been supplied with the application to demonstrate what facilities will be available for cycle parking. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use is in the interests of providing a wide range of facilities for non-motor car residents and sustainability.
9.All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays. Reason: To protect residential amenity, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61.
10.Prior to the commencement of any works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority; a) A Phase II (Site Investigation) Report, as the Phase I Report confirms the possibility of a significant risk to any sensitive receptors. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the sites ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors. b) A Phase III (Remediation Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation. A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to all receptors must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and procedure for dealing with previously unidentified any contamination. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. c) Following completion of measures identified in the approved remediation scheme mentioned in 1(c) above, a "Verification Report" that demonstrates the effectiveness of the remediation carried out, any requirement for longer-term monitoring of contaminant linkages, maintenance and arrangements for contingency action, must be produced, and is subject to the approval in writing of the Local Planning Authority. Reason: To protect those engaged in construction and occupation of the development from potential contamination and in order that the development accords with Development Control Policies Development Plan Document Policy DC53.
11.If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until a remediation strategy detailing how this unsuspected contamination shall be dealt with has been submitted to and approved in writing by the local planning authority. The remediation strategy shall be implemented as approved. a) Following completion of the remediation works as mentioned above, a 'Verification Report' must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved. Reason: To ensure that any previously unidentified contamination found at the site is investigated and satisfactorily addressed in order to protect those engaged in construction and occupation of the development from potential contamination.
12.Prior to the commencement of development, an Air Quality Assessment (AQA), prepared in accordance with best practice guidance shall be submitted to and approved in writing by the local planning authority. a) The assessment shall detail: · How the development may impact upon local air quality; · Model the baseline and future impact with and without the development; · Identify mitigation measures; · Identify/model how mitigation measures impact on the results produced in the baseline and future impact models; · Provide full details of measures that will be implemented (or continue to be implemented) after development is completed to protect both the internal air quality of buildings and to ensure that there is no adverse impact on air quality in the vicinity of the development. b) The use hereby permitted shall not commence until all measures identified in the Air Quality Assessment have been shown to be implemented to the satisfaction of the Local Planning Authority. For further guidance see: EPUK & IAQM 'Land-Use Planning & Development Control: Planning for Air Quality', published January 2017 and the Mayor of London Supplementary Planning Guidance 'The Control of Dust and Emissions from Construction and Demolition'. Reason: To manage and prevent further deterioration of existing low quality air across London in accordance with London Plan policy 5.3 and 7.14, and NPPF 181.
13.2. Air Quality Neutral Condition Prior to the commencement of development, an Air Quality Neutral assessment shall be submitted to and approved in writing by the local planning authority. The AQN assessment shall: · Determine the relevant Building Emission Benchmarks (BEBs) for NO2 and PM10 for the development based on its land use-class and location (see Appendices 5 and 6 in the GLA Sustainable Design and Construction SPG 2014 and the GLA Air Quality Neutral Planning Support Update); · Calculate the site's NOx and PM10 emissions from buildings and compare then with the BEB(s); · Determine the relevant transport emission benchmarks (TEBs) for NOx and PM10 for the site; · Calculate the site's NOx and PM10 emissions from transport and compare them with the TEBs; · The BEBs and the TEBs should both be met, for both NOx and PM10, to achieve the air quality neutral requirement. In-line with the policy context in London, the development shall be at least 'air quality neutral' and should aim to be 'air quality positive'. Developers shall mitigate the residual impacts and provide local mitigations to deal with any adverse air quality impacts associated with development proposals, including if the development fails to meet one or more of the AQN (Air Quality Neutral) benchmarks. The use hereby permitted shall not commence until all measures identified in the Air Quality Neutral Assessment have been shown to be implemented to the satisfaction of the Local Planning Authority in writing. Note: It is not possible to combine both benchmarks in order to achieve AQN. Both must be individually neutral or positive and if either is not, the emissions shall either be reduced or mitigation shall be provided. Reason: To manage and prevent further deterioration of existing low quality air across London in accordance with London Plan policy 5.3 and 7.14, and NPPF 181.
14.Prior to the commencement of development, a Dust Management Plan (DMP), based on an AQDRA (Air Quality and Dust Risk Assessment), shall be submitted to and approved in writing, by the local planning authority. The DMP shall be written in accordance with The Control of Dust and Emissions during Construction and Demolition SPG 2014 (or any subsequent guidance). The DMP will need to detail the measures to reduce the impacts during the construction phase. The development shall be undertaken in accordance with the approved plan. Reason: To manage and prevent further deterioration of existing low quality air across London in accordance with London Plan policy 5.3 and 7.14, and NPPF 181.
15.Details shall be submitted to and approved by the local planning authority prior to the first occupation of the development for the installation of Ultra-Low NOx boilers with maximum NOX Emissions less than 40 mg/kWh. The details as approved shall be implemented prior to the first occupation of the development and shall thereafter be permanently retained. Reason: To protect public health and to manage and prevent further deterioration of existing low quality air across London in accordance with London Plan policy 5.3 and 7.14, and NPPF 181.
16.Before development is commenced, a scheme shall be submitted to and approved in writing by the Local Planning Authority making provision for a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers. The Construction Method statement shall include details of: a) parking of vehicles of site personnel and visitors; b) storage of plant and materials; c) dust management controls; d) measures for minimising the impact of noise and, if appropriate, vibration arising from construction activities; e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority; f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities; g) siting and design of temporary buildings; h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies; i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded. And the development shall be carried out in accordance with the approved scheme and statement. Reason: Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects residential amenity. It will also ensure that the development accords the Development Control Policies Development Plan Document Policy DC61.
17.Active electric vehicle charging points shall be installed in at least 20% of the allocated parking spaces at the development with a further 20% of spaces having provision for charging points to be installed at a future date (passive EVCP). Reason: To protect public health by improving opportunities for the use of sustainable transport and to manage and prevent further deterioration of existing low quality air across London in accordance with London Plan policy 5.3 and 7.14, Car Parking Standards Table 6.2 and NPPF 35 and 181.
18.Unless details are provided and approved as part of the reserved matters submission(s), no development above ground level shall take place until details of all proposed walls, fences and boundary treatment are submitted to, and approved in writing by, the Local Planning Authority. The boundary development shall then be carried out in accordance with the approved details prior to the first occupation of the development for residential purposes and shall be permanently retained and maintained thereafter to the satisfaction of the Local Planning Authority. Reason: Insufficient information has been supplied with the application to judge the appropriateness of any boundary treatment. Submission of this detail prior to commencement will protect the visual amenities of the development, prevent undue overlooking of adjoining property and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61.
19.Unless details are provided and approved as part of the reserved matters submission(s), before any above ground development is commenced, surfacing materials for the access road and parking areas shall be submitted to and approved in writing by the Local Planning Authority and thereafter the access road shall be constructed with the approved materials. Once constructed, the access road shall be kept permanently free of any obstruction (with the exception of the car parking spaces shown on the approved plans) to prevent uses of the access road for anything but access. Reason: Insufficient information has been supplied with the application to judge the appropriateness of the surfacing materials. Submission of this detail prior to commencement will ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61.
20.Before the residential units hereby permitted are first occupied, the area set aside for car parking spaces shall be laid out and surfaced to the satisfaction of the Local Planning Authority and provide a minimum of 24.No. spaces, those areas shall be retained permanently thereafter for the accommodation of vehicles associated with the site. Reason: To ensure that car parking accommodation is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety, and that the development accords with the Development Control Policies Development Plan Document Policy DC33.
21.The proposals shall provide a 2.1 by 2.1 metre pedestrian visibility splay on either side of the proposed access onto Lower Mardyke Avenue and South Street, set back to the boundary of the public footway. There shall be no obstruction or object higher than 0.6 metres within the visibility splay. Reason: In the interests of highway safety, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC32.
22.The necessary agreement, notice or licence to enable the proposed alterations to the Public Highway shall be entered into prior to the commencement of development. Reason: In the interests of ensuring good design and ensuring public safety and to comply with policies of the Core Strategy and Development Control Policies DPD, namely CP10, CP17, and DC61.
23.Before the development hereby permitted is first commenced, vehicle cleansing facilities to prevent mud being deposited onto the public highway during construction works shall be provided on site in accordance with details to be first submitted to and approved in writing by the Local Planning Authority. The approved facilities shall be retained thereafter and used at relevant entrances to the site throughout the duration of construction works. If mud or other debris originating from the site is deposited in the public highway, all on-site operations shall cease until it has been removed. The submission will provide; a) A plan showing where vehicles will be parked within the site to be inspected for mud and debris and cleaned if required. The plan should show where construction traffic will access and exit the site from the public highway. b) A description of how the parking area will be surfaced, drained and cleaned to prevent mud, debris and muddy water being tracked onto the public highway; c) A description of how vehicles will be checked before leaving the site - this applies to the vehicle wheels, the underside of vehicles, mud flaps and wheel arches. d) A description of how vehicles will be cleaned. e) A description of how dirty/ muddy water be dealt with after being washing off the vehicles. f) A description of any contingency plan to be used in the event of a break-down of the wheel washing arrangements. Reason: Insufficient information has been supplied with the application in relation to wheel washing facilities. Submission of details prior to commencement will ensure that the facilities provided prevent materials from the site being deposited on the adjoining public highway, in the interests of highway safety and the amenity of the surrounding area. It will also ensure that the development accords with the Development Control Policies Development Plan Document Policies DC32 and DC61.
24.No development shall commence until full details of the drainage strategy, drainage layout, together with suds information to serve the development have been submitted to and agreed in writing by the Local Planning Authority prior to works commencing on development. The scheme agreed shall be implemented strictly in accordance with such agreement unless subsequent amendments have been agreed with the Local Planning Authority. Reason: To ensure that the development is properly drained.
25.No above ground development shall take place until details have been submitted to and approved in writing by the Local Planning Authority of access road widths, turning area dimensions and swept path analysis to demonstrate that the proposed development can be adequately serviced and that service vehicles can exit the site in forward gear. The development shall be carried out in accordance with the approved Reason: Insufficient information has been supplied with the application to demonstrate the width of the access road, the dimensions of the turning area and details of a swept path analysis. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use is in the interests of highway safety, and in order that the development accords with the Development Control Policies Development Plan Document Policies DC32 and DC36.
26.Prior to carrying out above grade works of each building or part of a building, details shall be submitted to and approved, in writing, by the Local Planning Authority to demonstrate that such building or such part of a building can achieve full 'Secured by Design' accreditation. The development shall only be carried out in accordance with the approved details. Reason: In the interest of community safety and in accordance with the Development Control Policies Development Plan Document Policies DC63 and London Borough of Havering's Supplementary Planning Documents on 'Designing Safer Places' (2010) and 'Sustainable Design Construction' (2009).
27.Prior to the first occupation of each building or part of a building or use, a 'Secured by Design' accreditation shall be obtained for such building or part of such building or use. Reason: In the interest of community safety and in accordance with the Development Control Policies Development Plan Document Policies DC63 and London Borough of Havering's Supplementary Planning Documents on 'Designing Safer Places' (2010) and 'Sustainable Design Construction' (2009).
28.All dwellings hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency. Reason: In order to comply with Policy 5.15 of the London Plan.
29.The dwellings hereby approved shall be constructed to comply with Part M4(2) of the Building Regulations - Accessible and Adaptable Dwellings. Reason: In order to comply with Policy DC7 of the Local Development Framework and Policy 3.8 of the London Plan.
30.Before the development hereby permitted is commenced, the landowner shall enter into a suitable legal agreement (such as a S106 agreement) or other appropriate mechanism that ensures, to the satisfaction of the local planning authority, the performance of the following obligations: Pursuant to Section 16 of the Greater London Council (General Powers) Act 1974 - Restrictions on owner and occupiers applying for Parking Permits including provisions not to sell, lease, let or otherwise dispose of any dwelling unit or permit any occupation of any dwelling unit without first imposing in the relevant transfer lease, letting or occupation document a term preventing any owner or occupier of any dwelling unit from applying to the Council for a residents parking permit for the area within which the proposed development is situated; - Controlled Parking Zone Contribution: Provision of £2688 to be paid prior to commencement; - Financial contribution of £36,552 to be used for off-site carbon emissions offset measures in lieu of on-site carbon reduction measures, to be paid prior to first occupation, or otherwise in accordance with updated energy measures submitted at reserved matters stage - Financial contribution of up to £35,092.64 towards the A1306 Linear Park, to be paid prior to commencement; - To provide affordable housing in accordance with a scheme of implementation for all New Road sites controlled by the developer that ensures that individual development sites are completed so that the overall level of affordable housing (by habitable rooms) provided across the sites does not at any time fall below 35% overall. The affordable housing to be minimum 50% social rent with up to 50% intermediate; Reason: The development would otherwise be unacceptable if the obligations sought were not able to be secured
31.All Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including 560kW used during the course of the demolition, site preparation and construction phases shall comply with the emission standards set out in chapter 7 of the GLA's supplementary planning guidance "Control of Dust and Emissions During Construction and Demolition" dated July 2014 (SPG), or subsequent guidance. Unless it complies with the standards set out in the SPG, no NRMM shall be on site, at any time, whether in use or not, without the prior written consent of the local planning authority. The developer shall keep an up to date list of all NRMM used during the demolition, site preparation and construction phases of the development on the online register at https://nrmm.london/. Reason: To manage and prevent further deterioration of existing low quality air across London in accordance with London Plan policy 5.3 and 7.14, and NPPF 181.
32.Statement pursuant to Article 31 of the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2012. The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework In accordance with para 186-187 of the National Planning Policy Framework 2012.
33.A fee is required when submitting details pursuant to the discharge of conditions. In order to comply with the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, which came into force from 22.11.2012, a fee of £97 per request or £28 where the related permission was for extending or altering a dwellinghouse, is needed.
34.Planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted considered and agreed. If new or amended access as required (whether temporary or permanent) there may be a requirement for the diversion or protection of third party utility plant and it is recommended that early involvement with the relevant statutory undertaker takes place. The applicant must contact Engineering Services on 01708 433751 to discuss the scheme and commence the relevant highway approvals process. Please note that unauthorised work on the highway is an offence.
35.The developer (including their representatives and contractors) is advised that planning consent does not discharge the requirements of the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed for any highway works (including temporary works of any nature) required during the construction of the development. Please note that unauthorised works on the highway is an offence.
36.The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a license from the Council. If the developer requires scaffolding, hoarding or mobile cranes to be used on the highway, a license is required and Streetcare should be contacted on 01708 434343 to make the necessary arrangements. Please note that unauthorised works on the highway is an offence.
37.The developer is advised that surface water from the development in both its temporary and permanent states should not be discharged onto the highway. Failure to prevent such is an offence.
38.In aiming to satisfy the condition the applicant should seek the advice of the Metropolitan Police Service Designing out Crime Officers (DOCOs). The services of MPS DOCOs are available free of charge and can be contacted via docomailbox.ne@met.police.uk or 02082173813.
39.Before occupation of the residential/ commercial unit(s) hereby approved, it is a requirement to have the property/properties officially Street Named and Numbered by our Street Naming and Numbering Team. Official Street Naming and Numbering will ensure that that Council has record of the property/properties so that future occupants can access our services. Registration will also ensure that emergency services, Land Registry and the Royal Mail have accurate address details. Proof of having officially gone through the Street Naming and Numbering process may also be required for the connection of utilities. For further details on how to apply for registration see: https://www.havering.gov.uk/Pages/Services/Street-names-and-numbering.aspx
40.The presence of European protected species, such as bats, is a material consideration in the planning process and the potential impacts that a proposed development may have on them should be considered at all stages of the process. Occasionally European protected species, such as bats, can be found during the course of development even when the site appears unlikely to support them. In the event that this occurs, it is advised that the developer stops work immediately and seeks the advice of the local authority ecologist and/or the relevant statutory nature conservation organisation (e.g. Natural England). Developers should note that it is a criminal offence to deliberately kill, injure or capture bats, or to deliberately disturb them or to damage or destroy their breeding sites and resting places (roosts). Further works may require a licence to proceed and failure to stop may result in prosecution.
41.The applicant's attention is drawn to the provisions of both the Wildlife and Countryside Act 1981, and the Countryside & Rights of Way Act 2000. Under the 2000 Act, it is an offence both to intentionally or recklessly destroy a bat roost, regardless of whether the bat is in the roost at the time of inspection. All trees should therefore be thoroughly checked for the existence of bat roosts prior to any works taking place. If in doubt, the applicant is advised to contact the Bat Conservation Trust at Quadrant House, 250 Kennington Lane, London, SE11 5RD. Their telephone number is 0845 1300 228.
42.Officers have considered, with due regard, the likely effect of the proposal on the need to reduce crime and disorder as part of the determination of this application, in accordance with section 17 of the Crime and Disorder Act 1998. In reaching a recommendation to approve, staff considers that the proposal will not undermine crime prevention or the promotion of community safety.
43.The applicant will be expected to provide letter boxes for all units and to be accessible from the external parts of the building.
44.The applicant shall be aware of the following: · ADMS-Roads output files must be provided to LB Havering on validation of the planning application. · AQ modelling must be based transport related inputs which have been approved by LB Havering's Transport Assessment team. · It is essential that junctions and heavily congested roads are modelled accurately and this is reflected in the choice of relevant node spacing and vehicle speed inputs. A reduction in 10 km.hr-1 of vehicle speeds is not representative of congestion in some instances. · Where under predictions occur nodes must be scrutinised and where necessary vehicle speeds adjusted to reflect queuing. · It is the responsibility of the applicant to ensure that their appointed consultants' modelling verification is robust and adjustment factors clearly explained and justified, calculations and graphs must be provided at validation. · Margin of error must not exceed 4 (refer to LAQM guidance as best practice). · Contrary to the values given in the EPUK guidance a magnitude of change greater than 0.5 µg/m3 is considered significant in areas where present concentrations are near to or breeching limit values and shall be assessed as such. Such changes do not contribute towards EU limit values (NPPF paragraph 124). · Any other scenarios should be considered which are relevant to this site. · Heathrow Met Data is not acceptable. · If there is insufficient monitoring data of the proposed development area, a minimum of 6 months diffusion tube monitoring should be conducted to inform the Air Quality Assessment. Locations should be agreed with Havering Officers before monitoring commences. · A written assessment of air quality for major developments is not acceptable; all assessments should include dispersion modelling of present and future air quality with & without the development. · A cumulative assessment of major committed developments in the area must be incorporated into the modelling. For further guidance see: EPUK & IAQM 'Land-Use Planning & Development Control: Planning for Air Quality', published January 2017 and the Mayor of London Supplementary Planning Guidance 'The Control of Dust and Emissions from Construction and Demolition'.
45.Informative Details A DMP: · May be integrated within a wider Construction Environmental Management Plan; · Must mitigate against negative impact on air quality and receptors in the vicinity of the development; · Must detail the measures that will be taken to reduce the impacts on air quality during all construction phases (Demolition, Construction, Earthworks, Trackout) · Include a maintenance schedule of the dust mitigation measures; · Undertake to carry out air quality monitoring (PM10) before and during demolition and construction works (usually three months prior to commencement of any works on site). Parameters to be monitored, duration, locations and monitoring techniques must be approved in writing by the London Borough of Havering prior to commencement of monitoring. · Shall be in accordance with "The Control of Dust and Emissions during Construction and Demolition", Mayor of London SPG 2014 (or any subsequent guidance).
46.The charging point should be supplied with an independent 32amp radial circuit and must comply with BS7671. A standard 3 pin, 13 amp external socket will be required, this shall comply with BS1363 and must be provided with a locking weatherproof cover if located externally to the building.
47.The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). The Mayoral CIL levy rate for Havering is £25/m² and is chargeable for each additional square metre of residential gross internal [floor] (GIA). The proposal is also liable for Havering Council's CIL. Havering's CIL charging rate for residential is £125m² (Zone A) for each additional square metre of GIA. As the permission is in Outline only, the amount of CIL payable will be calculated at the Reserved Matters stage. These charges are levied under s.206 of the Planning Act 2008. CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website. You are also advised to visit the planning portal website where you can download the appropriate document templates at http://www.planningportal.gov.uk/planning/applications/howtoapply/whattosubmit/cil