No.Condition Text
1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.All new external finishes shall be carried out in materials to match those of the existing building(s) to the satisfaction of the Local Planning Authority. Reason:- To safeguard the appearance of the premises and the character of the immediate area, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61.
3.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice). Reason:- The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
4.The premises shall not be used for the purposes hereby permitted other than between the hours of 7.30am and 5pm on Mondays to Saturdays and between 7.30am and 7pm on Sundays, Bank or Public holidays without the prior consent in writing of the Local Planning Authority. Reason:- To enable the Local Planning Authority to retain control in the interests of amenity, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
5.Before the use commences suitable equipment to remove and/or disperse odours and odorous material should be fitted to the extract ventilation system in accordance with a scheme to be designed and certified by a competent engineer and after installation a certificate to be lodged with the Planning Authority. Thereafter, the equipment shall be properly maintained and operated within design specifications during normal working hours. Reason:- Insufficient information has been supplied with the application to judge the technical specifications of the extract ventilation system. Submission of this detail prior to commencement of the use will protect the amenity of occupiers of nearby premises and ensure that the development accords with Development Control Policies Development Plan Document Policy DC61.
6.No building shall be occupied or use commenced until details of a waste management scheme is submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the method and location of refuse and recycling storage, including provision for all refuse to be properly contained within the approved facility, together with arrangements for refuse disposal. The scheme shall be implemented on site, in accordance with the approved details, prior to the first occupation or commencement of the use hereby approved and retained permanently thereafter. Reason:- Insufficient information has been supplied with the application to judge how waste will be managed on site. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use will protect the amenity of occupiers of nearby premises, and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61.
7.Before any works commence a scheme for any new plant or machinery shall be submitted to the local planning authority to achieve the following standard. Noise levels expressed as the equivalent continuous sound level LAeq (1 hour) when calculated at the boundary with the nearest noise sensitive premises shall not exceed LA90-10dB and shall be maintained thereafter to the satisfaction of the local planning authority. Reason:- To prevent noise nuisance to adjoining/adjacent properties.
8.Before the use commences a scheme to control the transmission of noise and vibration from any mechanical ventilation system installed shall be submitted and approved in writing by the local planning authority and implemented prior to the permitted use commencing. Thereafter, the equipment shall be properly maintained and operated during normal working hours. Reason:- To protect the amenity of occupiers of nearby premises.
9.Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with para 186-187 of the National Planning Policy Framework 2012, improvements required to make the proposal acceptable were negotiated with the agent Mr B Oddy via email. The revisions involved reduction in opening hours making the time of opening 7.30 instead. The amendments were subsequently submitted on 25/07/2016.