No.Condition Text
1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason: To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice). Reason: The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
3.No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of: a) parking of vehicles of site personnel and visitors; b) storage of plant and materials; c) dust management controls; d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities; e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority; f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities; g) siting and design of temporary buildings; h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies; i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded. And the development shall be carried out in accordance with the approved scheme and statement. Reason: Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects neighbouring amenity.
4.Dust Monitoring scheme Prior to the commencement of the development, a Dust Monitoring Scheme for the duration of the demolition and construction phase of the development hereby approved, shall be submitted for the written approval of the Local Planning Authority. The scheme shall detail; · Determination of existing (baseline) pollution levels; · Type of monitoring to be undertaken; · Number, classification and location of monitors; · Duration of monitoring; · QA/QC Procedures; · Site action levels; and · Reporting method. b) Following the completion of measures identified in the approved Dust Monitoring Scheme, a "Dust Monitoring Report" that demonstrates the effectiveness of the dust monitoring carried out must be produced, and is subject to the approval of the Local Planning Authority. The development shall be carried out in accordance with the approved scheme. Reason: To ensure that the construction activities do not give rise to any exceedances of the national air quality objectives/limit values for PM10 and/or PM2.5, or any exceedances of recognised threshold criteria for dust deposition/soiling.
5.Non road mobile machinery (NRMM) 1) Prior to the commencement of the development hereby approved, the developer or contractor must be signed up to the NRRM register. 2) The development site must be entered onto the register alongside all the NRMM equipment details. 3) The register must be kept up-to-date for the duration of the construction of development. 4) It is to be ensured that all NRMM complies with the requirements of the directive. 5) An inventory of all NRMM to be kept on-site stating the emission limits for all equipment. 6) All NRMM should be regularly serviced and service logs kept on site for inspection. Reason: Being a major development in Greater London, but outside the Non-Road Mobile Machinery (NRMM) Central Activity Zone, NRMM used on site must meet Stage IIIA of EU Directive 97/68/EC as a minimum. From 1st September 2020 the minimum requirement for any NRMM used on site within Greater London will rise to Stage IIIB of the directive.
6.No construction works or deliveries into the site shall take place other than between the hours of 08:00 to 18:00 on Monday to Friday and 08:00 to 13:00 hours on Saturdays unless agreed in writing with the local planning authority. No construction works or deliveries shall take place on Sunday, Bank or Public Holiday unless otherwise agreed in writing by the local planning authority. Reason: To protect neighbouring amenity.
7.A fee is required when submitting details pursuant to the discharge of conditions. In order to comply with the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, (as amended), a fee of £116 per request or £34 where the related permission was for extending or altering a dwellinghouse, is needed.
8.Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraphs 186-187 of the National Planning Policy Framework 2012.