| No. | Condition Text |
|---|
| 1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
| 2. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
For the avoidance of doubt and to ensure that the development is carried out as approved. |
| 3. | The development hereby approved shall be carried out in accordance with the recommendations relating to nesting birds as set out in Paragraph 5.2.1 of the Preliminary Ecological Appraisal and Biodiversity Net Gain Assessment (May 2025).
Reason;
In the interest of protection of nesting birds during construction. |
| 4. | Prior to the commencement of the development hereby approved, a method statement shall be submitted to and approved by the Local Planning Authority setting out the measures required to safeguard areas outside the cycle track corridor while construction takes place, in accordance with the recommendations set out in Paragraph 5.3 (2) of the Preliminary Ecological Appraisal and Biodiversity Net Gain Assessment (May 2025). This shall include, but not be limited to, details of access/egress for personnel and machinery, designated areas for material storage, protective measures for areas outside the corridor boundary and details of restoration of habitats should they be negatively affected. The development shall then be undertaken in accordance with the approved details.
Reason: In the interest of protecting the nature conservation value of the site. |
| 5. | No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of:
a) parking of vehicles of site personnel and visitors;
b) storage of plant and materials;
c) dust management controls;
d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities;
e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority;
f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities;
g) siting and design of temporary buildings;
h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies;
i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded.
And the development shall be carried out in accordance with the approved scheme and statement.
Reason:-
Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects residential amenity. |
| 6. | The biodiversity gain condition should secure the provision of a Biodiversity Gain Plan, as well as the following information:
a) The completed metric calculation tool showing the calculations of the pre-development and post-intervention biodiversity values.
b) Pre and post development habitat plans.
c) Legal agreement(s)
d) Biodiversity Gain Site Register reference numbers (if using off-site units).
e) Proof of purchase (if buying statutory biodiversity credits at a last resort). |
| 7. | Statement Required by Article 35(2) of the Town and Country Planning (Development Management) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraph 38 of the National Planning Policy Framework. |
| 8. | Changes to the public highway (including permanent or temporary access)
- Planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted considered and agreed. If new or amended access is required (whether temporary or permanent), there may be a requirement for the diversion or protection of third party utility plant or highway authority assets and it is recommended that early involvement with the relevant statutory undertaker takes place. The applicant should email environmentbusinesssupport@havering.gov.uk for further information. Please note that unauthorised work on the highway is an offence.
Highway legislation
- The developer (including their representatives and contractors) is advised that planning consent does not discharge the requirements of the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed for any highway works (including temporary works of any nature) required during the construction of the development. Please note that unauthorised work on the highway is an offence.
Temporary use of the public highway
- The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a licence from the Council. If the developer required scaffolding, hoarding or mobile cranes to be used on the highway, a licence is required and Street Management should be contacted to make the necessary arrangements. Please note that unauthorised use of the highway for construction works is an offence.
Surface water management
- The developer is advised that surface water from the development in both its temporary and permanent states should not be discharged onto the highway. Failure to prevent such is an offence. |