| No. | Condition Text |
|---|
| 1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
| 2. | All new external finishes shall be carried out in materials to match those of the existing building(s) to the satisfaction of the Local Planning Authority.
Reason:-
To safeguard the appearance of the premises and the character of the immediate area, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 3. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 4. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no porches shall be erected to the front or side of the extension hereby permitted, without the express permission in writing of the Local Planning Authority.
Reason:-
In the interests of amenity and to enable the Local Planning Authority to retain control over future development, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 5. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no window or other opening (other than those shown on the submitted and approved plan,) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority.
Reason:-
In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 6. | The roof area of the existing and proposed ground floor rear extension shall not be used as a balcony, roof garden or similar amenity area without the grant of further specific permission from the Local Planning Authority.
Reason:-
In the interests of the amenity of the occupiers of neighbouring dwelling, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 7. | Prior to the commencement of any groundworks or development of the site, details shall be submitted to and agreed in writing by the Local Planning Authority setting out suitable gas protection measures to be employed on site including, but not necessarily limited to, the installation of a suitable gas resistant membrane. The gas protection measures shall be carried out in strict accordance with the agreed details. Upon completion of installation, a 'Verification Report' must be submitted demonstrating that the works have been carried out.
Reason: Insufficient information has been submitted to ensure that the occupants of the development and property are not subject to any risks from soil gas and/or vapour in accordance with LDF Core Strategy and Development Control Policies DPD Policy DC53. |
| 8. | Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with para 186-187 of the National Planning Policy Framework 2012, improvements required to make the proposal acceptable were negotiated with Mr Stubbles (Agent) by phone. The revisions involved removal of the high level flank window from the boundary. The amendments were subsequently submitted on 17/12/19. |
| 9. | The Emergency Planning Department have advised that the following recommendations are strongly considered into the new element of the building:
Raising the level of the building by at least 300mm above local levels - it is understood that the Flood Risk Assessment says that in accordance with the Environment A Standing Advice for minor developments, the proposed finished floor levels of the extension are set to be no lower than the existing lower ground floor levels, but please take this into consideration if possible. |
| 10. | Furthermore, the applicant should note that the following recommendations should be strongly be considered when implanting the proposal:
· Waterproof membrane in the ground floor - Also consider these elements into the existing building to improve the properties resilience.
· Waterproof plaster and waterproofing to ground floor
· Electrics from the upstairs down and sockets high up off the ground floor
· Non return valves on the sewerage pipes where appropriate.
· Emergency escape plan for each individual property.
· Air brick covers.
· Movable flood barriers for entrances.
· Signing up to EA Flood Warning/Alerts |