| No. | Condition Text |
|---|
| 1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
| 2. | Materials to be used in the external construction of the building(s) are:
External Walls: London Brick - Rustic Antique
Painted Render - White
Roof Tiles: Ludlow Plus - Smooth Brown (MA10152S)
Windows and Doors: White UPVC
Fascias and Soffits: White UPVC
Gutters: Black UPVC
Reason:-
To ensure that the appearance of the proposed development will harmonise with the character of the surrounding area and comply with Policy DC61 of the Development Control Policies Development Plan Document. |
| 3. | The landscaping works shall be completed in accordance with drawing number PL-5616_100C (Hard & Soft Landscaping), received 15/1/18.
All planting, seeding or turfing comprised within the scheme shall be carried out in the first planting season following completion of the development and any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority.
Reason:-
In the interests of ensuring good design and ensuring that the development accords with the Development Control Policies Development Plan Document Policy DC61. It will also ensure accordance with Section 197 of the Town and Country Planning Act 1990. |
| 4. | The landscaping works shall be completed in accordance with drawing number PL-5616_100C (Hard & Soft Landscaping) received 15/1/18. The existing boundary fencing is to be retained between the site and the footpath link to Rainham Road. This will remain permanently thereafter unless otherwise agreed in writing by the local Planning Authority.
Reason:
In the interests of protecting the visual amenities of the development, prevent undue overlooking of adjoining property and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 5. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 6. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, other than porches erected in accordance with the Order, no extension or enlargement (including additions to roofs) shall be made to the dwellinghouse(s) hereby permitted, or any detached building erected, without the express permission in writing of the Local Planning Authority.
Reason:-
In the interests of amenity and to enable the Local Planning Authority to retain control over future development, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 7. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no window or other opening (other than those shown on the submitted and approved plan) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority.
Reason:-
In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 8. | The refuse and recycling facilities shall be as follows:
Household Waste - Straight 240 Litre Wheelie Bin (specification provided 03/11/17)
Recyclable Waste - Straight 240 Litre Wheelie Bin (specification provided 03/11/17)
These facilities shall be located in accordance with drawing number PL-5616_100C (Hard & Soft Landscaping), received 15/1/18.
The refuse and recycling facilities shall be permanently retained unless otherwise agreed in writing by the local Planning Authority.
Reason:-
To ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 9. | The cycle storage provided shall be completed in accordance with drawing numbers PL-5616_100C (Hard & Soft Landscaping )and PL-5616_101 (Timber Shed/ Cycle Rack).
The cycle storage shall be permanently retained unless otherwise agreed in writing by the local Planning Authority.
Reason:-
In the interests of providing a wide range of facilities for non-motor car residents and sustainability. |
| 10. | Before the development hereby permitted is first commenced, vehicle cleansing facilities to prevent mud being deposited onto the public highway during construction works shall be provided on site in accordance with drawing number PL-5616_102. The approved facilities shall be retained thereafter and used in conjunction with the Wheel Washing Statement provided throughout the duration of the construction works. If mud or other debris originating from the site is deposited in the public highway, all on-site operations shall cease until it has been removed.
Reason:-
In order to prevent materials from the site being deposited on the adjoining public highway, in the interests of highway safety and the amenity of the surrounding area, and in order that the development accords with the Development Control Policies Development Plan Document Policies DC61 and DC32. |
| 11. | All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays.
Reason:-
To protect residential amenity, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 12. | The development shall be carried out in accordance with the Construction Method Statement which was provided 15/01/18 and the email confirmation from the agent on 18/01/18.
Reason:-
To ensure that the method of construction protects residential amenity. It will also ensure that the development accords the Development Control Policies Development Plan Document Policy DC61. |
| 13. | Minor (up to 9 units):
All dwellings hereby approved shall be constructed to comply with Part M4(2) of the Building Regulations - Accessible and Adaptable Dwellings.
Reason:-
In order to comply with Policy DC7 of the Local Development Framework and Policy 3.8 of the London Plan. |
| 14. | All dwellings hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency.
Reason:-
In order to comply with Policy 5.15 of the London Plan. |
| 15. | The planning obligations recommended in this report have been subject to the statutory tests set out in Regulation 122 of the Community Infrastructure Levy Regulations 2010 and the obligations are considered to have satisfied the following criteria:-
(a) Necessary to make the development acceptable in planning terms;
(b) Directly related to the development; and
(c) Fairly and reasonably related in scale and kind to the development |
| 16. | The necessary agreement, notice or licence to enable the proposed alterations to the Public Highway shall be entered into prior to the commencement of development.
Reason:-
In the interests of ensuring good design and ensuring public safety and to comply with policies of the Core Strategy and Development Control Policies DPD, namely CP10, CP17, and DC61. |
| 17. | Changes to the public highway (including permanent or temporary access)
Planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted considered and agreed. If new or amended access as required (whether temporary or permanent), there may be a requirement for the diversion or protection of third party utility plant or highway authority assets and it is recommended that early involvement with the relevant statutory undertaker takes place. The applicant must contact Engineering Services on 01708 433751 to discuss the scheme and commence the relevant highway approvals process. Please note that unauthorised work on the highway is an offence.
Highway legislation
The developer (including their representatives and contractors) is advised that planning consent does not discharge the requirements of the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed for any highway works (including temporary works of any nature) required during the construction of the development.
Please note that unauthorised work on the highway is an offence.
Temporary use of the public highway
The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a license from the Council. If the developer requires scaffolding, hoarding or mobile cranes to be used on the highway, a licence is required and Street Management should be contacted make the necessary arrangements. Please note that unauthorised use of the highway for construction works is an offence.
Surface water management
The developer is advised that surface water from the development in both its temporary and permanent states should not be discharged onto the highway. Failure to prevent such is an offence. |
| 18. | Before occupation of the residential/ commercial unit(s) hereby approved, it is a requirement to have the property/properties officially Street Named and Numbered by our Street Naming and Numbering Team. Official Street Naming and Numbering will ensure that that Council has record of the property/properties so that future occupants can access our services. Registration will also ensure that emergency services, Land Registry and the Royal Mail have accurate address details. Proof of having officially gone through the Street Naming and Numbering process may also be required for the connection of utilities. For further details on how to apply for registration see:
https://www.havering.gov.uk/Pages/Services/Street-names-and-numbering.aspx |
| 19. | The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). Based upon the information supplied with the application, the CIL payable would be £2,120 (this figure may go up or down, subject to indexation). CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website. |
| 20. | Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraphs 186-187 of the National Planning Policy Framework 2012. |