1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.Before the building(s) hereby permitted is first occupied, the area set aside for car parking shall be laid out and surfaced to the satisfaction of the Local Planning Authority and retained permanently thereafter for the accommodation of vehicles visiting the site and shall not be used for any other purpose. Reason:- To ensure that car parking accommodation is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety, and that the development accords with the Development Control Policies Development Plan Document Policy DC33.
3.Before any of the development hereby permitted is commenced, samples of all materials to be used in the external construction of the building(s) shall be submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials. Reason:- To ensure that the appearance of the proposed development will harmonise with the character of the surrounding area, and that the Development Control Policies Development Plan Document Policy DC61.
4.No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of hard and soft landscaping, which shall include indications of all existing trees and shrubs on the site, and details of any to be retained, together with measures for the protection in the course of development. All planting, seeding or turfing comprised within the scheme shall be carried out in the first planting season following completion of the development and any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority. Reason:- In accordance with Section 197 of the Town and Country Planning Act 1990 and to enhance the visual amenities of the development, and that the development accords with the Development Control Policies Development Plan Document Policy DC61
5.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans, particulars and specifications. Reason:- The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
6.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995, no window or other opening (other than those shown on the submitted plan,) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority. Reason:- In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
7.Prior to completion of the works hereby permitted, cycle storage for 1 cycle per unit of a type and in a location previously submitted to and agreed in writing by the Local Planning Authority shall be provided and permanently retained thereafter. Reason:- In the interests of providing a wide range of facilities for non-motor car residents, in the interests of sustainability.
8.No construction works or deliveries into the site shall take place other than between the hours of 08.00 to 18.00 on Monday to Friday and 08.00 to 13.00 hours on Saturdays unless agreed in writing with the Local Planning Authority. No construction works or deliveries shall take place on Sundays, Bank or Public Holidays unless otherwise agreed in writing by the Local Planning Authority. Reason:- To protect residential amenity, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61.
9.Prior to the commencement of any works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority; a) A Phase II (Site Investigation) Report if the Phase I Report confirms the possibility of a significant risk to any sensitive receptors. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the sites ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors. b) A Phase III (Risk Management Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation. The report will comprise of two parts: Part A - Remediation Statement which will be fully implemented before it is first occupied. Any variation to the scheme shall be agreed in writing to the Local Planning Authority in advance of works being undertaken. The Remediation Scheme is to include consideration and proposals to deal with situation s where, during works on site, contamination is encountered which has not previously been identified. Any further contamination shall be fully assessed and an appropriate remediation scheme submitted to the Local Planning Authority for written approval. Part B - Following completion of the remediation works a "Validation Report" must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved. c) If during development works any contamination should be encountered which was not previously identified and is derived from a different source and/or of a different type to those included in the contamination proposals then revised contamination proposals shall be submitted to the LPA ; and d) If during development work, site contaminants are found in areas previously expected to be clean, then their remediation shall be carried out in line with the agreed contamination proposals. For further guidance see the leaflet titled, "Land Contamination and the Planning Process". Reason: To protect those engaged in construction and occupation of the development from potential contamination.
10.Prior to work commencing the Highway Authority requires that the developer or applicant, apply for a vehicle crossover under Section 184 of the Highways Act. Reason:- To ensure the parking provision required for the development is accessible from the Public Highway; to ensure the interests of the travelling public are maintained and to comply with Development Control Policies DC32 and DC33. A commercial standard access will be required for major demolition and construction activities.
11.The outbuildings hereby permitted shall be used as ancillary to the proposed dwellings and shall not be used as a separate unit of residential accommodation at any time. Reason:- In the interest of privacy and to protect the amenity of the adjoining neighbours at No.5 and No.9 Mavis Grove in accordance with the Residential Extensions and Alterations SPD and LDF Policy DC61 of the Core Strategy and Development Control Policies DPD.
12.Prior to the commencement of the development hereby permitted, details of the measures to be incorporated into the development demonstrating how 'Secured By Design' accreditation might be achieved shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details, and shall not be occupied or used until written confirmation of compliance with the agreed details has been submitted to and approved in writing by the LPA Reason: In the interest of creating safer, sustainable communities, reflecting guidance set out in PPS1, Policy 4B.6 of the London Plan, and Policies CP17 Design and DC63 Delivering Safer Places of the LBH LDF
13.Prior to the commencement of the development details of the existing ground levels and the proposed finished ground levels of the site shall be submitted to and approved in writing by the Local Planning Authority. The development shall then be carried out in accordance with the approved details. Reason: To ensure that the work is carried out at suitable levels in relation to the highway and adjoining land having regard to drainage, gradient of access, amenities of adjoining properties and the appearance of the development. Also in order that the development complies with Policy DC61 of the LDF Development Control Policies DPD
14.Before any of the buildings hereby permitted is first occupied, screen fencing of a type to be submitted to and approved in writing by the Local Planning Authority, 2 metres (6ft. 7ins.) high shall be erected on the party boundary between the proposed two dwellings and shall be permanently retained and maintained thereafter to the satisfaction of the Local Planning Authority. Reason:- To protect the visual amenities of the development and prevent undue overlooking of adjoining property, and that the development accords with the Development Control Policies Development Plan Document Policy DC61.
15.The proposed windows at ground floor serving the dining rooms and studies shall be permanently glazed with obscure glass to the satisfaction of the Local Planning Authority. Reason:- In the interests of privacy, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61.
16.The proposed flank windows at first floor serving bathrooms and en-suites shall be permanently glazed with obscure glass and with the exception of top hung fanlight(s) shall remain permanently fixed shut and thereafter be maintained to the satisfaction of the Local Planning Authority. Reason:- In the interests of privacy, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61.
17.INFORMATIVE: 1. Reason for approval: The proposed development is considered to be in accordance with the aims, objectives and provisions of Policies DC33 and DC61 of the LDF Core Strategy and Development Control Policies Development Plan Document. 2. The applicant is advised that planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted, considered and agreed. Any proposals which involve building over the public highway as managed by the London Borough of Havering, will require a licence and the applicant must contact Street Care, Traffic & Engineering on 01708 43 3750 to commence the Submission / Licence Approval process. 3. The developer, their representatives and contractors are advised that granting of this planning permission does not discharge the requirements under the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. formal notifications and approval will be needed for any highway works (including temporary works) required during the construction of the development. Note: Following a change in government legislation a fee is now required when submitting details pursuant to the discharge of conditions, in order to comply with the Town and Country Planning (Fees for Applications and Deemed Applications) (Amendment) (England) Regulations, which came into force from 06.04.2008. A fee of £85 per request (or £25 where the related permission was for extending or altering a dwellinghouse) is needed.