No. | Condition Text |
---|
1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
REASON: To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
2. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
- 44099/5501/019 Rev A - Existing Main Access Layout
- 44099/5501/020 Rev A - Proposed Main Access Layout
- Transport Statement - London Road Access Junction (Ref: 44099/5504 Rev A) dated 19 January 2021 prepared by Stantec
- WAQ-CPL-ZZ-ZZ-EL-A-0255 Rev L1 - Existing Elevations
- WAQ-CPL-ZZ-ZZ-GA-A-0252 Rev L1 - Demolition Plan
- WAQ-CPL-ZZ-ZZ-GA-A-0253 Rev L2 - Location Plan
- WAQ-CPL-ZZ-ZZ-GA-A-0260 Rev L1 - Existing Site Plan
- WAQ-CPL-ZZ-ZZ-GA-A-0261 Rev L1 - Proposed Site Plan
- WQS Environmental Plan dated 15th January 2021 prepared by Wates Residential
- Demolition and Environmental Managemnet Plan Plan (Ref: D10207) Version 2 dated 08 December 2020 prepared by Erith
- Status of St. Andrews Road during Demolition of Waterloo Estate (Ref: WQS/PA002) dated 12 February 2021.
- Letter (Ref: WQS/PA001) dated 23 February 20121 prepared by Avison Young.
REASON: For the avoidance of doubt and to ensure that the development is carried out as approved. |
3. | Before the development hereby permitted commences details of a scheme shall be submitted to and approved in writing by the local planning authority which specifies the provisions to be made for the control of noise emanating from the site. Such scheme as may be approved shall be implemented prior to first occupation and thereafter retained in accordance with such details.
REASON: To prevent noise nuisance to adjoining/adjacent properties. |
4. | Prior to the commencement of any demolition works on site, a detailed Dust Management Plan, including a Dust Monitoring Scheme, shall be submitted to and agreed in writing by the Local Planning Authority setting out dust and emissions control measures to be employed on site, in accordance with the Greater London Authority 'Control of Dust and Emissions during Construction and Demolition' Supplementary Planning Guidance (SPG) dated July 2014.
REASON: To reduce emissions from the demolition and construction of buildings. |
5. | Prior to the commencement of the development hereby approved, the developer or contractor must be signed up to the Non Road Mobile Machinery (NRMM) register. The development site must be entered onto the register alongside all the NRMM equipment details. The register must be kept up-to-date for the duration of the construction of development. All NRMM used during the course of the development that is within the scope of the Greater London Authority 'Control of Dust and Emissions during Construction and Demolition' Supplementary Planning Guidance (SPG) dated July 2014, or any subsequent amendment or guidance, shall comply with the emission requirements therein. An inventory of all NRMM to be kept on-site stating the emission limits for all equipment.
REASON: To reduce emissions from construction and demolition activities and comply with current NRMM emission standards, in accordance with the Greater London Authority 'Control of Dust and Emissions during Construction and Demolition' Supplementary Planning Guidance (SPG). |