No.Condition Text
1.The development to which this permission relates must be commenced not later than five years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
2.All new external finishes shall be carried out in materials to match those of the existing building(s) to the satisfaction of the Local Planning Authority. Reason:- To safeguard the appearance of the premises and the character of the immediate area, and in order that the development accords with the Unitary Development Plan policy ENV1.
3.No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of hard and soft landscaping, which shall include indications of all existing trees and shrubs on the site, and details of any to be retained, together with measures for the protection in the course of development. All planting, seeding or turfing comprised within the scheme shall be carried out in the first planting season following completion of the development and any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority. Reason:- In accordance with Section 197 of the Town and Country Planning Act 1990 and to enhance the visual amenities of the development, and that the development accords with the Unitary Development Plan policy ENV1.
4.Before any buildings hereby permitted is first occupied, screen fencing of the type to be approved in writing by the Local Planning Authority, 2 metres (6ft. 7ins) high shall be erected around the subject plot, with exception of the vehicular/pedestrian access point into the site. Reason:- To protect the visual amenities of the development and prevent undue overlooking of adjoining properties.
5.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans, particulars and specifications. Reason:- The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Unitary Development Plan policy ENV1.
6.No construction works or deliveries into the site shall take place other than between the hours of 08.00 to 18.00 on Monday to Friday and 08.00 to 13.00 hours on Saturdays unless agreed in writing with the Local Planning Authority. No construction works or deliveries shall take place on Sundays, Bank or Public Holidays unless otherwise agreed in writing by the Local Planning Authority. Reason:- To protect residential amenity, and in order that the developmenta ccords with Unitary Development Plan policy ENV1.
7.Before development is commenced, a scheme shall be submitted to and approved in writing by the Local Planning Authority making provision for a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers. The Construction Method statement shall include details of: a) parking of vehicles of site personnel and visitors; b) storage of plant and materials; c) dust management controls; d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities; e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority; f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities; g) siting and design of temporary buildings; h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies; i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded. And the development shall be carried out in accordance with the approved scheme and statement. Reason:- To protect residential amenity, and in order that the development accords with Unitary Development Plan policy ENV1.
8.Before the building hereby permitted is first occupied, a scheme for the fire protection of the property shall be submitted to and agreed in writing by the Local Planning Authority. Reason:- For the safety of the future occupiers of the single storey bungalow
9.No building, engineering operations or other development on the site, shall be commenced until a scheme for the protection of preserved trees on the site has been submitted to and agreed in writing by the Local Planning Authority. Such scheme shall contain details of the erection and maintenance of fences or walls around the trees, details of underground measures to protect roots, the control of areas around the trees and any other measures necessary for the protection of the trees. Such agreed measures shall be implemented and /or kept in place until the approved development is completed to the satisfaction of the Local Planning Authority. Reason:- To protect the trees on the site subject to a Tree Preservation Order.
10.INFORMATIVE: Reason for approval: The proposed development is considered to be in accordance with the aims, objectives and provisions of Policy ENV1, ENV13, HSG1, HSG5, TRN2, TRN18 and Appendix 1, 2 and 3 of the Havering Unitary Development Plan.