No. | Condition Text |
---|
1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
2. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
3. | The car parking area hereby approved shall be used solely for the provision of domestic parking spaces for the use of occupiers of the existing dwelling at no. 381 Rush Green Road and shall not be used separately or in connection with any trade or business.
Reason: In the interests of residential amenity. |
4. | The vehicular access to the front hereby permitted shall be surfaced with porous materials, or provision shall be made to direct run-off water from the hard surface to a permeable or porous area or surface within the curtilage of the dwellinghouse.
Reason:-
To ensure that surface water run-off is controlled, in order to reduce the impact of flooding and pollution of water courses, and that the development accords with the Development Control Policies Development Plan Document Policies DC49 and DC61. |
5. | Statement Required by Article 35(2) of the Town and Country Planning (Development Management) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraph 38 of the National Planning Policy Framework. |
6. | The vehicle crossover/dropped kerb requires the Local Borough of Havering's Highway's Authority to carry out the design, construction and implementation of the works. The applicant must apply to the Highways Authority for a vehicle crossover/dropped kerb at the following link:
https://www.havering.gov.uk/info/20004/parking/141/apply_for_a_dropped_kerb
Please note that unauthorised works to the highway is an offence. A vehicle crossover in the London Borough of Havering is only permitted to be constructed by the LBH Highways Authority and not by any other third party, unless authorised by the Council in writing. |