| No. | Condition Text |
|---|
| 1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
| 2. | Prior to any above ground works, a written specification of external walls and roof materials to be used in the construction of the building(s) shall be submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials.
Reason:-
Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. Submission of a written specification prior to any above ground works will ensure that the appearance of the proposed development will harmonise with the character of the surrounding area and comply with Policy DC61 of the Development Control Policies Development Plan Document. |
| 3. | Prior to any above ground works, details shall be submitted to and approved by the Local Planning Authority for a scheme of hard and soft landscaping, which shall include indications of all existing trees and shrubs on the site, and details of any to be retained, together with measures for the protection in the course of development to BS5837 and including Root Protection Zone (RPZ). All planting, seeding or turfing comprised within the scheme shall be carried out in the first planting season following completion of the development and any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority.
Reason:-
Insufficient information has been supplied with the application to judge the appropriateness of the hard and soft landscaping proposed. Submission of a written specification prior to any above ground works will ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. It will also ensure accordance with Section 197 of the Town and Country Planning Act 1990. |
| 4. | The proposed development shall be implemented in accordance with the Arboricultural Report BS5837 at 43 Parkstone Avenue, Hornchurch, Essex, RM11 3LN dated 13th January 2021, including any recommendations.
Reason:-
To ensure that the development accords with the Development Control Policies Development Plan Document Policies DC60 and DC61. It will also ensure accordance with Section 197 of the Town and Country Planning Act 1990. |
| 5. | Prior to the first occupation of the replacement dwelling hereby permitted, the proposed 1.8 metre high obscured glazed glass screen on the east and west side of the proposed roof terrace shall be erected in accordance with the approved drawings PA-965-PD-03 Revision B and PA-965-PD-04 Revision A and retained permanently thereafter to the satisfaction of the Local Planning Authority.
Reason: -
In the interest of privacy and to protect the amenity of the adjoining neighbours at No.41 and No.47 Parkstone Avenue, Hornchurch in accordance with the Residential Extensions and Alterations SPD and Policy DC61 of the Core Strategy and Development Control Policies DPD. |
| 6. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 7. | The proposed first floor flank windows shown on the approved plans PA-965-PD-03 Revision A and PA-965-PD-04 Revision A, showing the proposed first floor flank windows serving the en-suites adjacent to Nos. 41 and 47 Parkstone Avenue, Hornchurch shall be permanently glazed with obscure glass not less than 4 on the standard scale of obscurity and shall thereafter be maintained and permanently fixed shut.
Reason:-
In the interests of privacy, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61 |
| 8. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Classes A, B and C, no extensions or enlargement (including additions to roofs) shall be made to the dwellinghouse(s) hereby permitted without the express permission in writing of the Local Planning Authority.
Reason:-
In the interests of amenity and to enable the Local Planning Authority to retain control over future development, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 9. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no window or other opening (other than those shown on the submitted and approved plan,) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority.
Reason:-
In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 10. | The roof area of the single storey rear projection of the replacement dwelling fronting the en-suite and dressing area of bedroom 1 and bedroom 2 shall not be used as a balcony, roof garden or similar amenity area without the grant of further specific permission from the Local Planning Authority.
Reason:-
In the interests of the amenity of the occupiers of neighbouring dwelling, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 11. | Before the development hereby permitted is first commenced, vehicle cleansing facilities to prevent mud being deposited onto the public highway during construction works shall be provided on site in accordance with details to be first submitted to and approved in writing by the Local Planning Authority. The approved facilities shall be retained thereafter and used at relevant entrances to the site throughout the duration of construction works. If mud or other debris originating from the site is deposited in the public highway, all on-site operations shall cease until it has been removed.
The submission will provide;
a) A plan showing where vehicles will be parked within the site to be inspected for mud and debris and cleaned if required. The plan should show where construction traffic will access and exit the site from the public highway.
b) A description of how the parking area will be surfaced, drained and cleaned to prevent mud, debris and muddy water being tracked onto the public highway;
c) A description of how vehicles will be checked before leaving the site - this applies to the vehicle wheels, the underside of vehicles, mud flaps and wheel arches.
d) A description of how vehicles will be cleaned.
e) A description of how dirty/ muddy water be dealt with after being washing off the vehicles.
f) A description of any contingency plan to be used in the event of a break-down of the wheel washing arrangements.
Reason:-
In order to prevent materials from the site being deposited on the adjoining public highway, in the interests of highway safety and the amenity of the surrounding area and in order that the development accords with the Development Control Policies Development Plan Document Policies DC61 and DC32 |
| 12. | No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of:
a) parking of vehicles of site personnel and visitors;
b) storage of plant and materials;
c) dust management controls;
d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities;
e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority;
f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities;
g) siting and design of temporary buildings;
h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies;
i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded.
And the development shall be carried out in accordance with the approved scheme and statement.
Reason:-
Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects residential amenity. It will also ensure that the development accords the Development Control Policies Development Plan Document Policy DC61. |
| 13. | No plant or machinery shall be installed or operated unless details of the plant/machinery including noise attenuation and vibration control measures are submitted to and approved in writing by the Local Planning Authority. All plant/machinery shall be installed and operated in accordance with the details approved.
Reason:- Insufficient information has been supplied with the application in relation to the proposed plant and machinery. Submission of details prior to the installation of any new plant or machinery will ensure that its protects residential amenity. It will also ensure that the development accords the Development Control Policies Development Plan Document Policy DC61. |
| 14. | Prior to the first occupation of the development, details shall be submitted to and agreed in writing by the Local Planning Authority for the installation of Ultra-Low NOx boilers with maximum NOx Emissions less than 40 mg/kWh. Where any installations do not meet this emissions standard it should not be operated without the fitting of suitable NOx abatement equipment or technology as determined by a specialist to ensure comparable emissions. The installation of the boilers shall be carried out in strict accordance with the agreed details and shall thereafter be permanently retained. Following installation emissions certificates will need to be provided to the Local Planning Authority to verify boiler emissions.
Reason: To minimise the impact of building emissions on local air quality. |
| 15. | Planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted, considered and agreed. If new or amended access as required (whether temporary or permanent), there may be a requirement for the diversion or protection of third party utility plant and it is recommended that early involvement with the relevant statutory undertake takes place. The applicant must contact Engineering serices on 01708433751 to discuss the scheme and commence the relevant highway approvals process. Please note that unauthorised work on the highway is an offence. |
| 16. | The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a license from the Council. If the developer requires scaffolding, hoarding or mobile cranes to be used on the highway a license is required and Streetcvare should be contacted on 01708434343 to make the necessary arrangements.
Please note that unauthorised use of the highway for the construction works is an offence. |
| 17. | The developer (including their representatives and contractors) is advised that planning consent does not discharge the requirements of the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed for any highway works (including temporary works of any nature) required during the construcvtion of the development. please note that unauthorised work in the highway is an offence. |
| 18. | The applicant is advised to exercise extreme caution in carrying out any works which that may harm the health, or the safety, of the preserved tree on either side and the rear of the proposed development. Special care should be taken not to sever any substantial roots which may be supporting the tree.
It is advised that the applicant contacts the Council's Senior Arboricultural Officer (Mr Goldrick) on the following telephone number 01708 431594 prior to undertaken any works on site to seek advise in relation to the Preserved Trees on site. |
| 19. | A fee is required when submitting details pursuant to the discharge of conditions. In order to comply with the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, (as amended), a fee of £116 per request or £34 where the related permission was for extending or altering a dwellinghouse, is needed. |
| 20. | Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with paragraph 38 of the National Planning Policy Framework 2018, improvements required to make the proposal acceptable were negotiated with Mr Barrett by phone and e-mail. The revisions involved including privacy screens at the rear at first floor level and relocating the car lift further away from the boundary with No.41 Parkstone Avenue The amendments were subsequently submitted on 07-12-20 & 22-01-21. |
| 21. | The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). The Mayoral CIL levy rate for Havering is £25/m² and is chargeable for each additional square metre of residential gross internal [floor] (GIA). Based upon the information supplied with the application, £26,000 would be payable due to result of the additional floor area with 1040m² of GIA, however this may be adjusted subject to indexation.
The proposal is also liable for Havering Council's CIL. Havering's CIL charging rate for residential is £125m² (Zone A) for each additional square metre of GIA. Based upon the information supplied with the application, £130,000 would be payable, subject to indexation.
These charges are levied under s.206 of the Planning Act 2008. CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website. You are also advised to visit the planning portal website where you can download the appropriate document templates at http://www.planningportal.gov.uk/planning/applications/howtoapply/whattosubmit/cil |