| No. | Condition Text |
|---|
| 1. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
For the avoidance of doubt and to ensure that the development is carried out as approved. |
| 2. | The materials shown on the approved drawings and documents shall be implemented unless otherwise agreed in writing with the Local Planning Authority.
Reason:-
To enable the Local Planning Authority to retain control and to overcome the necessity for a revised reserved matters application in the event that a change in materials is required. |
| 3. | "All mitigation measures and/or works shall be carried out in accordance with the details contained in the following documents as already submitted with the planning application and agreed in principle with the local planning authority prior to determination:
· · Preliminary Ecological Appraisal (Arbtech, 19/10/2023)
· · Ecological Mitigation, Enhancement and Management Plan (Arbtech, 24/10/2023)
· · Potential Roost Feature (PRF) Inspection Survey (Greenwood Environmental, 30th November 2023)
This may include the appointment of an appropriately competent person e.g. an ecological clerk of works (ECoW) to provide on-site ecological expertise during construction. The appointed person shall undertake all activities, and works shall be carried out, in accordance with the approved details."
Reason:-
To conserve protected and Priority species and allow the LPA to discharge its duties under the Conservation of Habitats and Species Regulations 2017 (as amended), the Wildlife & Countryside Act 1981 (as amended) and s40 of the NERC Act 2006 (Priority habitats & species). |
| 4. | "Prior to occupation, a "lighting design strategy for biodiversity" in accordance with GN: 08/23 (ILP)shall be submitted to and approved in writing by the local planning authority. The strategy shall:
· a) identify those areas/features on site that are particularly sensitive for bats and that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and
· b) show how and where external lighting will be installed (through provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent the above species using their territory or having access to their breeding sites and resting places.
All external lighting shall be installed in accordance with the specifications and locations set out in the scheme and maintained thereafter in accordance with the scheme. Under no circumstances should any other external lighting be installed without prior consent from the local planning authority."
Reason:-
To allow the LPA to discharge its duties under the Conservation of Habitats and Species Regulations 2017 (as amended), the Wildlife & Countryside Act 1981 (as amended) and s40 of the NERC Act 2006 (Priority habitats & species). |
| 5. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the side walls or roof slopes of the three detached dwellings hereby approved.
Reason: -
To prevent overlooking to adjoining properties. |
| 6. | Statement Required by Article 35(2) of the Town and Country Planning (Development Management) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraph 38 of the National Planning Policy Framework. |
| 7. | The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). The Mayoral CIL levy rate for Havering is £25/m² and is chargeable for each additional square metre of residential gross internal [floor] (GIA). Based upon the information supplied with the application, £13,575 would be payable due to result in a new residential property with 543m² of GIA, however this may be adjusted subject to indexation.
The proposal is also liable for Havering Council's CIL. Havering's CIL charging rate for residential is £125m² (Zone A) [amend where Zone B] for each additional square metre of GIA. Based upon the information supplied with the application, ££67,875 would be payable, subject to indexation.
These charges are levied under s.206 of the Planning Act 2008. CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website. You are also advised to visit the planning portal website where you can download the appropriate document templates at http://www.planningportal.gov.uk/planning/applications/howtoapply/whattosubmit/cil |
| 8. | Before occupation of the residential/ commercial unit(s) hereby approved, it is a requirement to have the property/properties officially Street Named and Numbered by our Street Naming and Numbering Team. Official Street Naming and Numbering will ensure that that Council has record of the property/properties so that future occupants can access our services. Registration will also ensure that emergency services, Land Registry and the Royal Mail have accurate address details. Proof of having officially gone through the Street Naming and Numbering process may also be required for the connection of utilities. For further details on how to apply for registration see:
https://www.havering.gov.uk/Pages/Services/Street-names-and-numbering.aspx |
| 9. | This permission should also be taken as discharging conditions 7, 9, 12, 25 and 26 of permission ref. P0762.21 excepting that such agreed details may need to be altered in order to satisfy other conditions. |