No. | Condition Text |
---|
1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
2. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
3. | The throughput of materials imported to the site shall not exceed 75,000 tonnes per annum.
Reason:-
To minimise the harm to the environment, to ensure the development does not adversely impact on local infrastructure and to comply with the Development Control Policies Development Plan Document policies DC32, DC52, DC55 and DC61 and Joint Waste Development Plan policies W4 and W5. |
4. | No materials shall be stockpiled or stored at a height greater than 4 metres when measured from adjacent ground level and shall then only be in the locations identified on drawing titled 'Proposed Site Plan', drawing no. DHA/10591/23 Rev B.
Reason:-
In the interest of visual amenity and that the development accords with Development Control Policies Development Plan Document policy DC61 and Joint Waste Development Plan policy W5. |
5. | Before any of the development hereby permitted is commenced, written specification of external walls and roof materials to be used in the construction of the building(s) shall be submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials.
Reason:-
Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. Submission of a written specification prior to commencement will ensure that the appearance of the proposed development will harmonise with the character of the surrounding area and comply with Policy DC61 of the Development Control Policies Development Plan Document. |
6. | No beneficial occupation of the development hereby permitted shall take place until details of covered cycle parking provision, appropriate for the site use and number of employees, have been submitted to and approved in writing by the local planning authority. The details shall include the design, location and number of spaces for cycle parking to be provided. The development shall be carried out in accordance with the approved details and shall thereafter be retained and maintained for the duration of the development hereby permitted.
Reason:-
Insufficient information has been supplied with the application to demonstrate what facilities will be available for cycle parking. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use is in the interests of providing a wide range of facilities for non-motor car residents, sustainability and to comply with Control Policies Development Plan Document policies DC33 and DC35. |
7. | Prior to the commencement of the development hereby approved, details of all proposed walls, fences and boundary treatment shall be submitted to, and approved in writing by, the Local Planning Authority. The boundary development shall then be carried out in accordance with the approved details and retained permanently thereafter to the satisfaction of the Local Planning Authority.
Reason:
Insufficient information has been supplied with the application to judge the appropriateness of any boundary treatment. Submission of this detail prior to commencement will protect the visual amenities of the development, prevent undue overlooking of adjoining property and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
8. | No works shall take place in relation to any of the development hereby approved until details of surface water drainage works are submitted to and approved in writing by the Local Planning Authority. Surface water drainage shall be provided in accordance with the approved details.
Reason:-
Surface water drainage works are required on site to prevent the risk of flooding. Submission of a scheme prior to commencement will ensure that the measures to be employed are technically sound and that the development accords with the Development Control Policies Development Plan Document Policies DC49 and DC61. |
9. | Prior to the commencement of any works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority;
a) A Phase II (Site Investigation) Report. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the sites ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors.
b) A Phase III (Remediation Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation. A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to all receptors must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and procedure for dealing with previously unidentified any contamination. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
c) Following completion of measures identified in the approved remediation scheme mentioned in 1(c) above, a "Verification Report" that demonstrates the effectiveness of the remediation carried out, any requirement for longer-term monitoring of contaminant linkages, maintenance and arrangements for contingency action, must be produced, and is subject to the approval in writing of the Local Planning Authority.
Reason:-
To protect those engaged in construction and occupation of the development from potential contamination and in order that the development accords with Development Control Policies Development Plan Document Policy DC53. |
10. | a) If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until a remediation strategy detailing how this unsuspected contamination shall be dealt with has been submitted to and approved in writing by the local planning authority. The remediation strategy shall be implemented as approved.
b) Following completion of the remediation works as mentioned in (a) above, a 'Verification Report' must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved.
Reason:-
To ensure that any previously unidentified contamination found at the site is investigated and satisfactorily addressed in order to protect those engaged in construction and occupation of the development from potential contamination. |
11. | Prior to the commencement of the development, a Dust Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The Dust Management Plan shall include appropriate measures to prevent or where that is not practicable to minimise the emission of dust from the site. The development shall be carried out in accordance with the approved Dust Management Plan.
Reason:-
To ensure satisfactory measures for the control of dust in the interests of health and safety and in order that the development accords with Development Control Policies Development Plan Document Policy DC52. |
12. | Before any works commence a scheme for any new plant or machinery shall be submitted to the local planning authority to achieve the following standard. Noise levels expressed as the equivalent continuous sound level LAeq (1 hour) when calculated at the boundary with the nearest noise sensitive premises shall not exceed LA90 -10dB and shall be maintained thereafter to the satisfaction of the Local Planning Authority.
Reason:-
To prevent noise nuisance to adjoining properties in accordance with Policy DC55 of the Development Control Policies Development Plan Document. |
13. | No building shall be occupied or use commenced until external lighting is provided in accordance with details previously submitted to and approved in writing by the Local Planning Authority. The lighting shall be provided and operated in strict accordance with the approved scheme.
Reason:-
Insufficient information has been supplied with the application to judge the impact arising from any external lighting required in connection with the building or use. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use will protect residential amenity and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
14. | No development, which shall include lighting and formal landscaping, parking or storage of materials, shall take place in the reserved area, that would prevent or restrict the future implementation of the riverside pathway along the southern edge of the site.
Reason:-
To safeguard the objective of achieving a continuous riverside path along the Thames in accordance with Policy CP7 of the Development Control Policies Development Plan Document. |
15. | Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with para 186-187 of the National Planning Policy Framework 2012, improvements required to make the proposal acceptable were negotiated with John Collins of DHA Planning via email. The revisions involved alterations to the site layout. The amendments were subsequently submitted on 7/2/18. |
16. | The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). Based upon the information supplied with the application, the CIL payable would be £20,000 (this figure may go up or down, subject to indexation). CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website. |
17. | A fee is required when submitting details pursuant to the discharge of conditions. In order to comply with the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, (as amended), a fee of £116 per request or £34 where the related permission was for extending or altering a dwellinghouse, is needed. |
18. | In addition to planning permission and operational permits, this development may also require a
permit under the Environmental Permitting (England and Wales) Regulations 2010 from the
Environment Agency for any proposed works or structures, in, under, over or within eight metres
of the top of the bank of a designated a 'main river', or within 16m of a tidal defence (including
ground anchors and tie rods) This was formerly called a Flood Defence Consent. Some
activities are also now excluded or exempt. A permit is separate to and in addition to any
planning permission granted. Further details and guidance are available on the GOV.UK
website: https://www.gov.uk/guidance/flood-risk-activities-environmental-permits. |