No.Condition Text
1.The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as amended), particulars and specifications (as set out on page one of this decision notice) and any other plans, drawings, particulars and specifications pursuant to any further approval of details as are approved by the Local Planning Authority Reason: The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Policy DC61 of LBH's 'Development Plan Document' 2008.
3.No development above ground shall be commenced unless and until a schedule of materials and samples of such materials and finishes and colours to be used for the external construction of all building(s) are submitted to and approved by the Local Planning Authority in writing and all materials used shall conform to those approved and thereafter the development shall be constructed with the approved materials. In respect of the brickwork, full sample panels of the brickwork including colour, texture, face bond and pointing shall be provided. Reason: Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. Submission of samples prior to commencement will ensure that the appearance of the proposed development will harmonise with the character of the surrounding
4.No development above ground level shall take place until details of all proposed walls, fences and boundary treatment are submitted to, and approved in writing by, the Local Planning Authority. The boundary development shall then be carried out in accordance with the approved details prior to the first occupation of the development for residential purposes and shall be permanently retained and maintained thereafter to the satisfaction of the Local Planning Authority. Reason: Insufficient information has been supplied with the application to judge the appropriateness of any boundary treatment. Submission of this detail prior to commencement will protect the visual amenities of the development, prevent undue overlooking of adjoining property and ensure that the development accords with DC61 of LBH's 'Development Plan Document' 2008.
5.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 or Orders amending or revoking and re-enacting the same, other than boundary treatment approved in accordance with Condition 4 no gate, fence, wall or other means of enclosure shall be erected or constructed unless prior written permission has been granted by the Local Planning Authority (pursuant to an application). Reason: In order to safeguard the character and visual amenities of the locality in accordance with Policy 3.5 of the 'London Plan' 2016 and Policy CP17 of LBH's 'Development Plan Document' 2008.
6.No development, or works of site preparation or clearance, shall take place until details, including plans and cross sections of the existing and proposed ground levels of the development and the boundaries of the site and the height of the ground floor slab and damp proof course in relation thereto, have been submitted to and approved in writing by the Local Planning Authority. The works hereby permitted shall be carried out in accordance with the approved details. Reason: Insufficient information has been supplied with the application to judge the proposed site levels of the proposed development. Submission of a scheme prior to commencement will ensure that the development accords with Policy DC61 of LBH's 'Development Plan Document' 2008 and with Section 197 of the Town and Country Planning Act 1990.
7.No development shall commence until full details of the drainage strategy, drainage layout, together with SUDS information to serve the development have been submitted to and agreed in writing by the Local Planning Authority prior to works commencing on development. The scheme agreed shall be implemented strictly in accordance with such agreement unless subsequent amendments have been agreed with the Local Planning Authority. Reason: To ensure that the development is properly drained in accordance with Policy DC49, DC51 and CP15 of LBH's 'Development Plan Document' 2008 and LBH's SPD on 'Sustainable Design Construction' 2009.
8.No development shall commence until full details of the proposed means of foul and surface water sewage disposal have been submitted to and agreed in writing by the Local Planning Authority. Reason: To ensure that the development is properly drained in accordance with Policy DC49 and Policy 51 and CP15 of LBH's 'Development Plan Document' 2008 and LBH's SPD on 'Sustainable Design Construction' 2009.
9.The layout of this site shall incorporate children's play areas in complete accordance with the approved plans (as amended), full details of a scheme of implementation and phasing to be submitted to before any above ground level works have commenced and agreed in writing by the Local Planning Authority prior to works commencing on development. Any area(s) so provided shall not thereafter be used for any purpose other than recreation for use by residents. Reason: To avoid undue pressure on existing local recreation facilities in accordance with Policy 3.6 from the 'London Plan' 2016.
10.No development above ground shall take place until details of both on-site hard and soft landscape works (in accordance with the illustrative landscape masterplan) have been submitted to and approved in writing by the Local Planning Authority and these works shall be carried out as approved. These details shall include the following, as relevant: - existing and proposed finished levels or contours; - means of enclosure to both the private garden areas and public spaces; - hard surfacing materials; - minor artefacts and structures (eg. street furniture, play equipment, refuse or other storage units, signs, lighting etc); - proposed and existing functional services above and below ground (eg. drainage, power, communications cables, pipelines, intruder alarm boxes, communal aerials, including lines, manholes, supports etc); Soft landscape details shall include the following as relevant: - planting plans; - written specification (including cultivation and other operations associated with plant and grass establishment; - schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate; - retained areas of grassland, hedgerow and trees; - implementation programme; Reason: To improve the appearance of the site in the interests of visual amenity and to ensure the long term retention of soft landscaping including future protection from those in private gardens and public spaces.
11.All hard and soft landscape works shall be carried out in accordance with the approved details. Hard landscaping works shall be completed prior to the occupation of the dwellings. The soft landscaping shall be carried out in the first planting season following the occupation of the building or the completion of the development whichever is the sooner. If within a period of 5 years from the date of planting, any trees, shrubs or plants die, are removed or, in the opinion of the Local Planning Authority, become seriously damaged or defective, others of the same species and size as that originally planted shall be planted at the same place, in the next planting season, unless the Local Planning Authority gives its written consent to any variation. Reason: To improve the appearance of the site in the interests of visual amenity and to ensure the long term retention of soft landscaping including future protection from those in private gardens and public spaces in accordance with Policy DC60 of the LBH's 'Development Plan Document' 2008.
12.Prior to the commencement of any works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority; a) A Phase II (Site Investigation) Report, as the Phase I Report confirms the possibility of a significant risk to any sensitive receptors. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the sites ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors. b) A Phase III (Remediation Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation. A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to all receptors must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and procedure for dealing with previously unidentified any contamination. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. c) Following completion of measures identified in the approved remediation scheme mentioned in 1(c) above, a "Verification Report" that demonstrates the effectiveness of the remediation carried out, any requirement for longer-term monitoring of contaminant linkages, maintenance and arrangements for contingency action, must be produced, and is subject to the approval in writing of the Local Planning Authority. Reason: To protect those engaged in construction and occupation of the development from potential contamination and in order that the development accords with Policy DC53 of the LBH's 'Development Plan Document' 2008.
13.If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until a remediation strategy detailing how this unsuspected contamination shall be dealt with has been submitted to and approved in writing by the local planning authority. The remediation strategy shall be implemented as approved. a) Following completion of the remediation works as mentioned above, a 'Verification Report' must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved. Reason: To ensure that any previously unidentified contamination found at the site is investigated and satisfactorily addressed in order to protect those engaged in construction and occupation of the development from potential contamination.
14.Electric charging points shall be installed in 20% of the allocated parking spaces at the development. The charging points shall be supplied with an independent 32amp radial circuit and must comply with BS7671. Standard 3 pin, 13 amp external sockets will be required. The sockets shall comply with BS1363, and must be provided with a locking weatherproof cover if located externally to the building. Reason: So to protect and exploit opportunities for the use of sustainable transport modes for the movement of goods and people in accordance with guidance under Para's 58 and 69 from the ''NPPF'' 2012.
15.a) Prior to the commencement of the development hereby approved, the developer or contractor must be signed up to the NRMM register. b) The development site must be entered onto the register alongside all the NRMM equipment details. c) The register must be kept up-to-date for the duration of the construction of development. d) It is to be ensured that all NRMM complies with the requirements of the directive. e) An inventory of all NRMM to be kept on-site stating the emission limits for all equipment. Reason: Being a major development in Greater London, but outside the Non-Road Mobile Machinery (NRMM) Central Activity Zone, NRMM used on site must meet Stage IIIA of EU Directive 97/68/EC as a minimum. From 1st September 2020 the minimum requirement for any NRMM used on site within Greater London will rise to Stage IIIB of the Directive.
16.a) Prior to the commencement of the development, a Dust Monitoring Scheme for the duration of the demolition and construction phase of the development hereby approved, shall be submitted for the written approval of the Local Planning Authority. The scheme shall detail: - Determination of existing (baseline) pollution levels; - Type of monitoring to be undertaken; - Number, classification and location of monitors; - Duration of monitoring; - QA/QC Procedures; - Site action levels; and - Reporting method. b) Following the completion of measures identified in the approved Dust Monitoring Scheme, a "Dust Monitoring Report" that demonstrates the effectiveness of the dust monitoring carried out must be produced, and is subject to the approval of the Local Planning Authority. The development shall be carried out in accordance with the approved scheme. Reason: To ensure that the construction activities do not give rise to any exceedances of the national air quality objectives/limit values for PM10 and/or PM2.5, or any exceedances of recognised threshold criteria for dust deposition/soiling.
17.Before development is commenced, a scheme shall be submitted to and approved in writing by the Local Planning Authority making provision for a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers. The Construction Method statement shall include details of: a) parking of vehicles of site personnel and visitors; b) storage of plant and materials; c) measures for minimising the impact of noise and, if appropriate, vibration arising from construction activities; d) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority; e) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities; f) siting and design of temporary buildings; g) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies; h) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded. The development shall be carried out in accordance with the approved scheme and statement. Reason: Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects residential amenity. It will also ensure that the development accords with Policy DC61 of the LBH's 'Development Plan Document' 2008.
18.Before the development hereby permitted is first commenced, vehicle cleansing facilities to prevent mud being deposited onto the public highway during construction works shall be provided on site in accordance with details to be first submitted to and approved in writing by the Local Planning Authority. The approved facilities shall be retained thereafter and used at relevant entrances to the site throughout the duration of construction works. If mud or other debris originating from the site is deposited in the public highway, all on-site operations shall cease until it has been removed. The submission will provide; a) A plan showing where vehicles will be parked within the site to be inspected for mud and debris and cleaned if required. The plan should show where construction traffic will access and exit the site from the public highway. b) A description of how the parking area will be surfaced, drained and cleaned to prevent mud, debris and muddy water being tracked onto the public highway; c) A description of how vehicles will be checked before leaving the site - this applies to the vehicle wheels, the underside of vehicles, mud flaps and wheel arches. d) A description of how vehicles will be cleaned. e) A description of how dirty/ muddy water be dealt with after being washing off the vehicles. f) A description of any contingency plan to be used in the event of a break-down of the wheel washing arrangements. Reason: Insufficient information has been supplied with the application in relation to wheel washing facilities. Submission of details prior to commencement will ensure that the facilities provided prevent materials from the site being deposited on the adjoining public highway, in the interests of highway safety and the amenity of the surrounding area. It will also ensure that the development accords with Policy DC32 and DC61 of the LBH's 'Development Plan Document' 2008.
19.Details of any external lighting of the site shall be submitted to, and approved in writing by the Local Planning Authority prior development above ground level. This information shall include a layout plan with beam orientation and a schedule of equipment in the design (luminaire type, mounting height, aiming angles and luminaire profiles). The lighting shall be installed, maintained and operated in accordance with the approved details unless the Local Planning Authority gives its written consent to the variation. Reason: To protect the appearance of the area, and in order that the development accords with Para's 58 and 69 from the ''NPPF'' 2012; and Policy 7.3 of the 'London Plan' 2016; and Policies CP17 and Policy DC63 of LBH's 'Development Plan Document' 2008; and with LBH's SPD on 'Designing Safer Places' 2010.
20.All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays. Reason: To protect residential amenity, and in order that the development accords with Policy DC55 of LBH's 'Development Plan Document' 2008.
21.All noise mitigation measures in the form of appropriate glazing and ventilation units will need to be incorporated into the scheme and in accordance with the report entitled 'Noise Impact Assessment' Ref: Rev P1 dated 01.06.2017. Any deviation from works prescribed or methods agreed in accordance with the report shall be agreed in writing to the Local Planning Authority. Reason: To protect residential amenity, and in order that the development accords with Policy DC55 of LBH's 'Development Plan Document' 2008.
22.Before any works relating to new plant or machinery commence a scheme for any new plant or machinery shall be submitted to the local planning authority to achieve the following standard. Noise levels expressed as the equivalent continuous sound level LAeq (1 hour) when calculated at the boundary with the nearest noise sensitive premises shall not exceed LA90 -10dB and shall be maintained thereafter to the satisfaction of the Local Planning Authority. Reason: To protect residential amenity, and in order that the development accords with Policy DC55 of LBH's 'Development Plan Document' 2008.
23.Before any above ground development is commenced, surfacing materials for the access road and parking areas shall be submitted to and approved in writing by the Local Planning Authority and thereafter the access road shall be constructed with the approved materials. Once constructed, the access road shall be kept permanently free of any obstruction (with the exception of the car parking spaces shown on the approved plans) to prevent uses of the access road for anything but access. Reason: Insufficient information has been supplied with the application to judge the appropriateness of the surfacing materials. Submission of this detail prior to commencement will ensure that the development accords with Policy DC61 from LBH's 'Development Plan Document' 2008.
24.Prior to the first occupation of any of the relevant residential blocks hereby permitted, a phased scheme outlining the areas set aside for car parking spaces, and laid out and surfaced to the satisfaction of the Local Planning Authority to provide a minimum of 248.No. vehicular parking spaces (inclusive of 30.No. spaces wheelchair accessible standard) shall be submitted. Those areas shall be retained permanently thereafter for the accommodation of vehicles associated with the site. Reason: To ensure that car parking accommodation is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety, and that the development accords with Policy DC32 of LBH's 'Development Plan Document' 2008.
25.Prior to the first occupation of any of the relevant residential blocks hereby permitted, a phased scheme outlining the cycle storage areas shall be provided and laid out and surfaced to the satisfaction of the Local Planning Authority to provide a minimum of 1,031.No. secure cycle parking stores provided for building residents (long stay) exclusive of a minimum of 18.No. cycle parking spaces provided for commercial units and 16.No. cycle parking spaces for visitors (short stay). The safe, secure and accessible areas as marked on the plans shall be retained permanently thereafter for the accommodation of cycle parking spaces associated with the site. Reason: To ensure that cycle parking spaces are made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety, and that the development accords with Policy DC35 of LBH's 'Development Plan Document' 2008.
26.Prior to the first occupation of any of the individual blocks hereby permitted, provision shall be made for the storage of refuse and recycling awaiting collection arising from that block in accordance to details which shall previously have been agreed in writing by the Local Planning Authority. Reason: In the interests of amenity of occupiers of the development and also the visual amenity of the development and the locality generally, and in order that the development accords with Policy DC40 of LBH's 'Development Plan Document' 2008.
27.Prior to carrying out above grade works of each building or part of a building, details shall be submitted to and approved, in writing, by the Local Planning Authority to demonstrate that such building or such part of a building can achieve full 'Secured by Design' accreditation. The development shall only be carried out in accordance with the approved details. Reason: In the interest of community safety and in accordance with the Development Control Policies Development Plan Document Policies DC63 and LBH's SPD on 'Designing Safer Places' (2010) and 'Sustainable Design Construction' (2009).
28.Prior to the first occupation of each building or part of a building or use, a 'Secured by Design' accreditation shall be obtained for such building or part of such building or use. Reason: In the interest of community safety and in accordance with the Development Control Policies Development Plan Document Policies DC63 and LBH's SPD on 'Designing Safer Places' (2010) and 'Sustainable Design Construction' (2009).
29.Any inlet for a fire main shall, where ever possible, be positioned on the face of the building which it serves and be visible from the appliance. Any access point shared with a pedestrian/cycle route shall be capable of supporting a pump appliance with a minimum carrying capacity of 14 tonnes. No part of a proposed access route shall contain a grassed area. Reason: In order to comply with Policy 3.8 of the 'London Plan' 2016 and Policy DC7 of the LBH's 'Development Plan Document' 2008.
30.All dwellings hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency. Reason: In order to comply with Policy 5.15 of the 'London Plan' 2016 and DC51 of the LBH's 'Development Plan Document' 2008.
31.At least 62 of the dwellings hereby approved shall be constructed to comply with Part M4(3)(2)(a) of the Building Regulations - Wheelchair Adaptable Dwellings. The remainder of the dwellings hereby approved shall be constructed to comply with Part M4(2) of the Building Regulations - Accessible and Adaptable Dwellings. Reason: In order to comply with Policy 3.8 of the 'London Plan' 2016 and Policy DC7 of LBH's 'Development Plan Document' 2008.
32.No demolition or development shall take place until a stage 1 written scheme of investigation (WSI) has been submitted to and approved by the local planning authority in writing. For land that is included within the WSI, no demolition or development shall take place other than in accordance with the agreed WSI, and the programme and methodology of site evaluation and the nomination of a competent person(s) or organisation to undertake the agreed works. If heritage assets of archaeological interest are identified by stage 1 then for those parts of the sites which have archaeological interest a stage 2 WSI shall be submitted to and approved by the local planning authority in writing. For land that is included within the stage 2 WSI, no demolition/development shall take place other than in accordance with the agreed stage 2 WSI which shall include: A. The statement of significance and research objectives, the programme and methodology of site investigation and recording and the nomination of a competent person(s) or organisation to undertake the agreed works B. The programme for post-investigation assessment and subsequent analysis, publication & dissemination and deposition of resulting material. This part of the condition shall not be discharged until these elements have been fulfilled in accordance with the programme set out in the stage 2 WSI. Reason: Insufficient information has been supplied with the application in relation to the above matters. The planning authority wishes to secure the provision of archaeological investigation and the subsequent recording of the remains prior to development (including historic buildings recording), in accordance with Policy DC70 of LBH's 'Development Plan Document' 2008.
33.No development above ground shall take place until a scheme for the provision of bat and bird boxes integrated into the built form of new buildings shall be submitted to and approved by the Local Planning Authority. The boxes so approved within each phase of the development shall be completed and available for use before the last dwelling within that phase is occupied. Reason: To ensure that any protected species remain safeguarded, and in accordance with Policy CP15 and Policy CP16 of LBH's 'Development Plan Document' 2008.
34.Works shall be carried out in full accordance with the specific recommendations and mitigation measures set out from the Preliminary Ecological Appraisal dated June 2017, unless otherwise approved in writing by the Local Planning Authority. Reason: In order to secure adequate ecological mitigation and enhancement, including with regards to protected species, and in accordance with Policy CP15 and Policy CP16 from LBH's 'Development Plan Document' 2008.
35.No parts of blocks E1 or E4 shall be constructed until details of internal core running to roof level suitable for fume extraction equipment are submitted and approved by the Local Planning Authority. The building shall be constructed in accordance with the approved details. Before the A1 and A3 uses hereby permitted commences, details of the hours of use, together with a scheme for the mechanical ventilation of the working area (utilising the internal core) and for the filtration of grease and cooking odours shall be submitted to and approved in writing by the Local Planning Authority and thereafter so retained unless further written approval from the Local Planning Authority for an alternative scheme is gained. Details shall include the noise attenuation measures for the ventilation machinery. Reason: To preserve the residential and visual amenities of the locality in accordance with Policy CP17 of LBH's 'Development Plan Document' 2008.
36.Before the D1 use hereby permitted commences, details of the hours of use shall be submitted to and approved in writing by the Local Planning Authority and thereafter so retained unless further written approval from the Local Planning Authority for an alternative scheme is granted. Reason: To preserve the residential and visual amenities of the locality in accordance with Policy CP17 of LBH's 'Development Plan Document' 2008.
37.In the event that the development approved is to be developed in phases and prior to the commencement of a phased development, a Phasing Plan shall be submitted to and approved by the Local Planning Authority. The conditions outlined in this decision notice shall be applied for and approved in accordance with the phasing strategy. Reason: To ensure that the development programme is not unnecessarily prolonged.
38.Statement pursuant to Article 31 of the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2012. The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework In accordance with para 186-187 of the National Planning Policy Framework 2012.
39.A fee is required when submitting details pursuant to the discharge of conditions. In order to comply with the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, (as amended); a fee of £116 per request or £34 where the related permission was for extending or altering a dwellinghouse is needed.
40.Planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted considered and agreed. If new or amended access as required (whether temporary or permanent) there may be a requirement for the diversion or protection of third party utility plant and it is recommended that early involvement with the relevant statutory undertaker takes place. The applicant must contact Engineering Services on 01708 433751 to discuss the scheme and commence the relevant highway approvals process. Please note that unauthorised work on the highway is an offence.
41.The developer (including their representatives and contractors) is advised that planning consent does not discharge the requirements of the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed for any highway works (including temporary works of any nature) required during the construction of the development. Please note that unauthorised works on the highway is an offence.
42.The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a license from the Council. If the developer requires scaffolding, hoarding or mobile cranes to be used on the highway, a license is required and Streetcare should be contacted on 01708 434343 to make the necessary arrangements. Please note that unauthorised works on the highway is an offence.
43.Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required. The contact number is 08000093921 so to ensure that the surface water discharge from the site shall not be detrimental to the existing sewage system. A Trade Effluent Consent will be required for any Effluent discharge other than a 'Domestic Discharge'. Any discharge without this consent is illegal and may result in prosecution. Applications should be made at http://www.thameswater.co.uk/business/9993.htm or alternatively to Waste Water Quality, Crossness STW, Belvedere Road, Abbeywood, London. SE2 9AQ. Telephone: 020 3577 9200. A Groundwater Risk Management Permit from Thames Water will be required for discharging groundwater into a public sewer. Any discharge made without a permit is deemed illegal and may result in prosecution under the provisions of the Water Industry Act 1991. We would expect the developer to demonstrate what measures he will undertake to minimise groundwater discharges into the public sewer. Permit enquiries should be directed to Thames Water's Risk Management Team by telephoning 02035779483 or by emailing wwqriskmanagement@thameswater.co.uk. Application forms should be completed on line via www.thameswater.co.uk/wastewaterquality. With regard to water supply, this comes within the area supplied by the Essex and Suffolk Water Company. For your information the address to write to is -Essex and Suffolk Water Company, Sandon Valley House, Canon Barns Road, East Hanningfield, Essex CM3 8BD Tel - (03457) 820999.
44.The developer is advised that surface water from the development in both its temporary and permanent states should not be discharged onto the highway. Failure to prevent such is an offence.
45.Before occupation of the residential/ commercial unit(s) hereby approved, it is a requirement to have the property/properties officially Street Named and Numbered by our Street Naming and Numbering Team. Official Street Naming and Numbering will ensure that that Council has record of the property/properties so that future occupants can access our services. Registration will also ensure that emergency services, Land Registry and the Royal Mail have accurate address details. Proof of having officially gone through the Street Naming and Numbering process may also be required for the connection of utilities. For further details on how to apply for registration see: https://www.havering.gov.uk/Pages/Services/Street-names-and-numbering.aspx
46.The presence of European protected species, such as bats, is a material consideration in the planning process and the potential impacts that a proposed development may have on them should be considered at all stages of the process. Occasionally European protected species, such as bats, can be found during the course of development even when the site appears unlikely to support them. In the event that this occurs, it is advised that the developer stops work immediately and seeks the advice of the local authority ecologist and/or the relevant statutory nature conservation organisation (e.g. Natural England). Developers should note that it is a criminal offence to deliberately kill, injure or capture bats, or to deliberately disturb them or to damage or destroy their breeding sites and resting places (roosts). Further works may require a licence to proceed and failure to stop may result in prosecution.
47.The applicant's attention is drawn to the provisions of both the Wildlife and Countryside Act 1981, and the Countryside & Rights of Way Act 2000. Under the 2000 Act, it is an offence both to intentionally or recklessly destroy a bat roost, regardless of whether the bat is in the roost at the time of inspection. All trees should therefore be thoroughly checked for the existence of bat roosts prior to any works taking place. If in doubt, the applicant is advised to contact the Bat Conservation Trust at Quadrant House, 250 Kennington Lane, London, SE11 5RD. Their telephone number is 0845 1300 228.
48.The applicant is advised to seek the advice of the Metropolitan Police Services Designing out Crime Officers (DOCOs). The services of the MPS DOCOs are available free of charge and can be contacted via docomailbox.ne@met.police.uk or 02082173813.
49.In aiming to satisfy the condition the applicant should seek the advice of the Metropolitan Police Service Designing out Crime Officers (DOCOs). The services of MPS DOCOs are available free of charge and can be contacted via docomailbox.ne@met.police.uk or 02082173813.
50.A written scheme of investigation will need to be prepared and implemented by a suitably qualified professionally accredited archaeological practice in accordance with Historic England's Guidelines for Archaeological Projects in Greater London. This condition is exempt from deemed discharge under schedule 6 of The Town and Country Planning (Development Management Procedure) (England) Order 2015.
51.The applicant is advised to seek the advice of the Water Regulations Team on 01268664890 as failure to comply with the Water Supply (Water Fittings) Regulations 1999 is an offence which may result in a fine of up to Level 3 on the standard scale, or summary of conviction.
52.The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). Based upon the information supplied with the application, the CIL payable would be an estimated £1,425,580. (this figure may go up or down, subject to indexation). CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website.
53.Regulation 122 of the Community Infrastructure Levy Regulations 2010 (CIL Regs) states that a planning obligation may only constitute a reason for granting planning permission for the development if the obligation is: a. necessary to make the development acceptable in planning terms; b. directly related to the development; and c. fairly and reasonably related in scale and kind to the development.