No.Condition Text
1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.All new external finishes shall be carried out in materials to match those of the existing building(s) to the satisfaction of the Local Planning Authority. Reason:- To safeguard the appearance of the premises and the character of the immediate area, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61.
3.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice). Reason:- The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
4.Before any works commence a scheme for the new plant or machinery shall be submitted to and approved in writing by the Local Planning Authority to achieve the following standard - Noise levels expressed as the equivalent continuous sound level LAeq (1 hour) when calculated at the boundary with the nearest noise sensitive property shall not exceed LA90 -10dB. Plant and machinery shall be maintained thereafter in accordance with the approved scheme. Reason:- Insufficient information has been supplied with the application to assess the noise levels of the plant or machinery to be used on site. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use, will prevent noise nuisance to adjoining properties in accordance with the Development Control Policies Development Plan Document Policies DC55 and DC61.
5.Prior to commencement, suitable equipment to remove and/or disperse odours and odorous material should be fitted to the extract ventilation system in accordance with a scheme to be designed and certified by a competent engineer and after installation a certificate to be lodged with the Planning Authority. Thereafter, the equipment shall be properly maintained and operated within design specifications during normal working hours. Reason:- Insufficient information has been supplied with the application to judge the technical specifications of the extract ventilation system. Submission of this detail prior to commencement of the use will protect the amenity of occupiers of nearby premises and ensure that the development accords with Development Control Policies Development Plan Document Policy DC61
6.Prior to commencement, a scheme to control the transmission of noise and vibration from any mechanical ventilation system installed shall be submitted to and approved in writing by the Local Planning Authority and implemented prior to the permitted use commencing. Thereafter, the scheme shall be implemented, equipment shall be properly maintained and operated during normal working hours. Reason:- Insufficient information has been supplied with the application to judge the technical specifications of the mechanical ventilation system. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use protect the amenity of occupiers of nearby premises, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
7.Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraphs 186-187 of the National Planning Policy Framework 2012.