| No. | Condition Text |
|---|
| 1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
| 2. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 3. | No dwelling unit shall be occupied until the car/vehicle parking area shown on approved drawings 20-001 Revision B and 20-501 Revision C has been completed, and thereafter, the area shall be kept free of obstruction and permanently made available for the parking of vehicles associated with the development and shall not be used for any other purpose.
Reason: To ensure that car parking accommodation is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety and in order that the development accords with the LDF Development Control Policies Development Plan Document Policy DC33. |
| 4. | No works shall take place in relation to any of the development hereby approved until samples of all materials to be used in the external construction of the building(s) are submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials.
Reason:-
Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. Submission of samples prior to commencement will ensure that the appearance of the proposed development will harmonise with the character of the surrounding area and comply with Policy DC61 of the Development Control Policies Development Plan Document. |
| 5. | No works shall take place in relation to any of the development hereby approved until there has been submitted to and approved by the Local Planning Authority a scheme of hard and soft landscaping, which shall include indications of all existing trees and shrubs on the site, and details of any to be retained, together with measures for their protection in the course of development. No development other than the access shall take place until the approved tree and shrub protection measures have been implemented. All development other than the access shall only be carried out in accordance with the approved tree and shrub protection until completion. All planting, seeding or turfing comprised in the approved landscaping scheme shall be carried out in the first planting and seeding season following completion of the development or in accordance with a programme approved in writing by the Local Planning Authority. Any tree or plant which within a period of 5 years from completion of the development dies, are removed or become seriously damaged or diseased shall be replaced in the next planting season with another tree or plant of the same species and size as that originally planted, unless otherwise agreed in writing by the local Planning Authority.
Reason: Insufficient information has been supplied with the application to judge the appropriateness of the hard and soft landscaping proposed. Submission of a scheme prior to commencement will ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. It will also ensure accordance with Section 197 of the Town and Country Planning Act 1990. |
| 6. | Prior to the first occupation of the dwellings hereby permitted, the proposed refuse store shown on drawing No.'s 20-001 Revision B, 20-501 Revision C, 20-510 Revision B, 20-511 Revision B and 20-512 Revision B shall be provided to the satisfaction of the Local Planning Authority.
Reason: In the interests of amenity of occupiers of the development and also the visual amenity of the development and the locality generally, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 7. | No building shall be occupied or use commenced until cycle storage is provided in accordance with details previously submitted to and approved in writing by the Local Planning Authority. The cycle storage shall be permanently retained thereafter.
Reason:-
Insufficient information has been supplied with the application to demonstrate what facilities will be available for cycle parking. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use is in the interests of providing a wide range of facilities for non-motor car residents and sustainability. |
| 8. | Prior to the commencement of the development hereby approved, details of all proposed walls, fences and boundary treatment shall be submitted to, and approved in writing by, the Local Planning Authority. The boundary development shall then be carried out in accordance with the approved details and retained permanently thereafter to the satisfaction of the Local Planning Authority.
Reason:
Insufficient information has been supplied with the application to judge the appropriateness of any boundary treatment. Submission of this detail prior to commencement will protect the visual amenities of the development, prevent undue overlooking of adjoining property and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 9. | No works shall take place in relation to any of the development hereby approved until a full and detailed application for the Secured by Design award scheme is submitted to the Local Planning Authority, setting out how the principles and practices of the Secured by Design Scheme are to be incorporated. Once approved in writing by the Local Planning Authority in consultation with the Metropolitan Police Designing Out Crime Officers, the development shall be carried out in accordance with the agreed details.
Reason:-
Insufficient information has been supplied with the application to judge whether the proposals meet Secured by Design standards. Submission of a full and detailed application prior to commencement is in the interest of creating safer, sustainable communities and to reflect guidance in Policies CP17 and DC63 of the Core Strategy and Development Control Policies Development Plan Document and the NPPF. |
| 10. | No building shall be occupied or use commenced until external lighting is provided in accordance with details previously submitted to and approved in writing by the Local Planning Authority. The lighting shall be provided and operated in strict accordance with the approved scheme.
Reason:-
Insufficient information has been supplied with the application to judge the impact arising from any external lighting required in connection with the building or use. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use will protect residential amenity and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 11. | All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays.
Reason:-
To protect residential amenity, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 12. | Before the development hereby permitted is first commenced, vehicle cleansing facilities to prevent mud being deposited onto the public highway during construction works shall be provided on site in accordance with details to be first submitted to and approved in writing by the Local Planning Authority. The approved facilities shall be retained thereafter and used at relevant entrances to the site throughout the duration of construction works. If mud or other debris originating from the site is deposited in the public highway, all on-site operations shall cease until it has been removed.
The submission will provide;
a) A plan showing where vehicles will be parked within the site to be inspected for mud and debris and cleaned if required. The plan should show where construction traffic will access and exit the site from the public highway.
b) A description of how the parking area will be surfaced, drained and cleaned to prevent mud, debris and muddy water being tracked onto the public highway;
c) A description of how vehicles will be checked before leaving the site - this applies to the vehicle wheels, the underside of vehicles, mud flaps and wheel arches.
d) A description of how vehicles will be cleaned.
e) A description of how dirty/ muddy water be dealt with after being washing off the vehicles.
f) A description of any contingency plan to be used in the event of a break-down of the wheel washing arrangements.
Reason:-
Insufficient information has been supplied with the application in relation to wheel washing facilities. Submission of details prior to commencement will ensure that the facilities provided prevent materials from the site being deposited on the adjoining public highway, in the interests of highway safety and the amenity of the surrounding area. It will also ensure that the development accords with the Development Control Policies Development Plan Document Policies DC32 and DC61. |
| 13. | No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of:
a) parking of vehicles of site personnel and visitors;
b) storage of plant and materials;
c) dust management controls;
d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities;
e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority;
f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities;
g) siting and design of temporary buildings;
h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies;
i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded.
And the development shall be carried out in accordance with the approved scheme and statement.
Reason:-
Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects residential amenity. It will also ensure that the development accords the Development Control Policies Development Plan Document Policy DC61. |
| 14. | All necessary agreement, notice or licence to enable the proposed alterations to the Public Highway shall be entered into prior to the commencement of development.
Reason: It is essential to ensure that all permissions are in place before commencing on site. This is to ensure the interests of the travelling public are maintained and to comply with policies of the Core Strategy and Development Control Policies, namely CP10, CP17 and DC61. |
| 15. | The proposals should provide a 2.1 by 2.1 metre pedestrian visibility splay on either side of the proposed access, set back to the boundary of the public footway. There should be no obstruction or object higher than 0.6 metres within the visibility splay.
Reason:-
In the interests of highway safety, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC32. |
| 16. | (1) - Prior to the commencement of any works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority;
b) A Phase II (Site Investigation) Report if the Phase I Report confirms the possibility of a significant risk to any sensitive receptors. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the sites ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors.
c) A Phase III (Remediation Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation. A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to all receptors must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and procedure for dealing with previously unidentified any contamination. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
d) Following completion of measures identified in the approved remediation scheme mentioned in 1(c) above, a "Verification Report" that demonstrates the effectiveness of the remediation carried out, any requirement for longer-term monitoring of contaminant linkages, maintenance and arrangements for contingency action, must be produced, and is subject to the approval in writing of the Local Planning Authority.
Reason: To protect those engaged in construction and occupation of the development from potential contamination and in order that the development accords with Development Control Policies Development Plan Document Policy DC53. |
| 17. | (2) - a) If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until a remediation strategy detailing how this unsuspected contamination shall be dealt with has been submitted to and approved in writing by the local planning authority. The remediation strategy shall be implemented as approved.
b) Following completion of the remediation works as mentioned in (a) above, a 'Verification Report' must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved.
Reason: To ensure that any previously unidentified contamination found at the site is investigated and satisfactorily addressed in order to protect those engaged in construction and occupation of the development from potential contamination. |
| 18. | None of the residential units hereby permitted shall be occupied until provision has been made for 20% of the parking spaces within the development to be served by electric vehicle charging points, with the potential for this to be expanded by a further 20%.
Reason: Insufficient information has been supplied with the application to demonstrate what level of provision is to be made for electric vehicle charging points. Provision prior to occupation will ensure that the development adequately incorporates measures to allow the use of electric vehicles by future occupiers in accordance with policy 6.13 of the London Plan. |
| 19. | The renewable energy system for the development shall be installed in accordance with details previously submitted to and agreed in writing by the Local Planning Authority and shall be made operational prior to the residential occupation of the development. Thereafter, it shall be permanently retained.
Reason: In the interests of energy efficiency and sustainability in accordance
with Policy DC50 of the LDF Development Control Policies Development Plan
Document. |
| 20. | At least two of the dwellings hereby approved shall be constructed to comply with Part M4(3)(2)(a) of the Building Regulations - Wheelchair User Dwellings. The remainder of the dwellings hereby approved shall be constructed to comply with Part M4(2) of the Building Regulations - Accessible and Adaptable Dwellings. All of the dwellings hereby approved shall be constructed to comply with Part M4(3)(2)(a) of the Building Regulations - Wheelchair User Dwellings.
Reason: In order to comply with Policy DC7 of the Local Development Framework and Policy 3.8 of the London Plan. |
| 21. | Prior to the commencement of any development an assessment shall be undertaken of the impact of road noise emanating from Straight Road/Faringdon Avenue upon the development in accordance with the methodology contained in the Department of Transport/Welsh office memorandum, "Calculation of Road Traffic Noise", 1988. Reference should be made to the good standard to be found in the World Health Organisation Document number 12 relating to community noise and BS8233:1999. Following this, a scheme detailing measures, which are to protect occupants from road traffic noise shall be submitted to, and approved in writing by the Local Planning Authority and shall be implemented prior to occupation.
Reason: Insufficient information has been supplied with the application to assess the impact of road noise. Submission of this detail prior to occupation in the case of new building works will prevent noise nuisance to adjoining properties in accordance with the Development Control Policies Development Plan Document Policies DC55 and DC61. |
| 22. | Prior to the commencement of the development hereby approved, an Air Quality Assessment shall be submitted to and agreed by the Local Planning Authority. The assessment shall include details of:
a. the proposed development;
b. the basis for determining significance of effects arising from the impacts;
c. the assessment methods, including the model, input data and assumptions;
d. model verification;
e. model of the baseline conditions (existing and future without development);
f. model of the future impacts (with the development;
g. dust risk assessment for the demolition, earthworks, construction and trackout phases of the development;
h. impact assessment;
i. mitigation measures, including identification / model of their impact;
j. measures that will be implemented (or continue to be implemented) after development is completed to protect both the internal air quality of buildings and to ensure that there is no adverse impact on air quality in the vicinity of the development.
The use hereby permitted shall not commence until all measures identified in the Air Quality Assessment have been shown to be implemented to the satisfaction of the Local Planning Authority. For further guidance see: EPUK & IAQM 'Land-Use Planning & Development Control: Planning for Air Quality', published January 2017 and the Mayor of London Supplementary Planning Guidance 'The Control of Dust and Emissions from Construction and Demolition.
Reason: Insufficient information has been supplied with the application to assess air quality. Submission of this detail prior to occupation in the case of new building works will protect the health of future occupants, neighbours, those engaged in construction, and to comply with the national air quality objectives within the designated Air Quality Management Area in accordance with the Development Control Policies Development Plan Document Policies CP15 and DC52. |
| 23. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no window or other opening (other than those shown on the submitted and approved plan,) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority.
Reason:-
In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 24. | All dwellings hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency.
Reason: In order to comply with Policy 5.15 of the London Plan. |
| 25. | The second floor flat adjacent to the southern boundary of the site annotated as 2_03 on Drawing No. 20-503 Revision B shall not be occupied until details of a brick boundary wall to the southern flank wall of this balcony have been submitted to and agreed in writing by the Local Planning Authority. The brick boundary wall shall be provided in accordance with the approved details and retained in position for the lifetime of the development.
Reason: Insufficient information has been supplied with the application to demonstrate how the potential for overlooking of rear garden areas of adjoining properties would be adequately mitigated. The agreement and implementation of appropriate level of screening prior to occupation is considered necessary in the interests of privacy, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 26. | The proposed first floor flank window serving the rear bedroom of the flat adjacent to the southern boundary of the site annotated as 1_03 hereby approved as shown on Drawing No.'s 20-502 Revision B and 20-513 Revision B shall be permanently glass with obscure glass not less than level 4 on the standard scale of obscurity and shall thereafter be maintained and permanently fixed shut.
Reason: In the interests of privacy, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 27. | The flat roofed areas of the building hereby permitted shall not be used as a balcony, roof garden or similar amenity area without the grant of further specific permission from the Local Planning Authority.
Reason: In the interests of the amenity of the occupiers of neighbouring dwelling, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
| 28. | Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraphs 186-187 of the National Planning Policy Framework 2012. |
| 29. | The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). Based upon the information supplied with the application, the CIL payable would be £29,300. (this figure may go up or down, subject to indexation). CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website. |
| 30. | Changes to the public highway (including permanent or temporary access)
- Planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted considered and agreed. If new or amended access is required (whether temporary or permanent), there may be a requirement for the diversion or protection of third party utility plant or highway authority assets and it is recommended that early involvement with the relevant statutory undertaker takes place. The applicant must contact Engineering Services on 01708 433751 to discuss the scheme and commence the relevant highway approvals process. Please note that unauthorised work on the highway is an offence.
Highway legislation
- The developer (including their representatives and contractors) is advised that planning consent does not discharge the requirements of the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed for any highway works (including temporary works of any nature) required during the construction of the development. Please note that unauthorised work on the highway is an offence.
Temporary use of the public highway
- The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a licence from the Council. If the developer required scaffolding, hoarding or mobile cranes to be used on the highway, a licence is required and Street Management should be contacted to make the necessary arrangements. Please note that unauthorised use of the highway for construction works is an offence.
Surface water management
- The developer is advised that surface water from the development in both its temporary and permanent states should not be discharged onto the highway. Failure to prevent such is an offence. |
| 31. | A fee is required when submitting details pursuant to the discharge of conditions. In order to comply with the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, (as amended), a fee of £116 per request or £34 where the related permission was for extending or altering a dwellinghouse, is needed. |
| 32. | The planning obligations recommended in this report have been subject to the statutory tests set out in Regulation 122 of the Community Infrastructure Levy Regulations 2010 and the obligations are considered to have satisfied the following criteria:-
(a) Necessary to make the development acceptable in planning terms;
(b) Directly related to the development; and
(c) Fairly and reasonably related in scale and kind to the development. |
| 33. | Before occupation of the residential/ commercial unit(s) hereby approved, it is a requirement to have the property/properties officially Street Named and Numbered by our Street Naming and Numbering Team. Official Street Naming and Numbering will ensure that that Council has record of the property/properties so that future occupants can access our services. Registration will also ensure that emergency services, Land Registry and the Royal Mail have accurate address details. Proof of having officially gone through the Street Naming and Numbering process may also be required for the connection of utilities. For further details on how to apply for registration see:
https://www.havering.gov.uk/Pages/Services/Street-names-and-numbering.aspx |
| 34. | In promoting the delivery of safer, stronger, sustainable places the Local Planning Authority fully supports the adoption of the principles and practices of the Secured by Design Award Scheme and Designing against Crime. Your attention is drawn to the free professional service provided by the Metropolitan Police Designing Out Crime Officers for North East London, whose can be contacted via DOCOMailbox.NE@met.police.uk or 0208 217 3813 . They are able to provide qualified advice on incorporating crime prevention measures into new developments. |
| 35. | The applicant is advised to follow the guidelines below:
· ADMS-Roads output files need to be provided to the Council on validation of the planning application.
· AQ modelling need to be based on transport related inputs which have been approved by the Council's Transport Assessment team.
It is essential that junctions and heavily congested roads are modelled accurately and this is reflected in the choice of relevant node spacing and vehicle speed inputs, which are representative of congestion. Where under predictions occur nodes should be scrutinised and where necessary vehicle speeds adjusted to reflect queuing.
· It is the responsibility of the applicant to ensure that their appointed consultants' modelling verification is robust and adjustment factors clearly explained and justified, calculations and graphs should be provided at validation.
· Margin of error should not exceed 4 (refer to LAQM guidance as best practice).
· Contrary to the values given in the EPUK guidance a magnitude of change greater than 0.5 µg/m3 is considered significant in areas where present concentrations are near to or breeching limit values and shall be assessed as such. Such changes do not contribute towards EU limit values (NPPF paragraph 124).
· Any other scenarios should be considered which are relevant to this site.
· (Heathrow Met Data is not acceptable) The meteorological data need to be representative of the conditions in the vicinity of the proposed development.
· If there is insufficient monitoring data of the proposed development area, a minimum of 6 months diffusion tube monitoring should be conducted to inform the Air Quality Assessment. Locations should be agreed with the Council's Environmental Protection officers before monitoring commences.
· A written assessment of air quality for major developments is not acceptable; all assessments should include dispersion modelling of present and future air quality with & without the development.
· A cumulative assessment of major committed developments in the area must be incorporated into the modelling.
· For further guidance please see: EPUK & IAQM 'Land-Use Planning & Development Control: Planning for Air Quality', published January 2017 and the Mayor of London Supplementary Planning Guidance 'The Control of Dust and Emissions from Construction and Demolition. |