No.Condition Text
1.The development hereby permitted shall begin no later than three years from the date of this decision. Reason To comply with the requirements of Section 91 of the Town and Country Planning Act 1990
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the following approved plans: A00, A01, A02, A03, A04, A05 (dated 28/11/2025). Reason For the avoidance of doubt and to ensure that the development is carried out as approved and is compliant with development plan policy.
3.Before the development hereby approved is occupied the materials used on the external surfaces of the development must match those used on the external surfaces of the existing property. This applies unless differences are show on the drawings hereby approved or are required by other conditions on this permission. Reason To ensure the development is carried out in accordance with the consent sought, has an acceptable design and complies with policy 26 of the Havering Local Plan (2021)
4.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, nor any Statutory Instrument which amends, removes or replaces that Order, no window or other opening (other than those shown on the submitted and approved plans) shall be formed in the flank walls of the development hereby permitted without the receipt of a specific planning permission for it from the London Planning Authority. Reason To protect the amenities of neighbouring occupiers and ensure the development complies with policy 7 of the Havering Local Plan (2021)
5.The ground floor window inserted on the north elevation serving the w/c shall be obscure-glazed, and non-opening unless the parts of the window which can be opened are more than 1.7m above the floor of the room in which the window is installed. Reason - In the interest of privacy and to protect the amenity of the adjacent neighbours
6.[U]Positive and Proactive Statement[] The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material planning considerations, including planning policies and any representations which were received. It subsequently determined to grant planning permission in accordance with the National Planning Policy requirement that applications for sustainable development are approved where possible. A detailed analysis of the scheme is set out in the report on the application prepared by officers.
7.[U]Building Regulations[] You are reminded that this decision notice only addresses requirements under Planning Legislation. You also need to check that whether or not the development requires consent under the Building Regulations, as this is an entirely separate process. Further information on the requirements of the Building Regulations can be found at: https://www.havering.gov.uk/building control.
8.Changes to the public highway (including permanent or temporary access) - Planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted considered and agreed. If new or amended access is required (whether temporary or permanent), there may be a requirement for the diversion or protection of third party utility plant or highway authority assets and it is recommended that early involvement with the relevant statutory undertaker takes place. The applicant should email environmentbusinesssupport@havering.gov.uk for further information. Please note that unauthorised work on the highway is an offence. Highway legislation - The developer (including their representatives and contractors) is advised that planning consent does not discharge the requirements of the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed for any highway works (including temporary works of any nature) required during the construction of the development. Please note that unauthorised work on the highway is an offence. Temporary use of the public highway - The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a licence from the Council. If the developer required scaffolding, hoarding or mobile cranes to be used on the highway, a licence is required and Street Management should be contacted to make the necessary arrangements. Please note that unauthorised use of the highway for construction works is an offence. Surface water management - The developer is advised that surface water from the development in both its temporary and permanent states should not be discharged onto the highway. Failure to prevent such is an offence.
9.Statement Required by Article 35(2) of the Town and Country Planning (Development Management) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraph 38 of the National Planning Policy Framework.
10.Whilst it would appear from the application that the proposed development is to be entirely within the curtilage of the dwelling, care should be taken upon the commencement and during the course of building operations to ensure that no part of the development, including the foundations and roof overhang, encroaches on, under or over adjoining property. It should be noted that this permission relates solely to works included within the application site.
11.[U]Party Wall Act[] You are reminded that this decision notice only addresses requirements under Planning Legislation. You also need to check whether or not the development necessitates an agreement under the requirements of the Party Wall etc. Act 1996, as this is an entirely separate process. Further guidance on the Party Wall etc. Act 1996 can be found at: https;//www,gov.uk/housing-local-and-community/party-walls.