| No. | Condition Text |
|---|
| 1. | The development hereby permitted shall begin no later than three years from the date of this decision.
Reason: To comply with the requirements of Section 91 of the Town and Country Planning Act 1990. |
| 2. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the following approved plans: PLN 01/02, PLN 02/02 and Location Plan.
Reason: For the avoidance of doubt and to ensure that the development is carried out as approved and is compliant with development plan policy. |
| 3. | The proposed development hereby approved shall be constructed in accordance with the materials detailed on the drawing PLN 02/02 unless otherwise agreed in writing by the Local Planning Authority.
Reason: To ensure that the appearance of the proposed development will harmonise with the character of the surrounding area. |
| 4. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, nor any Statutory Instrument which amends, removes or replaces that Order, no window or other opening (other than those shown on the submitted and approved plans) shall be formed in the flank walls of the development hereby permitted without the receipt of a specific planning permission for it from the London Planning Authority.
Reason: To protect the amenities of neighbouring occupiers and ensure the development complies with policy 7 of the Havering Local Plan (2021). |
| 5. | The garden area shall not be subdivided at any time and nor shall there be any additional pedestrian or vehicular accesses into the site.
Reason:-
In order that the annex approved remains ancillary to the main dwelling. |
| 6. | Any residential occupation of the building hereby approved shall be limited to family members of the family occupying the main house at 56 Norwood Avenue, Romford for residential purposes and shall not be occupied by any other persons.
Reason:-
In order that the annex approved remains ancillary to the main dwelling. |
| 7. | The annex hereby permitted shall not be arranged or disposed of as a separate unit of residential accommodation from the use of the main dwelling.
Reason:-
In order that the annex approved remains ancillary to the main dwelling. |
| 8. | 1)Prior to the commencement of any works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority;
a) Phase I (Desktop Study) Report documenting the history of the site, its surrounding area and the likelihood of contaminant/s, their type and extent incorporating a Site Conceptual Model.
b) A Phase II (Site Investigation) Report if the Phase I Report confirms the possibility of a significant risk to any sensitive receptors. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the sites ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors.
c) A Phase III (Remediation Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation. A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to all receptors must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and procedure for dealing with previously unidentified any contamination. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
d) Following completion of measures identified in the approved remediation scheme mentioned in 1(c) above, a "Verification Report" that demonstrates the effectiveness of the remediation carried out, any requirement for longer-term monitoring of contaminant linkages, maintenance and arrangements for contingency action, must be produced, and is subject to the approval in writing of the Local Planning Authority.
Reason: To protect those engaged in construction and occupation of the development from potential contamination.
2) a) If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until a remediation strategy detailing how this unsuspected contamination shall be dealt with has been submitted to and approved in writing by the local planning authority. The remediation strategy shall be implemented as approved.
B) Following completion of the remediation works as mentioned in (a) above, a 'Verification Report' must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved.
Reason: To ensure that any previously unidentified contamination found at the site is investigated and satisfactorily addressed in order to protect those engaged in construction and occupation of the development from potential contamination. |
| 9. | You are reminded that this decision notice only addresses requirements under Planning Legislation. You also need to check that whether or not the development requires consent under the Building Regulations, as this is an entirely separate process. Further information on the requirements of the Building Regulations can be found at: https://www.havering.gov.uk/building control. |
| 10. | You are reminded that this decision notice only addresses requirements under Planning Legislation. It does not give consent for an permanent or temporary changes to the public highway, the use of the public highway for the storage of materials or placing of apparatus associated with the construction or other processes, nor does it permit the discharge of surface water onto the public highway. You are encouraged to check whether or not works or activities necessitate separate consents under the requirements of other, non-planning legislation at the earliest opportunity by emailing environmentbusinesssupport@havering.gov.uk for further information. Unauthorised work on or use of the public highway and a failure to prevent the discharge of surface water on to the public highway area all an offence. |
| 11. | You are reminded that this decision notice only addresses requirements under Planning Legislation. You also need to check whether or not the development necessitates an agreement under the requirements of the Party Wall etc. Act 1996, as this is an entirely separate process. Further guidance on the Party Wall etc. Act 1996 can be found at: https;//www,gov.uk/housing-local-and-community/party-walls. |
| 12. | The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material planning considerations, including planning policies and any representations which were received. It subsequently determined to grant planning permission in accordance with the National Planning Policy requirement that applications for sustainable development are approved where possible. A detailed analysis of the scheme is set out in the report on the application prepared by officers. |