| No. | Condition Text |
|---|
| 1. | The development hereby permitted shall begin no later than three years from the date of this decision.
Reason
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990. |
| 2. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the following approved plans:
893-200-001B, 893-200-002D, 893-200-003B, 893-200-010A, 893-200-X01C, 893-200-X10B.
Reason
For the avoidance of doubt and to ensure that the development is carried out as approved and is compliant with development plan policy. |
| 3. | The proposed development hereby approved shall be constructed in accordance with the materials detailed under Materials Section of the application form and approved plans unless otherwise agreed in writing by the Local Planning Authority.
Reason
To ensure the development is carried out in accordance with the consent sought, has an acceptable design and complies with policy 26 of the Havering Local Plan (2021) |
| 4. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 the existing garage conversion into habitable room (southeast) hereby permitted shall be used only for purposes incidental to the enjoyment of the dwelling house no. 3 Mendoza Close and not for any trade or business nor as living accommodation.
Reason:-
To restrict the use to one compatible with a residential area. |
| 5. | Any windows located in a wall or roof slope forming a side elevation of the development hereby approved shall only be glazed in obscure glass, with the glass to be obscure to at leave Level 4 on the Pilkington Levels of Privacy, and fixed shut, except for any top hung fan light, which shall be a minimum of 1.7metres above internal finished floor level prior to the first use or occupation of the development hereby permitted and the development shall be retained as such thereafter in perpetuity. In the case of multiple or double-glazed units at least one layer of glass in the relevant units shall be glazed in obscure glass to at leave Level 4 on the Pilkington scale.
Reason
To protect the amenities of neighbouring occupiers and ensure the development complies to policy 7 of the Havering Local Plan (2021) |
| 6. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, nor any Statutory Instrument which amends, removes or replaces that Order, no window or other opening (other than those shown on the submitted and approved plans) shall be formed in the flank walls of the development hereby permitted without the receipt of a specific planning permission for it from the London Planning Authority.
Reason
To protect the amenities of neighbouring occupiers and ensure the development complies with policy 7 of the Havering Local Plan (2021) |
| 7. | The hard surface hereby approved (including any sub-base) shall be made of porous materials or provision shall be made to direct run-off water from the hard surface to a permeable or porous area or surface within the curtilage of the dwellinghouse.
Reason:-
In order to ensure no water run-off from the hard surface which would contribute to risk of flooding |
| 8. | Positive and Proactive Statement
The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material planning considerations, including planning policies and any representations which were received. It subsequently determined to grant planning permission in accordance with the National Planning Policy requirement that applications for sustainable development are approved where possible. A detailed analysis of the scheme is set out in the report on the application prepared by officers. |
| 9. | Building Regulations
You are reminded that this decision notice only addresses requirements under Planning Legislation. You also need to check that whether or not the development requires consent under the Building Regulations, as this is an entirely separate process. Further information on the requirements of the Building Regulations can be found at: https://www.havering.gov.uk/building control. |
| 10. | With regards to surface water drainage it is the responsibility of the developer to make proper provision for drainage to ground, water courses or a suitable sewer. In respect of surface water it is recommended that the applicant should ensure that storm flows are attenuated or regulated into the receiving public network through on or off site storage. When it is proposed to connect to a combined public sewer, the site drainage should be separate and combined at the final manhole nearest the boundary. Connections are not permitted for the removal of Ground Water. Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required. They can be contacted on 0845 850 2777. |
| 11. | Changes to the public highway (including permanent or temporary access)
- Planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted considered and agreed. If new or amended access is required (whether temporary or permanent), there may be a requirement for the diversion or protection of third party utility plant or highway authority assets and it is recommended that early involvement with the relevant statutory undertaker takes place. The applicant should email environmentbusinesssupport@havering.gov.uk for further information. Please note that unauthorised work on the highway is an offence.
Highway legislation
- The developer (including their representatives and contractors) is advised that planning consent does not discharge the requirements of the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed for any highway works (including temporary works of any nature) required during the construction of the development. Please note that unauthorised work on the highway is an offence.
Temporary use of the public highway
- The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a licence from the Council. If the developer required scaffolding, hoarding or mobile cranes to be used on the highway, a licence is required and Street Management should be contacted to make the necessary arrangements. Please note that unauthorised use of the highway for construction works is an offence.
Surface water management
- The developer is advised that surface water from the development in both its temporary and permanent states should not be discharged onto the highway. Failure to prevent such is an offence. |
| 12. | Highways Matters
You are reminded that this decision notice only addresses requirements under Planning Legislation. It does not give consent for an permanent or temporary changes to the public highway, the use of the public highway for the storage of materials or placing of apparatus associated with the construction or other processes, nor does it permit the discharge of surface water onto the public highway. You are encouraged to check whether or not works or activities necessitate separate consents under the requirements of other, non-planning legislation at the earliest opportunity by emailing environmentbusinesssupport@havering.gov.uk for further information. Unauthorised work on or use of the public highway and a failure to prevent the discharge of surface water on to the public highway area all an offence. |
| 13. | Party Wall Act
You are reminded that this decision notice only addresses requirements under Planning Legislation. You also need to check whether or not the development necessitates an agreement under the requirements of the Party Wall etc. Act 1996, as this is an entirely separate process. Further guidance on the Party Wall etc. Act 1996 can be found at: https;//www,gov.uk/housing-local-and-community/party-walls. |
| 14. | The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). The Mayoral CIL levy rate for Havering is £25/m² and is chargeable for each additional square metre of residential gross internal floor (GIA). Based upon the information supplied with the application, £3,425.00 would be payable due to result in additional residential floor space with 137m² of GIA, however this may be adjusted subject to indexation.
The proposal is also liable for Havering Council's CIL. Havering's CIL charging rate for residential is £125m² (Zone A) for each additional square metre of GIA. Based upon the information supplied with the application, £17,125.00 would be payable, subject to indexation.
Total = £20,550.00
These charges are levied under s.206 of the Planning Act 2008. CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website. You are also advised to visit the planning portal website where you can download the appropriate document templates at http://www.planningportal.gov.uk/planning/applications/howtoapply/whattosubmit/cil |