No.Condition Text
1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice). Reason:- For the avoidance of doubt and to ensure that the development is carried out as approved.
3.No above ground works shall take place in relation to the development hereby approved until samples of all materials to be used in the external construction of the buildings are submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials. Reason:- Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. Submission of samples prior to commencement will ensure that the appearance of the proposed development will harmonise with the character of the surrounding area.
4.No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of: a) The site access point(s) of all vehicles to the site during the construction phase b) Parking of vehicles of site personnel and visitors; c) Storage of plant and materials; d) Wheel washing facilities. e) Measures to monitor and control the emission of dust and dirt during construction. f) Measures for minimising the impact of noise and, if appropriate, vibration arising from construction activities; g) Predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority; h) A scheme for monitoring noise and, if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authority; j) Siting and design of temporary buildings if required; k) Scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies; l) Details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically prohibited. And the development shall be carried out in accordance with the approved scheme and statement. Reason: Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects residential amenity. It will also ensure that the development accords with Local Plan policy 23, 24 and 34 and London Plan (2021) Policy T7.
5.No above ground works shall take place in relation to the development hereby approved until there has been submitted to and approved by the Local Planning Authority a scheme of hard and soft landscaping, which shall include indications of all existing trees and shrubs on the site, and details of any to be retained, together with measures for the protection in the course of development. All planting, seeding or turfing comprised within the scheme shall be carried out in the first planting season following completion of the development and any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority. Any landscaping should not project higher than 0.6 metres within the visibility splay detailed on the drawing no. L04 J. Reason:- Insufficient information has been supplied with the application to judge the appropriateness of the hard and soft landscaping proposed. Submission of a scheme prior to commencement will ensure that the development achieves a satisfactory level of landscape quality.
6.Prior to the first occupation of the development hereby approved, the boundary development shown on the drawing 'L01 H' submitted as part of the application shall be carried out in accordance with the approved details and retained permanently to the satisfaction of the Local Planning Authority. Reason: To protect the visual amenities of the development and prevent undue overlooking of adjoining properties.
7.Aside from the window serving Bedroom 1 of Flat 3, all the proposed flank windows of the development hereby approved shall be permanently glazed with obscure glass not less than level 3 on the standard scale of obscurity and shall thereafter be maintained and also be non-opening unless the parts of the windows which can be opened are more than 1.8 metres above the floor of the rooms in which the windows are installed. Reason:- In the interests of privacy.
8.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no window or other opening (other than those shown on the submitted and approved plan,) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority. Reason:- In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future.
9.Prior to first occupation, refuse and recycling facilities shall be provided in accordance with details shown on the submitted and approved plans. The refuse and recycling facilities shall be permanently retained thereafter. Reason:- To protect the amenity of occupiers of the development and also the locality generally.
10.Prior to first occupation, cycling storage facilities in association with the proposed development shall be implemented in accordance with the details shown on the submitted and approved plans. The cycle storage facilities shall be permanently retained thereafter. Reason:- In the interests of providing a wide range of facilities for non-motor car residents and sustainability.
11.No piling shall take place until a piling method statement (detailing the depth and type of piling to be undertaken and the methodology by which such piling will be carried out, including measures to prevent and minimise the potential for damage to subsurface sewerage infrastructure, and the programme for the works) has been submitted to and approved in writing by the local planning authority in consultation with Thames Water. Reason:- The proposed works will be in close proximity to underground sewerage utility infrastructure. Piling has the potential to significantly impact/cause failure of local underground sewerage utility infrastructure.
12.Prior to the first occupation of the building hereby approved, the area set aside for car parking shall be laid out and surfaced to the satisfaction of the Local Planning Authority and retained permanently thereafter for the accommodation of vehicles visiting the site and shall not be used for any other purpose. Reason:- To ensure that car parking accommodation is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety.
13.All hard surfaces hereby approved as part of the development (including any sub-base) shall be made of porous materials or provision shall be made to direct run-off water from the hard surface to a permeable or porous area or surface within the curtilage of the application site. Reason:- In order to ensure no water run-off from the hard surface which would contribute to risk of flooding.
14.The proposals shall maintain a pedestrian visibility splay on either side of the proposed access, in accordance with the details set out on drawing no. L04 J. There should be no obstruction or object higher than 0.6 metres, including landscaping, within the visibility splay. Reason:- In the interests of highway safety.
15.All off street residential car parking spaces must provide infrastructure for electric or Ultra-Low Emission vehicles. At least 2 spaces shall have active charging facilities, with passive provision for all remaining spaces. Reason:- To minimise the impact of transport emissions on local air quality.
16.No demolition or construction works, or deliveries, into the site shall take place other than between the hours of 08.00 to 18.00 on Monday to Friday and 08.00 to 13.00 hours on Saturdays unless agreed in writing with the local planning authority. No demolition or construction works, or deliveries shall take place on Sundays, Bank or Public Holidays unless otherwise agreed in writing by the local planning authority. Reason: To protect residential amenity.
17.(1) Prior to the commencement of any above ground works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority; a) A Phase II (Site Investigation) Report given the Phase I Report submitted confirmed the possibility of a significant risk to any sensitive receptors. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the sites ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors. b) A Phase III (Remediation Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation. A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to all receptors must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and procedure for dealing with previously unidentified any contamination. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. c) Following completion of measures identified in the approved remediation scheme mentioned in 1(c) above, a "Verification Report" that demonstrates the effectiveness of the remediation carried out, any requirement for longer-term monitoring of contaminant linkages, maintenance and arrangements for contingency action, must be produced, and is subject to the approval in writing of the Local Planning Authority. Reason: To protect those engaged in construction and occupation of the development from potential contamination. (2) a) If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until a remediation strategy detailing how this unsuspected contamination shall be dealt with has been submitted to and approved in writing by the local planning authority. The remediation strategy shall be implemented as approved. b) Following completion of the remediation works as mentioned in (a) above, a 'Verification Report' must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved. Reason: To ensure that any previously unidentified contamination found at the site is investigated and satisfactorily addressed in order to protect those engaged in construction and occupation of the development from potential contamination.
18.Before the proposed development is first occupied, a scheme to control the transmission of noise and vibration from any mechanical ventilation system installed shall be submitted to and approved in writing by the Local Planning Authority and implemented prior to the permitted use commencing. Thereafter, the equipment shall be properly maintained and operated during normal working hours. Reason: To protect the amenity of noise sensitive premises from noise and vibration from mechanical plant
19.No above ground works shall take place in relation to the development hereby approved until a noise attenuation scheme has been submitted to and approved in writing by the local planning authority. The scheme shall detail the acoustic/noise insulation performance of the external building envelope of the residential units (having regard to the building fabric, glazing and ventilation) and other mitigation to reduce the level of noise experienced internally at the proposed residential units as a result of high ambient noise levels in the area. The approved scheme shall be fully implemented prior to occupation of the residential units. Reason: To protect the amenity of residential properties
20.No above ground works shall take place in relation to the development hereby approved until an assessment has been undertaken of the impact of noise emanating from Ardleigh Green Road upon the development. Reference should be made to the "good" standard to be found in the World Health Organisation Guidelines for Community Noise 1999 and BS8233:2014 Guidance on Sound Insulation and Noise Reduction for Buildings. Reference should also be made to the Acoustics Ventilation & Overheating Residential Design Guide 2020. Following this, a scheme detailing measures, which are to protect occupants from transport noise shall be submitted to and approved in writing by the Local Planning Authority. It shall be implemented and validated prior to occupation. Reason: To protect residents against the impact of noise from the local environment.
21.No building shall be occupied or use commenced until details of external lighting proposed to be installed within the site is submitted to and approved in writing by the Local Planning Authority. The lighting shall be provided and operated in strict accordance with the approved scheme. Reason: Insufficient information has been supplied with the application to judge the impact arising from any external lighting required in connection with the building or use. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use will protect residential amenity.
22.Minor (up to 9 units): All dwellings hereby approved shall be constructed to comply with Part M4(2) of the Building Regulations - Accessible and Adaptable Dwellings. Reason: In order to comply with national optional technical standards as required by Policy D7 of the London Plan.
23.All dwellings hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency. Reason: In order to comply with national optional technical standards as required by Policy SI5 of the London Plan.
24.Any boilers installed in the development hereby approved shall be Ultra-Low NOx boilers with maximum NOx Emissions less than 40 mg/kWh. Where any installations do not meet this emissions standard it should not be operated without the fitting of suitable NOx abatement equipment or technology as determined by a specialist to ensure comparable emissions. The installation of the boilers shall be carried out in strict accordance with these details and shall thereafter be permanently retained. Reason: To minimise the impact of building emissions on local air quality.
25.a) Prior to commencement of any above ground works, a full and detailed application for the Secured by Design award scheme shall be submitted to the Local Planning Authority and the Metropolitan Police NE Designing out Crime Office, demonstrating how Secured by Design Certification will be achieved for this scheme. b) Prior to occupation, the development shall achieve a Certificate of Compliance to the relevant Secure by Design Guide(s) submitted to and approved in writing by the Local Planning Authority in conjunction with the Metropolitan Police. The development shall be carried out in accordance with the approved details and thereafter shall be fully retained and maintained as such for the lifetime of the development. Reason: In the interest of creating safer, sustainable communities.
26.In aiming to satisfy any Secured by Design condition, the applicant must seek advice of the Metropolitan Police Service Designing out Crime Officers (DOCOs) to achieve accreditation. The services of MPS DOCOs are available free of charge and can be contacted via docomailbox.ne@met.police.uk.
27.A Groundwater Risk Management Permit from Thames Water will be required for discharging groundwater into a public sewer. Any discharge made without a permit is deemed illegal and may result in prosecution under the provisions of the Water Industry Act 1991. We would expect the developer to demonstrate what measures he will undertake to minimise groundwater discharges into the public sewer. Permit enquiries should be directed to Thames Water's Risk Management Team by telephoning 020 3577 9483 or by emailing trade.effluent@thameswater.co.uk. Application forms should be completed online via www.thameswater.co.uk. Please refer to the Wholeshale; Business customers; Groundwater discharges section.
28.Changes to the public highway (including permanent or temporary access) - Planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted considered and agreed. If new or amended access is required (whether temporary or permanent), there may be a requirement for the diversion or protection of third party utility plant or highway authority assets and it is recommended that early involvement with the relevant statutory undertaker takes place. The applicant must contact Engineering Services on highwaysDSO@havering.gov.uk to discuss the scheme and commence the relevant highway approvals process. Please note that unauthorised work on the highway is an offence. Highway legislation - The developer (including their representatives and contractors) is advised that planning consent does not discharge the requirements of the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed for any highway works (including temporary works of any nature) required during the construction of the development. Please note that unauthorised work on the highway is an offence. Temporary use of the public highway - The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a licence from the Council. If the developer required scaffolding, hoarding or mobile cranes to be used on the highway, a licence is required and Street Management should be contacted to make the necessary arrangements. Please note that unauthorised use of the highway for construction works is an offence. Surface water management - The developer is advised that surface water from the development in both its temporary and permanent states should not be discharged onto the highway. Failure to prevent such is an offence.
29.The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). The Mayoral CIL levy rate for Havering is 25/m² and is chargeable for each additional square metre of residential gross internal [floor] (GIA). Based upon the information supplied with the application, £22,175 would be payable due to result in new properties with a combined gross internal floor area of 867m² of GIA, however this may be adjusted subject to indexation. The proposal is also liable for Havering Council's CIL. Havering's CIL charging rate for residential is £125m² (Zone A for each additional square metre of GIA. Based upon the information supplied with the application, £110,875 would be payable, subject to indexation. These charges are levied under s.206 of the Planning Act 2008. CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website. You are also advised to visit the planning portal website where you can download the appropriate document templates at http://www.planningportal.gov.uk/planning/applications/howtoapply/whattosubmit/cil.
30.Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with paragraph 38 of the National Planning Policy Framework, improvements required to make the proposal acceptable were negotiated with the agents via email in February 2024. The revisions involved increasing the height of the proposed development. The amendments were subsequently submitted on 14/02/2024.