No.Condition Text
1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice). Reason:- The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted.
3.No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of: a) parking of vehicles of site personnel and visitors; b) storage of plant and materials; c) dust management controls; d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities; e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority; f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities; g) siting and design of temporary buildings; h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies; i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded. And the development shall be carried out in accordance with the approved scheme and statement. Reason:- Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects residential amenity.
4.No above ground works shall take place in relation to any of the development hereby approved until samples of all materials to be used in the external construction of the buildings are submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials. Reason:- Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. Submission of samples prior to commencement will ensure that the appearance of the proposed development will harmonise with the character of the surrounding area..
5.No above ground works shall take place in relation to any of the development hereby approved until there has been submitted to and approved by the Local Planning Authority a scheme of hard and soft landscaping, which shall include indications of all existing trees and shrubs on the site, and details of any to be retained, together with measures for the protection in the course of development. All planting, seeding or turfing comprised within the scheme shall be carried out in the first planting season following completion of the development and any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority. Reason:- Insufficient information has been supplied with the application to judge the appropriateness of the hard and soft landscaping proposed. Submission of a scheme prior to commencement will ensure that the development achieves a satisfactory level of landscape quality.
6.Notwithstanding the details shown on submitted drawings no building shall be occupied or use commenced until refuse and recycling facilities are provided in accordance with details which shall previously have been submitted to and approved in writing by the Local Planning Authority. The refuse and recycling facilities shall be permanently retained thereafter. Reason:- Insufficient information has been supplied with the application to judge how refuse and recycling will be managed on site. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use will protect the amenity of occupiers of the development and also the locality generally.
7.Notwithstanding the details shown on submitted drawings no building shall be occupied or use commenced until cycle storage is provided in accordance with details previously submitted to and approved in writing by the Local Planning Authority. The cycle storage shall be permanently retained thereafter. Reason: Insufficient information has been supplied with the application to demonstrate what facilities will be available for cycle parking. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use is in the interests of providing a wide range of facilities for non-motor car residents and sustainability.
8.Hard surface porus/run-off - application site - All hard surfaces hereby approved as part of the development (including any sub-base) shall be made of porous materials or provision shall be made to direct run-off water from the hard surface to a permeable or porous area or surface within the curtilage of the application site. Reason: In order to ensure no water run-off from the hard surface which would contribute to risk of flooding.
9.Prior to first occupation of the development hereby approved, details of all proposed walls, fences and boundary treatment shall be submitted to, and approved in writing by, the Local Planning Authority. The boundary development shall then be carried out in accordance with the approved details and retained permanently thereafter to the satisfaction of the Local Planning Authority. Reason: Insufficient information has been supplied with the application to judge the appropriateness of any boundary treatment. Submission of this detail prior to commencement will protect the visual amenities of the development and prevent undue overlooking of adjoining property.
10.All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works, including any works of demolition; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays. Reason: To protect residential amenity.
11.Prior to the first occupation of the proposed dwellings hereby approved, the area set aside for car parking shall be laid out and surfaced to the satisfaction of the Local Planning Authority and retained permanently thereafter for the accommodation of vehicles visiting the site and shall not be used for any other purpose. Reason: To ensure that car parking accommodation is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety, and that the development accords with Policy 24 of the Havering Local Plan.
12.Building Regulations - All dwellings hereby approved shall be constructed to comply with Part M4(2) of the Building Regulations - Accessible and Adaptable Dwellings. Reason: In order to comply with Policy 7 of the Havering Local Plan and Policy D7 of the London Plan.
13.Water efficiency - All dwellings hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency. Reason: In order to comply with Policy SI 5 of the London Plan..
14.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 in accordance with the Order, no extension or enlargement (including additions to roofs/porches) shall be made to the dwellinghouse(s) hereby permitted or any detached building erected without the express permission in writing of the Local Planning Authority. Reason:- In the interests of amenity and to enable the Local Planning Authority to retain control over future development.
15.Prior to the commencement of any development an assessment shall be undertaken of the impact of noise emanating from the A127 (Southend Arterial Road) upon the development. Reference should be made to the "good" standard to be found in the World Health Organisation Guidelines for Community Noise 1999 and BS8233:2014 Guidance on Sound Insulation and Noise Reduction for Buildings. Reference should also be made to the Acoustics Ventilation & Overheating Residential Design Guide 2020. Following this, a scheme detailing measures, which are to protect occupants from transport noise shall be submitted to and approved in writing by the Local Planning Authority. It shall be implemented and validated prior to occupation. Reason: To protect residents against the impact of noise from the local environment.
16.The acoustic design and performance of the private and communal amenity spaces within the development shall be agreed in writing with the Local Authority before construction commences. The design and construction of these areas shall provide the performance for private and communal external amenity spaces with reference to British Standard BS8233: 2014 - Guidance on Sound Insulation and Noise Reduction for buildings - Code of practice. This may necessitate the developer to employ a suitably qualified acoustics consultant to carry out any necessary survey and provide recommendations. If the design of these areas cannot meet the recommended levels, due to the excessive noise climate, alternative amenity spaces for those areas affected should be provided which meet the criteria within BS8233:2014 and agreed in writing with the Local Authority before development commences. Reason: To protect the occupiers of the properties constructed from excessive noise levels from the local environment in external amenity spaces.
17.Prior to the first occupation of the development, details shall be submitted to and agreed in writing by the Local Planning Authority for the installation of Ultra-Low NOx boilers with maximum NOx Emissions less than 40 mg/kWh. Where any installations do not meet this emissions standard it should not be operated without the fitting of suitable NOx abatement equipment or technology as determined by a specialist to ensure comparable emissions. The installation of the boilers shall be carried out in strict accordance with the agreed details and shall thereafter be permanently retained. Reason: To minimise the impact of building emissions on local air quality.
18.Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with paragraph 38 of the National Planning Policy Framework, improvements required to make the proposal acceptable were negotiated with the planning agent. The revisions involved alterations to the location of the third crossover in line with Highway comments.. The amendments were subsequently submitted on 17-02-2023.
19.The applicant is reminded that the proposed vehicle crossovers are subject to the removal of the street lighting column as shown on drawing no. PA-02 Rev B. The construction of the proposed vehicle crossovers will be subject to confirmation from the Council's Street Lighting team that it is feasible for them relocate the lamp column whilst maintaining the lighting levels in accordance with British Standard. Failure to obtain the appropriate consent may necessitate changes to the scheme as approved and may impede the applicant's ability to implement the consent as approved (therefore contravening Conditions 2 and 11 of this approval)