The London Borough Of Havering - Home page

No.Condition Text
1.The development hereby permitted shall not be carried out otherwise than in complete accordance with the plans detailed on page 1 of the decision notice approved by the Local Planning Authority. Reason: The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted.
2.No building shall be occupied until the car/vehicle parking area shown on the approved plans has been provided, and thereafter, the area shall be kept free of obstruction and available for the parking of vehicles associated with the development Reason: To ensure that car parking is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety, and that the development accords with the Development Control Policies Development Plan Document Policy DC33.
3.The development hereby permitted shall be constructed with external materials as previously approved under application Q0033.16. Reason: To ensure that the appearance of the proposed development will harmonise with the character of the surrounding area and in order that the development accords with the LDF Development Control Policies Development Plan Document Policy DC61.
4.The development hereby permitted shall be landscaped in accordance with the details as previously approved under Q0033.16. Reason: To enhance the visual amenities of the development and in order that the proposal complies with Policies DC60 and DC61 and the SPD on Landscaping
5.Prior to the occupation of the development hereby approved, details of all proposed walls, fences and boundary treatment shall be submitted to, and approved in writing by, the Local Planning Authority. The boundary development shall then be carried out in accordance with the approved details and retained permanently thereafter to the satisfaction of the Local Planning Authority. Reason: Insufficient information has been supplied with the application to judge the appropriateness of any boundary treatment. Submission of this detail prior to commencement will protect the visual amenities of the development, prevent undue overlooking of adjoining property and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61.
6.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no extensions, roof extensions, roof alterations or outbuildings, aside from outbuildings less than 10 cubic metres, shall take place unless permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority. Reason: In the interests of amenity and to enable the Local Planning Authority to retain control over future development, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
7.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no window or other opening (other than those shown on the submitted and approved plan,) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority. Reason: In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61.
8.The development hereby permitted shall be implemented in accordance with the wheel washing details as previously approved under application Q0033.16. The approved facilities shall be permanently retained and used at relevant entrances to the site throughout the course of construction works. Reason: In order to prevent materials from the site being deposited on the adjoining public highway, in the interests of highway safety and the amenity of the surrounding area.
9.No building shall be occupied until cycle storage is provided in accordance with details previously submitted to and approved in writing by the Local Planning Authority. The cycle storage shall be permanently retained thereafter. Reason: Insufficient information has been supplied with the application to demonstrate what facilities will be available for cycle parking. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use is in the interests of providing a wide range of facilities for non-motor car residents and sustainability.
10.No building shall be occupied until refuse and recycling facilities are provided in accordance with details which shall previously have been submitted to and approved in writing by the Local Planning Authority. The refuse and recycling facilities shall be permanently retained thereafter. Reason: Insufficient information has been supplied with the application to judge how refuse and recycling will be managed on site. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use will protect the amenity of occupiers of the development and also the locality generally and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61.
11.All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays. Reason: To protect residential amenity, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61.
12.The development hereby permitted shall be implemented in accordance with the construction methodology details as previously approved under application Q0033.16. Reason: To protect residential amenity, and in order that the development accords the Development Control Policies Development Plan Document Policy DC61.
13.The development hereby permitted shall be implemented in accordance with the secure by design details as previously approved under application Q0033.16. Reason: In the interest of creating safer, sustainable communities, reflecting guidance set out in Policies CP17 and DC63 of the Core Strategy and Development Control Policies Development Plan Document and the NPPF.
14.No building shall be occupied until external lighting is provided in accordance with details previously submitted to and approved in writing by the Local Planning Authority. The lighting shall be provided and operated in strict accordance with the approved scheme. Reason: Insufficient information has been supplied with the application to judge the impact arising from any external lighting required in connection with the building or use. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use will protect residential amenity and ensure that the development accords with the Development Control Policies Development Plan Document Policy DC61.
15.All dwellings hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency. Reason: In order to comply with Policy 5.15 of the London Plan.
16.Prior to the first occupation of the development hereby permitted, provision shall be made for the installation of a domestic sprinkler system to each of the three dwellings. Thereafter this provision shall be retained permanently unless otherwise agreed in writing by the Local Planning Authority. Reason: In lieu of adequate access for a Fire Brigade pump appliance and in the interest of amenity and safety for future occupiers.
17.The proposed windows to the northeast flank elevation shall be situated at least 1.7m above finished floor level and be permanently glazed with obscure glass. Reason: In the interests of privacy, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61.
18.A fee is required when submitting details pursuant to the discharge of conditions. In order to comply with the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, which came into force from 22.11.2012, a fee of £97 per request or £28 where the related permission was for extending or altering a dwellinghouse, is needed.
19.Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraphs 186-187 of the National Planning Policy Framework 2012.
20.The Applicant is advised that planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted, considered and agreed. Any proposals which involve building over the public highway as managed by the London Borough of Havering, will require a licence and the applicant must contact StreetCare, Traffic & Engineering on 01708 433750 to commence the Submission/ Licence Approval process. Should this application be granted planning permission, the developer, their representatives and contractors are advised that this does not discharge the requirements under the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed for any highway works (including temporary works) required during the construction of the development. The developer is advised that if construction materials are proposed to be kept on the highway during construction works then they will need to apply for a license from the Council.
21.Please note that by virtue of Condition(s) 15, you are required to notify the relevant Building Control body of these conditions as part of any application.
22.Before occupation of the residential units hereby approved, it is a requirement to have the property/properties officially Street Named and Numbered by our Street Naming and Numbering Team. Official Street Naming and Numbering will ensure that that Council has record of the property/properties so that future occupants can access our services. Registration will also ensure that emergency services, Land Registry and the Royal Mail have accurate address details. Proof of having officially gone through the Street Naming and Numbering process may also be required for the connection of utilities. For further details on how to apply for registration see: https://www.havering.gov.uk/Pages/Services/Street-names-and-numbering.aspx