No. | Condition Text |
---|
1. | The development hereby permitted may only be carried out in accordance with detailed plans and particulars which shall previously have been submitted to and approved by the Local Planning Authority, showing the layout, scale and appearance of the buildings, the means of access thereto, and landscaping, including all matters defined as "landscaping" in the Town and Country Planning (Development Management Procedure) (England) Order 2010 (herein after called "the reserved matters").
Reason:-
The particulars submitted are insufficient for consideration of the details mentioned and the application is expressed to be for outline permission only. |
2. | Application for approval of the reserved matters shall be submitted to the Local Planning Authority within five years from the date of this permission.
Reason:-
To comply with Section 92 of the Town and Country Planning Act 1990. |
3. | The development to which this permission relates must be begun not later than the expiration of five years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last reserved matter to be approved.
Reason:-
To comply with Section 92 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
4. | The community use of the new sports facilities shall not take place other than between the hours of 06:00 and 23:00 on Mondays to Saturdays and between the hours of 07:00 and 22:00 on Sundays, Bank or Public holidays.
Reason:-
To enable the Local Planning Authority to retain control in the interests of amenity, and in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
5. | No development shall take place until a scheme of vehicle cleansing has been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be undertaken in accordance with the approved details, which shall be retained for the life of the development.
The submitted scheme will provide the following details:
a) A plan showing where vehicles will be parked within the site, to be inspected for mud and debris and cleaned if required. The plan should show where construction traffic will access and exit the site from the public highway.
b) A description of how the parking area will be surfaced, drained and cleaned to prevent mud, debris and muddy water being tracked onto the public highway.
c) A description of how vehicles will be checked before leaving the site, including their wheels, the underside of vehicles, mud flaps and wheel arches.
d) A description of how vehicles will be cleaned.
e) A description of how dirty/muddy water be dealt with after being washed off the vehicles.
f) A description of any contingency plan to be used in the event of a break-down of the wheel washing arrangements.
g) A description of how any material tracked into the public highway will be removed.
Should material be deposited in the public highway, then all operations at the site shall cease until such time as the material has been removed in accordance with the approved details.
Reason:-
In order to prevent materials from the site being deposited on the adjoining public highway, in the interests of highway safety and the amenity of the surrounding area, and in order that the development accords with the Development Control Policies Development Plan Document Policies DC61 and DC32. |
6. | No building shall be occupied or use commenced until the car/vehicle parking area shown on the approved plans has been be completed, and thereafter, the area shall be kept free of obstruction and available for the parking of vehicles associated with the development.
Reason:-
To ensure that there are adequate parking facilities to serve the development in the interests of highway safety. |
7. | No building shall be occupied or use commenced until cycle storage is provided in accordance with details previously submitted to and approved in writing by the Local Planning Authority. The cycle storage shall be permanently retained thereafter.
Reason:-
In the interests of providing a wide range of facilities for non-motor car residents, in the interests of sustainability. |
8. | No works shall take place in relation to any of the development hereby approved until details of surface water attenuation/storage are submitted to and approved in writing by the Local Planning Authority. Surface water attenuation/storage shall be provided in accordance with the approved details.
Reason:-
To prevent the increased risk of flooding, and in order that the development accords with the Development Control Policies Development Plan Document Policies DC61 and DC49. |
9. | No works shall take place in relation to any of the development hereby approved until a landfill gas risk assessment has been submitted to and approved in writing by the Local Planning Authority. Where a risk from migrating gas is identified, appropriate works to mitigate the effects of gas shall be incorporated in detailed plans to be approved by the Local Planning Authority.
Reason:-
To protect people on or close to the site from the risks of associated migrating landfill gas, and in order that the development accords with LDF Policy DC53. |
10. | SC63 (Construction Methodology) (Pre Commencement)
No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of:
a) parking of vehicles of site personnel and visitors;
b) storage of plant and materials;
c) dust management controls;
d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities;
e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority;
f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities;
g) siting and design of temporary buildings;
h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies;
i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded.
And the development shall be carried out in accordance with the approved scheme and statement.
Reason:-
To protect residential amenity, and in order that the development accords the Development Control Policies Development Plan Document Policy DC61. |
11. | All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays.
Reason:-
To protect residential amenity, and in order that the development accords with the Development Control Policies Development Plan Document Policy DC61. |
12. | No works shall take place in relation to any of the development hereby approved until samples of all materials to be used in the external construction of the building(s) shall be submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials.
Reason:-
To ensure that the appearance of the proposed development will harmonise with the character of the surrounding area and comply with Policy DC61 of the Development Control Policies Development Plan Document. |
13. | Statement Required by Article 31 (cc) of the Town and Country Planning (Development Management) Order 2010: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraphs 186-187 of the National Planning Policy Framework 2012. |