1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.The proposed development hereby approved shall be constructed in accordance with the materials detailed on drawing 0861-PL-11 Rev B unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure that the appearance of the proposed development will harmonise with the character of the surrounding area.
3.No demolition or development shall take place until a written scheme of investigation (WSI) has been submitted to and approved by the local planning authority in writing. For land that is included within the WSI, no demolition or development shall take place other than in accordance with the agreed WSI, which shall include the statement of significance and research objectives, and A. The programme and methodology of site investigation and recording and the nomination of a competent person(s) or organisation to undertake the agreed works B. Where appropriate, details of a programme for delivering related positive public benefits C. The programme for post-investigation assessment and subsequent analysis, publication & dissemination and deposition of resulting material. This part of the condition shall not be discharged until these elements have been fulfilled in accordance with the programme set out in the WSI Historic England, 4th Floor, Cannon Bridge House, 25 Dowgate Hill, London EC4R 2YA Telephone 020 7973 3700 Facsimile 020 7973 3001 HistoricEngland.org.uk Please note that Historic England operates an access to information policy. Correspondence or information which you send us may therefore become publicly available. Informative The written scheme of investigation will need to be prepared and implemented by a suitably professionally accredited archaeological practice in accordance with Historic England's Guidelines for Archaeological Projects in Greater London. This condition is exempt from deemed discharge under schedule 6 of The Town and Country Planning (Development Management Procedure) (England) Order 2015. Reason:- Important archaeological remains may exist on this site. The Local Planning Authority wishes to ensure that an "archaeological watching brief" is carried out during the development's groundworks so that archaeological remains not protected by other measures are investigated and recorded.
4.Prior to the commencement of the development hereby approved, an Air Quality Impact Assessment and Air Quality Neutral Assessment shall be submitted to and agreed by the Local Planning Authority. The assessments shall detail; · Calculations of the predicted building emissions and comparison against the Building Emission Benchmarks; · Calculations of the predicted transport emissions and comparison against the Transport Emission Benchmarks; · Mitigation (if required) or contribution to off-setting the development's emissions, taking into account the most up to date Defra's damage costs and relevant guidance on offsetting payments. b) The use hereby permitted shall not commence until all measures identified in the Air Quality Neutral Assessment have been shown to be implemented to the satisfaction of the Local Planning Authority in writing. Reason: To ensure that the development will not lead to further deterioration of existing poor air quality within the designated Air Quality Management Area and to comply with Policy SI 1 of the London Plan and relevant guidance, as subsequently amended.
5.Prior to the commencement of any works on site, a detailed Dust Management Plan, shall be submitted to and agreed in writing by the Local Planning Authority setting out dust and emissions control measures to be employed on site, in accordance with the Institute of Air Quality Management Guidance on the assessment of dust from demolition and construction. Reason: To reduce emissions from the use of the site and to comply with policy SI 1 of the London Plan.
6.No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of: a. TheÃ??????????¢?¯site access point(s) of all vehicles to the site during the construction phase b. parking of vehicles of site personnel and visitors; c. storage of plant and materials; d. Wheel washing facilities. e. Measures to monitor and control the emission of dust and dirt during construction. f. measures for minimising the impact of noise and, if appropriate, vibration arising from construction activities; g. predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority; h. a scheme for monitoring noise and, if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authority; i. siting and design of temporary buildings if required; j. scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies; k. details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically prohibited. And the development shall be carried out in accordance with the approved scheme and statement. Reason: Insufficient information has been supplied with the application in relation to the proposed construction methodology.
7.If the Air Quality Impact Assessment indicates that mitigation is required, the developer shall submit for the written approval of the Local Planning Authority full details of mitigation measures that will be implemented to offset the excess in transport / building emissions before the development commences. The use hereby permitted shall not commence until the approved measures have been shown to be implemented to the satisfaction of the Local Planning Authority in writing. Reason: To comply with Policy SI 1 of the London Plan, in relation to the Air Quality Neutral requirements
8.Prior to the commencement of any works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority; a) A Phase I (Desktop Study) Report documenting the history of the site, its surrounding area and the likelihood of contaminant/s, their type and extent incorporating a Site Conceptual Model. b) A Phase II (Site Investigation) Report if the Phase I Report confirms the possibility of a significant risk to any sensitive receptors. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the sites ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors. c) A Phase III (Remediation Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation. A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to all receptors must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and procedure for dealing with previously unidentified any contamination. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. d) Following completion of measures identified in the approved remediation scheme mentioned in 1(c) above, a "Verification Report" that demonstrates the effectiveness of the remediation carried out, any requirement for longer-term monitoring of contaminant linkages, maintenance and arrangements for contingency action, must be produced, and is subject to the approval in writing of the Local Planning Authority. Reason: To protect those engaged in construction and occupation of the development from potential contamination and in order that the development accords with Development Control Policies Development Plan Document Policy DC53.
9.If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until a remediation strategy detailing how this unsuspected contamination shall be dealt with has been submitted to and approved in writing by the local planning authority. The remediation strategy shall be implemented as approved. b) Following completion of the remediation works as mentioned in (a) above, a 'Verification Report' must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved. Reason: To ensure that any previously unidentified contamination found at the site is investigated and satisfactorily addressed in order to protect those engaged in construction and occupation of the development from potential contamination.
10.Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with paragraph 38 of the National Planning Policy Framework, improvements required to make the proposal acceptable were negotiated with Kevin Lyons via email on 8/12/22. The revisions involved the reduction of the height of the building and a change in the materials used. The amendments were subsequently submitted on 12/12/22.