| No. | Condition Text |
|---|
| 1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
| 2. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
For the avoidance of doubt and to ensure that the development is carried out as approved. |
| 3. | The proposed development hereby approved shall be constructed in accordance with the materials detailed under the Materials Section of the application form unless otherwise agreed in writing by the Local Planning Authority.
Reason: To ensure that the appearance of the proposed development will harmonise with the character of the surrounding area. |
| 4. | No demolition or construction works, or deliveries, into the site shall take place other than between the hours of 08.00 to 18.00 on Monday to Friday and 08.00 to 13.00 hours on Saturdays unless agreed in writing with the local planning authority. No demolition or construction works, or deliveries shall take place on Sundays, Bank or Public Holidays unless otherwise agreed in writing by the local planning authority.
Reason: To protect residential amenity. |
| 5. | a) If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be
carried out until a remediation strategy detailing how this unsuspected contamination shall be dealt with has been submitted to and approved in writing by the local planning authority. The remediation strategy shall be implemented as approved.
b) Following completion of the remediation works as mentioned in (a) above, a Verification Report must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved.
Reason:
To ensure that any previously unidentified contamination found at the site is Investigated and satisfactorily addressed in order to protect those engaged in construction and occupation of the development from potential contamination. |
| 6. | Before any phase of the hearby permitted development commences, the construction methodology shall de agreed in writing with the Local Planning Authority to ensure that the impact on nearby noise sensitive premises is minimised from activities such as (but not exclusively) excavation, piling, vehicle and plant movements, etc. Only construction methods in accordance with the written approval shall be undertaken.
Reason: in the interests of the amenities of noise sensitive properties |
| 7. | Prior to the commencement of any works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority:
a)
A Phase I (Desktop Study) Report documenting the history of the site, its surrounding area and the likelihood of contaminant/s, their type and extent incorporating a Site Conceptual Model.
A Phase Il (Site Investigation) Report if the Phase I Report confirms the possibility of a significant risk to any sensitive receptors. This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the sites ground conditions. An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors.
c)
A Phase III (Remediation Strategy) Report if the Phase Il Report confirms the presence of a significant pollutant linkage requiring remediation. A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to all receptors must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and procedure for dealing with previously unidentified any contamination. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
Following completion of measures identified in the approved remediation scheme mentioned in 1(c) above, a "Verification Report" that demonstrates the effectiveness of the remediation carried out, any requirement for longer-term monitoring of contaminant linkages, maintenance and arrangements for contingency action, must be produced, and is subject to the approval in writing of the Local Planning Authority.
Reason: To protect those engaged in construction and occupation of the development from potential
contamination and in order that the development accords with Development Control Policies Development Plan Document Policy DC53. |
| 8. | The outbuilding hereby approved shall only be implemented in accordance with the Aboricultural method statements and tree protection plan as set out in the Aboricultural Impact Assessment and Method Statements dated 13th April 2024, byTree Planning Solutions Ltd.
Reason: In order to protect the existing vegetation on site in the interest of the visual amenity of the area, in accordance with Local Plan Policy 27. |
| 9. | Statement Required by Article 35(2) of the Town and Country Planning (Development Management) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraph 38 of the National Planning Policy Framework. |