| No. | Condition Text |
|---|
| 1. | The development to which this permission relates must be commenced not later than three years from the date of this permission.
Reason:-
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). |
| 2. | The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).
Reason:-
The Local Planning Authority consider it essential that the whole of the development is carried out and that no departure whatsoever is made from the details approved, since the development would not necessarily be acceptable if partly carried out or carried out differently in any degree from the details submitted. Also, in order that the development accords with Development Control Policies Development Plan Document Policy DC61. |
| 3. | No works shall take place in relation to any of the development hereby approved until details of surface water drainage works are submitted to and approved in writing by the Local Planning Authority. Surface water drainage shall be provided in accordance with the approved details.
Reason:-
Surface water drainage works are required on site to prevent the risk of flooding. Submission of a scheme prior to commencement will ensure that the measures to be employed are technically sound and that the development accords with the Development Control Policies Development Plan Document Policies DC49 and DC61. |
| 4. | Aggregate shall only be stored within the aggregate bays hereby granted.
Reason: In the interests of local amenity. |
| 5. | Notwithstanding the approved drawings, the proposed portacabins should be raised by 300mm above ground floor level.
Reason: To ensure the safety of people on the site in the event of flooding. |
| 6. | Prior to the use hereby permitted being commenced details shall be submitted to and for the consideration and written approval of the Local Planning Authority of the proposed means of evacuation in the event of site flooding. The Site Evacuation Strategy should be developed to cover the information provided for staff and visitors, warning measures and methods for evacuation to a place of safety.
Reason: To ensure the safety of people on the site in the event of flooding. |
| 7. | Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with para 186-187 of the National Planning Policy Framework 2012, improvements required to make the proposal acceptable were negotiated with the agent between January and May 2018. The amendments were finally submitted on 3rd May 2018. |
| 8. | With regards to surface water drainage it is the responsibility of the developer to make proper provision for drainage to ground, water courses or a suitable sewer. In respect of surface water it is recommended that the applicant should ensure that storm flows are attenuated or regulated into the receiving public network through on or off site storage. When it is proposed to connect to a combined public sewer, the site drainage should be separate and combined at the final manhole nearest the boundary. Connections are not permitted for the removal of Ground Water. Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required. They can be contacted on 0845 850 2777. |
| 9. | A fee is required when submitting details pursuant to the discharge of conditions. In order to comply with the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, (as amended), a fee of £116 per request or £34 where the related permission was for extending or altering a dwellinghouse, is needed. |
| 10. | The applicant is advised by the Council's Environmental Health Team that an application must be made for a LAPC under Part 1 of the Environmental Protection Act (1990) to ensure dust production is mitigated. |