No.Condition Text
1.The development to which this permission relates must be commenced not later than three years from the date of this permission. Reason:- To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2.The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice). Reason:- For the avoidance of doubt and to ensure that the development is carried out as approved.
3.Prior to above ground works, a written specification of external walls and roof materials to be used in the construction of the building(s) shall be submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials. Reason:- Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used. Submission of a written specification prior to above ground works will ensure that the appearance of the proposed development will harmonise with the character of the surrounding area.
4.Before the dwellings hereby permitted are first occupied, the car parking provision as shown on drawing No.'s NAD.21.207-02 Revision H and NAD.21.207-03 Revision H shall be laid out and implemented to the full satisfaction of the Local Planning Authority and thereafter this car parking provision shall remain unobstructed and permanently available for use, unless otherwise agreed with the Local Planning Authority. Reason:- To ensure that car parking accommodation is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety, and that the development accords with Policy 24 of the Havering Local Plan.
5.All hard surfaces hereby approved as part of the development (including any sub-base) shall be made of porous materials or provision shall be made to direct run-off water from the hard surface to a permeable or porous area or surface within the curtilage of the application site. Reason:- In order to ensure no water run-off from the hard surface which would contribute to risk of flooding.
6.Prior to the first occupation of the dwellings hereby approved and notwithstanding the details on Drawing No.'s NAD.21.207-02 Revision H and NAD.21.207-03 Revision H, a scheme of hard and soft landscaping, which shall include indications of all existing trees and shrubs on the site, and details of any to be retained, together with measures for the protection in the course of development shall be submitted to and approved by the Local Planning Authority. All planting, seeding or turfing comprised within the scheme shall be carried out in the first planting season following completion of the development and any trees or plants which within a period of 5 years from completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local Planning Authority. Reason:- Reason: Insufficient information has been supplied with the application to judge the appropriateness of the hard and soft landscaping proposed. Submission of a scheme prior to first occupation of the dwellings hereby approved will ensure that the development achieves a satisfactory level of landscape quality.
7.Prior to the first occupation of the development hereby approved, details of all proposed walls, fences and boundary treatment, including details of the acoustic fence on the north western boundary of the site as shown on Drawing No. NAD.21.207-02 Revision H, shall be submitted to, and approved in writing by, the Local Planning Authority. The boundary development and acoustic fence shall then be carried out in accordance with the approved details and retained permanently thereafter to the satisfaction of the Local Planning Authority. Reason: Insufficient information has been supplied with the application to judge the appropriateness of any boundary treatment and acoustic fencing. Submission of this detail prior to the first occupation of the development hereby approved will protect the visual amenities of the development, prevent undue overlooking of adjoining property.
8.Prior to the first occupation of the dwellings hereby permitted, the proposed cycle stores shown on Drawing No.'s NAD.21.207-02 Revision H and NAD.21.207-03 Revision H shall be provided to the satisfaction of the Local Planning Authority. The cycle storage shall be permanently retained thereafter. Reason:- In the interests of providing a wide range of facilities for non-motor car residents and sustainability.
9.Notwithstanding the details on Drawing No.'s NAD.21.207-02 Revision H and NAD.21.207-03 Revision H, no building shall be occupied or use commenced until refuse and recycling facilities are provided in accordance with details which shall previously have been submitted to and approved in writing by the Local Planning Authority. The refuse and recycling facilities shall be permanently retained thereafter. Reason:- Reason: Insufficient information has been supplied with the application to judge how refuse and recycling will be managed on site. Submission of this detail prior to occupation in the case of new building works or prior to the use commencing in the case of changes of use will protect the amenity of occupiers of the development and also the locality generally and ensure that the development accords with Policy 35 of the Havering Local Plan.
10.Before the development hereby permitted is first commenced, vehicle cleansing facilities to prevent mud being deposited onto the public highway during construction works shall be provided on site in accordance with details to be first submitted to and approved in writing by the Local Planning Authority. The approved facilities shall be retained thereafter and used at relevant entrances to the site throughout the duration of construction works. If mud or other debris originating from the site is deposited in the public highway, all on-site operations shall cease until it has been removed. The submission will provide; a) A plan showing where vehicles will be parked within the site to be inspected for mud and debris and cleaned if required. The plan should show where construction traffic will access and exit the site from the public highway. b) A description of how the parking area will be surfaced, drained and cleaned to prevent mud, debris and muddy water being tracked onto the public highway; c) A description of how vehicles will be checked before leaving the site - this applies to the vehicle wheels, the underside of vehicles, mud flaps and wheel arches. d) A description of how vehicles will be cleaned. e) A description of how dirty/ muddy water be dealt with after being washing off the vehicles. f) A description of any contingency plan to be used in the event of a break-down of the wheel washing arrangements. Reason: Insufficient information has been supplied with the application in relation to wheel washing facilities. Submission of details prior to commencement will ensure that the facilities provided prevent materials from the site being deposited on the adjoining public highway, in the interests of highway safety and the amenity of the surrounding area.
11.No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of: a) parking of vehicles of site personnel and visitors; b) storage of plant and materials; c) dust management controls; d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities; e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority; f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities; g) siting and design of temporary buildings; h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies; i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded. And the development shall be carried out in accordance with the approved scheme and statement. Reason:- Insufficient information has been supplied with the application in relation to the proposed construction methodology. Submission of details prior to commencement will ensure that the method of construction protects residential amenity.
12.Prior to the first occupation of the proposed dwellings hereby permitted, all parking spaces shall include the provision of suitable infrastructure to allow the future installation of charging facilities for electric or Ultra-Low Emission vehicles. Reason: Passive provision prior to first occupation of the proposed dwellings hereby permitted will ensure that the development adequately incorporates measures to allow the use of electric vehicles by future occupiers in accordance with Policy T6.1 of the London Plan.
13.Prior to the first occupation of the development, details shall be submitted to and agreed in writing by the Local Planning Authority for the installation of Ultra-Low NOx boilers with maximum NOx Emissions less than 40 mg/kWh. Where any installations do not meet this emissions standard it should not be operated without the fitting of suitable NOx abatement equipment or technology as determined by a specialist to ensure comparable emissions. The installation of the boilers shall be carried out in strict accordance with the agreed details and shall thereafter be permanently retained. Following installation emissions certificates will need to be provided to the Local Planning Authority to verify boiler emissions. Reason: To minimise the impact of building emissions on local air quality.
14.Prior to the first occupation of the proposed dwellings hereby permitted, a scheme for external lighting shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall be implemented in full prior to the first occupation of the development hereby approved and permanently maintained in accordance with the approved details. Reason: In the interests of security and residential amenity and in order that the development accords with Policies 7 and 34 of the Havering Local Plan.
15.No part of the development hereby approved shall be occupied until vehicular access improvements to the highway have been completed in accordance with the details that are to be submitted to and approved in writing by the Local Planning Authority. Reason: To ensure construction of a satisfactory access and in the interests of highway safety, good design, traffic movement and amenity in accordance with Policy 24 of the Havering Local Plan.
16.No works shall take place in relation to any of the development hereby approved until a demolition plan shall be submitted to and approved in writing by the Local Planning Authority, which clearly shows current circumstances, what work is to be eliminated, and a reference to identify the proposed work for the same area. And the demolition works shall be carried out in accordance with the approved Demolition Plan. Reason: Insufficient information has been supplied with the application in relation to the demolition methodology. Submission of details prior to commencement will ensure that the method of demolition protects residential amenity.
17.No works shall take place in relation to any of the development hereby approved until a Construction Traffic Management Plan to control the temporary work zone impacts of the construction project is submitted to and approved in writing by the Local Planning Authority. And the development shall be carried out in accordance with the approved Construction Traffic Management Plan. Reason: Insufficient information has been supplied with the application in relation to the proposed Construction Traffic Management Plans. Submission of details prior to commencement will ensure that the method of construction protects residential amenity.
18.No demolition or development shall take place until a stage 1 written scheme of investigation (WSI) has been submitted to and approved by the local planning authority in writing. For land that is included within the WSI, no demolition or development shall take place other than in accordance with the agreed WSI, and the programme and methodology of site evaluation and the nomination of a competent person(s) or organisation to undertake the agreed works. If heritage assets of archaeological interest are identified by stage 1 then for those parts of the site which have archaeological interest a stage 2 WSI shall be submitted to and approved by the local planning authority in writing. For land that is included within the stage 2 WSI, no demolition/development shall take place other than in accordance with the agreed stage 2 WSI which shall include: A. The statement of significance and research objectives, the programme and methodology of site investigation and recording and the nomination of a competent person(s) or organisation to undertake the agreed works. B. Where appropriate, details of a programme for delivering related positive public benefits. C. The programme for post-investigation assessment and subsequent analysis, publication & dissemination and deposition of resulting material. This part of the condition shall not be discharged until these elements have been fulfilled in accordance with the programme set out in the stage 2 WSI. Reason: To conserve the archaeological interest on the site and in order that the development accords with Policy 28 of the Havering Local Plan, Policy HC1 of the London Plan and the National Planning Policy Framework.
19.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no window or other opening (other than those shown on the submitted and approved plan) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority. Reason:- In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future, and in order that the development accords with Policy 7 of the Havering Local Plan.
20.The roof area of the single storey rear projections of the proposed dwellings in Plots 1-3 hereby permitted shall not be used as a balcony, roof garden or similar amenity area without the grant of further specific permission from the Local Planning Authority. Reason:- In the interests of the amenity of the occupiers of neighbouring dwelling.
21.The proposed utility room window and door on the north western elevation of the proposed dwelling in Plot 1 as shown on Drawing No. NAD.21.207-04 Revision H shall be permanently glazed with obscure glass not less than level 4 on the standard scale of obscurity and shall thereafter be maintained. Reason:- In the interests of privacy.
22.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 Article 3, Schedule 2, Part 1, as amended by the Town and Country Planning (General Permitted Development) (Amendment)(no. 2)(England) Order 2008 Classes A, B, C and E, (or any order revoking and re-enacting that Order with or without modification), no extensions, roof extensions or alterations shall take place to the dwellinghouses in Plots 1-5 and no outbuildings shall be erected in the rear garden of the dwellings in Plots 1-5 with the exception of ancillary structures up to 10 cubic metres in volume, unless permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority. Reason:- In the interests of amenity and to enable the Local Planning Authority to retain control over future development.
23.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (Order) or any other order replacing or amending the said Order, for Class D, no porches shall be erected to the dwellinghouses in Plots 1, 2 and 3, unless permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority. Reason:- In the interests of amenity and to enable the Local Planning Authority to retain control over future development.
24.All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays. Reason:- To protect residential amenity.
25.All dwellings hereby approved shall be constructed to comply with Part M4(2) of the Building Regulations - Accessible and Adaptable Dwellings. Reason: In order to comply with Policy 7 of the Havering Local Plan and Policy D7 of the London Plan.
26.All dwellings hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency. Reason: In order to comply with Policy SI 5 of the London Plan.
27.Statement Required by Article 35 (2) of the Town and Country Planning (Development Management Procedure) (England) Order 2015: In accordance with paragraph 38 of the National Planning Policy Framework, improvements required to make the proposal acceptable were negotiated with Novus Architectural Design via email on 28th March 2022. The revisions involved reducing the height of the proposed dwellings in Plots 1-3 and replacing the crown roofs with pitched roofs, providing areas of soft landscaping in the front gardens of all of the proposed dwellings, hipping the gabled roof on the front elevations of the bungalows in Plots 4 and 5, moving the bungalows in Plots 4 & 5 further away from the side boundaries of the site, swapping the footprint of the bungalows in Plots 4 and 5 and making some minor changes to the site layout including the car parking provision. The amendments were subsequently submitted on 10th March, 19th June, 9th & 10th October 2023.
28.The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). The Mayoral CIL levy rate for Havering is £25/m² and is chargeable for each additional square metre of residential gross internal [floor] (GIA). Based upon the information supplied with the application, £10,525 would be payable due to result in a new residential properties with a net addition of 421 square metres of gross internal floor space, however this may be adjusted subject to indexation. The proposal is also liable for Havering Council's CIL. Havering's CIL charging rate for residential is £125m² (Zone A) for each additional square metre of GIA. Based upon the information supplied with the application, £52,625 would be payable, subject to indexation. These charges are levied under s.206 of the Planning Act 2008. CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability) shortly and you are required to notify the Council of the commencement of the development before works begin. Further details with regard to CIL are available from the Council's website. You are also advised to visit the planning portal website where you can download the appropriate document templates at http://www.planningportal.gov.uk/planning/applications/howtoapply/whattosubmit/cil
29.A fee is required when submitting details pursuant to the discharge of conditions. In order to comply with the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, (as amended), a fee of £116 per request or £34 where the related permission was for extending or altering a dwellinghouse, is needed.
30.Before occupation of the residential/ commercial unit(s) hereby approved, it is a requirement to have the property/properties officially Street Named and Numbered by our Street Naming and Numbering Team. Official Street Naming and Numbering will ensure that that Council has record of the property/properties so that future occupants can access our services. Registration will also ensure that emergency services, Land Registry and the Royal Mail have accurate address details. Proof of having officially gone through the Street Naming and Numbering process may also be required for the connection of utilities. For further details on how to apply for registration see: https://www.havering.gov.uk/Pages/Services/Street-names-and-numbering.aspx
31.Written schemes of investigation will need to be prepared and implemented by a suitably qualified professionally accredited archaeological practice in accordance with Historic England's Guidelines for Archaeological Projects in Greater London. This condition is exempt from deemed discharge under schedule 6 of The Town and Country Planning (Development Management Procedure) (England) Order 2015.